Inspections for the day of: Monday, November 24, 2014.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-01083 General Inspection11/24/201411/24/201411/24/2014 4:45:29 PMPPASS
Wattles along power line trench are installed properly in between project area and the vegetative buffer of Walling Creek . WIP. No dewatering occuring. Approved.
ESC13-00684 General Inspection11/24/201411/24/201411/24/2014 4:43:15 PM PASS
WIP on individual parcels. No runoff from site. Snowmelt ponded on open parcels. No trackout to Warm Springs or discharges into the landscaped canal bed/decorative waterway (Penn Canal not currently flowing).

No corrections at this time.
ESC14-00206 Tracking Control11/24/201411/24/201411/24/2014 3:57:48 PMPPEND
Called RP and left VM to restrict access to work area at one designated entrance to cut down on trackout. Will continue to monitor
ESC13-00597 Aging Inspection11/24/201411/24/201411/24/2014 1:18:27 PM PASS
Staging trailers are still on site and interior work in progress. No exterior excavation or disturbance. No stormwater pollution sources observed at time of inspection. No corrections at this time. Should be getting close to completion.
ESC14-00289 General Inspection11/24/201411/24/201411/24/2014 12:02:32 PM PASS
WIP. No trackout to culdesdac. Site not yet landscaped/stabilized but vegetative barrier has been preserved. No corrections
ESC14-00284 General Inspection11/24/201411/24/201411/24/2014 11:53:49 AM PART
WIP. Vegetative buffer and perimeter wattle is installed around most of site.

Correction to sweep/shovel collected sediment in gutter on Draco has not yet been completed. JH RP has to hit this site in addition to Birdsong this week now that weather has cleared and ground/dirt is not frozen.
ESC14-00135 General Inspection11/24/201411/24/201411/24/2014 11:42:14 AM PART
Erosion issue on the homesite have been address and no active runoff or new rills/gullies have started.

Still need to sweep up collected sediment at Windsong and Birdsong and change the inlet protect ASAP.
ESC14-00984 Tracking Control11/24/201411/24/201411/24/2014 11:35:43 AMPFAIL
Construction entrance rock was brought to site but was not installed where contractors accessing lot. Tracked out dirt all the way down Old Hickory.

Need to sweep up at current entrance and collect large dirt clods. Main problem is that the official entrance to parcel off Barber Dr. has not been cut yet.

RP notified issue and needs to clean up before Wednesday.
ESC13-00755 General Inspection11/24/201411/24/201411/24/2014 11:26:47 AM PASS
Terraces perimeter was swept and cleaned this morning and is in good condition at the moment. No ongoing trackout occuring and silt fence is still installed and effective.

Considering the mud after recent snowmelt, site is in very good condition with no discharges or erosion issues observed.
ESC14-00144 Random Inspection11/24/201411/24/201411/24/2014 11:17:50 AMPPASS
No sediment runoff onto hard surfaces and streets in East Valley after the snow has melted. Perimter fiber compost rolls are installed and have trapped sediment. In addition, at low areas at settling trench and earthen berm has been installed. No trackout to Warm Springs, no dewatering occuring.

Approved, no corrections at this time. Phase 2 has not started yet.
ESC13-00552 BMP Violation11/24/201411/24/201411/24/2014 11:08:36 AMPFAIL
Developer of Sunnyridge needs to provide new washout and clean up existing one.

Work on phase 3 is tracking into Sunnyridge Phase 2 on Snow Bird street and needs sweeping this week.
ESC14-01062 Site Preparation11/24/201411/24/201411/24/2014 10:57:41 AMPPASS
Adam Phone #: ###-####

Permit posted. Excavator onsite. No structural BMPs due to flat lot and DI's have existing protection. RP is working on maintaining the concrete washout.
ESC14-01043 Site Preparation11/24/201411/24/201411/24/2014 10:56:37 AMPPART
Permit posted. Eaglewood Home in Sunny Ridge to start tomorrow.

Corrections required to stay in compliance:
Request new concrete washout facility for Sunny Ridge
Clean up windblown litter on lot and culdesac margins.
ESC14-00985 Random Inspection11/24/201411/24/201411/24/2014 10:28:03 AMPPART
No major trackout down street, permit posted, and trash is contained.

1 correction: Need to sweep and shovel mud/dirt in front of driveway and lot.
ESC14-00212 Random Inspection11/24/201411/24/201411/24/2014 9:48:21 AMAPEND
Dewatering for water line project is still in progress. End of pipe discharge looked very close to being over the limit for TSS so I had them divert the hose where activity is occuring to the settling pond.

Requested that discharge point be closely monitored and that turbity test results should be logged.

Will check back.
ESC13-01293 Aging Inspection11/24/201411/24/201411/24/2014 9:10:23 AM PASS
ESC12-01148 Aging Inspection11/24/201411/24/201411/24/2014 8:40:19 AM PASS
WIP. Home not yet complete. Needs landscaping/stabilization. No corrections.