ESC17-00791
| General Inspection | 11/20/2018 | 11/20/2018 | | | |
|
|
|
ESC17-01289
| General Inspection | 11/20/2018 | 11/20/2018 | | | |
|
|
|
ESC17-01749
| General Inspection | 11/20/2018 | 11/20/2018 | | | |
|
|
|
ESC18-01252
| Site Final | 11/16/2018 | 11/20/2018 | | P | |
|
|
|
ESC17-00774
| General Inspection | 11/23/2018 | 11/23/2018 | 11/27/2018 12:51:20 PM | | PASS |
|
|
Project complete and is in revegetation phase. No corrections requested
|
ESC18-00020
| General Inspection | 11/23/2018 | 11/23/2018 | 11/27/2018 12:50:42 PM | | FAIL |
|
|
Corrections needed:
- pick up windblown trash on hillsides and open areas around perimeter. Specific correction to Kyle regarding trash between Hootowl and Grebe , down the hill from the homes on the ridge - Install heavy duty construction entrance in phase 4 (top of hill) so stockpiling can still occur in this area w/o trackout. Request for either check dams or silt fence next construction entrance to prevent turbid runoff down Barber. Landon to notify ESC division of solution.
- fix wattles at the entrance to the subdivsion @ Barber & Harris Ranch Road where there is access to Penitentiary Canal and old mobile home site.
- repairs, earthwork, and monitoring off runoff still needs to occur in the Trapper runoff & rip rap zone that is in the gulch above the midway stormwater pond adjacent to the fire access road to Council Springs Creek. Syman Co. did install some wattle check dam sections just below the riprap to capture sediment and slow down runoff. Work in progress, discuss possible retention/sedimentation area just above this stormwater feature.
Follow up inspection scheduled for next week.
|
ESC18-00701
| Random Inspection | 11/23/2018 | 11/23/2018 | 11/23/2018 1:18:17 PM | P | FAIL |
|
|
Foundation poured. Permit posted, no trackout or discharges.. Road mix stabilized entrance for loading/parking installed.
No concrete washout provided for foundation work. Washout dumped on ground south of foundation.
Special investigation fee assessed and re-inspection after clean up required.
|
ESC17-01247
| Site Final | 11/23/2018 | 11/23/2018 | 11/23/2018 1:09:25 PM | P | PASS |
|
|
Home complete and landscaped. DI bag removed from storm drain. ESC permit finaled.
|
ESC17-01442
| Site Final | 11/23/2018 | 11/23/2018 | 11/23/2018 1:05:21 PM | P | PASS |
|
|
HOme complete. No loose materials or disturbed are observed. No temp BMP removal needed. ESC permit finaled.
|
ESC17-01745
| Aging Inspection | 11/23/2018 | 11/23/2018 | 11/23/2018 1:02:44 PM | | CANC |
|
|
|
ESC18-00015
| DOC - Permit Finaled | 11/23/2018 | 11/23/2018 | 11/23/2018 1:00:01 PM | P | PASS |
|
|
|
ESC18-00071
| General Inspection | 11/23/2018 | 11/23/2018 | 11/23/2018 12:55:14 PM | | PASS |
|
|
WIP. North Hill subdivision BMPs installed. Regular housekeeping occuring. No corrections requested.
|
ESC18-00006
| General Inspection | 11/23/2018 | 11/23/2018 | 11/23/2018 12:51:50 PM | | CANC |
|
|
|
ESC18-01163
| General Inspection | 11/23/2018 | 11/23/2018 | 11/23/2018 12:30:34 PM | P | PASS |
|
|
WIP on frame. Perimeter BMPs installed, site fenced off to prevent access and trackout. No corrections requested. No discharges, uncontained trash or trackout.
|
ESC16-01410
| General Inspection | 11/23/2018 | 11/23/2018 | 11/23/2018 12:27:42 PM | | CANC |
|
|
|
ESC16-00406
| Random Inspection | 11/23/2018 | 11/23/2018 | 11/23/2018 12:11:35 PM | P | FAIL |
|
|
Corrections needed:
- clean out and maintain DI bags on Sandpoint and Broadstone. Drain in front of lot 22, block 2 has had bag drop to bottom of sump. Other DI protection is full. - install controls to control erosion and sediment runoff from lot 9, block 2 to Sandpoint.
|
ESC17-01184
| Aging Inspection | 11/23/2018 | 11/23/2018 | 11/23/2018 12:00:17 PM | | CANC |
|
|
rescheduled for site final
|
ESC18-00024
| Aging Inspection | 11/23/2018 | 11/23/2018 | 11/23/2018 11:13:13 AM | | CANC |
|
|
rescheduled for site final
|
ESC16-01706
| General Inspection | 11/23/2018 | 11/23/2018 | 11/23/2018 10:11:50 AM | | PASS |
|
|
WIP on site improvements and interior work on warehouse. Parking lot paved, frontage sod and landscaping has been installed. Large stockpile onsite, may require stabilization if to remain on site. No corrections requested.
|
ESC17-00990
| Aging Inspection | 11/23/2018 | 11/23/2018 | 11/23/2018 8:29:10 AM | | CANC |
|
|
|
ESC17-01442
| Aging Inspection | 11/23/2018 | 11/23/2018 | 11/23/2018 8:28:42 AM | | CANC |
|
|
|
ESC13-00193
| General Inspection | 11/23/2018 | 11/23/2018 | 11/23/2018 8:25:23 AM | | CANC |
|
|
|
ESC17-01636
| DOC - Permit Finaled | 11/23/2018 | 11/23/2018 | 11/23/2018 8:18:54 AM | P | PASS |
|
|
see ESC17-00111
|
ESC17-01635
| DOC - Permit Finaled | 11/23/2018 | 11/23/2018 | 11/23/2018 8:18:24 AM | P | PASS |
|
|
see ESC17-00111
|