Inspections for the day of: Friday, November 23, 2018.
Number of inspections: 24
Percentage of inspections complete: 83 %
Percentage of inspections not complete: 17 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00791 General Inspection11/20/201811/20/2018   
ESC17-01289 General Inspection11/20/201811/20/2018   
ESC17-01749 General Inspection11/20/201811/20/2018   
ESC18-01252 Site Final11/16/201811/20/2018 P 
ESC17-00774 General Inspection11/23/201811/23/201811/27/2018 12:51:20 PM PASS
Project complete and is in revegetation phase. No corrections requested
ESC18-00020 General Inspection11/23/201811/23/201811/27/2018 12:50:42 PM FAIL
Corrections needed:

- pick up windblown trash on hillsides and open areas around perimeter. Specific correction to Kyle regarding trash between Hootowl and Grebe , down the hill from the homes on the ridge
- Install heavy duty construction entrance in phase 4 (top of hill) so stockpiling can still occur in this area w/o trackout. Request for either check dams or silt fence next construction entrance to prevent turbid runoff down Barber. Landon to notify ESC division of solution.

- fix wattles at the entrance to the subdivsion @ Barber & Harris Ranch Road where there is access to Penitentiary Canal and old mobile home site.

- repairs, earthwork, and monitoring off runoff still needs to occur in the Trapper runoff & rip rap zone that is in the gulch above the midway stormwater pond adjacent to the fire access road to Council Springs Creek. Syman Co. did install some wattle check dam sections just below the riprap to capture sediment and slow down runoff. Work in progress, discuss possible retention/sedimentation area just above this stormwater feature.

Follow up inspection scheduled for next week.
ESC18-00701 Random Inspection11/23/201811/23/201811/23/2018 1:18:17 PMPFAIL
Foundation poured. Permit posted, no trackout or discharges.. Road mix stabilized entrance for loading/parking installed.

No concrete washout provided for foundation work. Washout dumped on ground south of foundation.

Special investigation fee assessed and re-inspection after clean up required.
ESC17-01247 Site Final11/23/201811/23/201811/23/2018 1:09:25 PMPPASS
Home complete and landscaped. DI bag removed from storm drain. ESC permit finaled.
ESC17-01442 Site Final11/23/201811/23/201811/23/2018 1:05:21 PMPPASS
HOme complete. No loose materials or disturbed are observed. No temp BMP removal needed. ESC permit finaled.
ESC17-01745 Aging Inspection11/23/201811/23/201811/23/2018 1:02:44 PM CANC
ESC18-00015 DOC - Permit Finaled11/23/201811/23/201811/23/2018 1:00:01 PMPPASS
ESC18-00071 General Inspection11/23/201811/23/201811/23/2018 12:55:14 PM PASS
WIP. North Hill subdivision BMPs installed. Regular housekeeping occuring. No corrections requested.
ESC18-00006 General Inspection11/23/201811/23/201811/23/2018 12:51:50 PM CANC
ESC18-01163 General Inspection11/23/201811/23/201811/23/2018 12:30:34 PMPPASS
WIP on frame. Perimeter BMPs installed, site fenced off to prevent access and trackout. No corrections requested. No discharges, uncontained trash or trackout.
ESC16-01410 General Inspection11/23/201811/23/201811/23/2018 12:27:42 PM CANC
ESC16-00406 Random Inspection11/23/201811/23/201811/23/2018 12:11:35 PMPFAIL
Corrections needed:

- clean out and maintain DI bags on Sandpoint and Broadstone. Drain in front of lot 22, block 2 has had bag drop to bottom of sump. Other DI protection is full.
- install controls to control erosion and sediment runoff from lot 9, block 2 to Sandpoint.
ESC17-01184 Aging Inspection11/23/201811/23/201811/23/2018 12:00:17 PM CANC
rescheduled for site final
ESC18-00024 Aging Inspection11/23/201811/23/201811/23/2018 11:13:13 AM CANC
rescheduled for site final
ESC16-01706 General Inspection11/23/201811/23/201811/23/2018 10:11:50 AM PASS
WIP on site improvements and interior work on warehouse. Parking lot paved, frontage sod and landscaping has been installed. Large stockpile onsite, may require stabilization if to remain on site. No corrections requested.
ESC17-00990 Aging Inspection11/23/201811/23/201811/23/2018 8:29:10 AM CANC
ESC17-01442 Aging Inspection11/23/201811/23/201811/23/2018 8:28:42 AM CANC
ESC13-00193 General Inspection11/23/201811/23/201811/23/2018 8:25:23 AM CANC
ESC17-01636 DOC - Permit Finaled11/23/201811/23/201811/23/2018 8:18:54 AMPPASS
see ESC17-00111
ESC17-01635 DOC - Permit Finaled11/23/201811/23/201811/23/2018 8:18:24 AMPPASS
see ESC17-00111