Inspections for the day of: Monday, November 26, 2018.
Number of inspections: 17
Percentage of inspections complete: 76 %
Percentage of inspections not complete: 24 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00791 General Inspection11/20/201811/20/2018   
ESC17-01289 General Inspection11/20/201811/20/2018   
ESC17-01749 General Inspection11/20/201811/20/2018   
ESC18-01252 Site Final11/16/201811/20/2018 P 
ESC18-00701 BMP Violation11/23/201811/26/201811/30/2018 5:01:54 PMAPEND
ESC17-01414 General Inspection11/26/201811/26/201811/27/2018 1:01:31 PM FAIL
Corrections issued to BlackRock for their DHETH phases along Parkcenter Blvd.

- pick up trash in pasture and storm drain swales south of all townhome phases recently completed or in progress.
- install DI bag in alley in DHETH #7 east of Shadywood on north side of the blvd.
- concrete washout is failed and needs removal.
- new washout pit or above ground containment must be installed ASAP.

Corrections issued to Joey w/ Blackrock
ESC16-00406 Conference11/23/201811/26/201811/27/2018 12:36:12 PMADONE
call Clay to discuss erosion and sediment runoff on Lot 9 , block 2

Corrections requested:
- maintain all DI bags in Highlands Cove phase 1
- fix erosion and sediment runoff from lot 9, block 2. Divert water from running over slope through existing rills. Install slope wattles and/or perimeter wattle to contain sediment from running onto sidewalk and gutter.
ESC17-01763 General Inspection11/26/201811/26/201811/26/2018 4:32:26 PM CANC
ESC17-00838 Site Final11/26/201811/26/201811/26/2018 4:32:18 PMPPASS
ESC18-01506 Site Preparation11/26/201811/26/201811/26/2018 11:13:06 AMPPASS
Permit posted. Large capacity concrete washout staged on site prior to foundation. No trackout. Storm drain on Rim has sediment protection. Grassy strip maintained along irrigation ditch (dry), will reisnpect after backfill of foundation for perimeter controls.
ESC18-00804 Random Inspection11/26/201811/26/201811/26/2018 11:09:05 AMAPASS
WIP. Equipment staged within lot. No trackout. Disturbed area now has road mix prepped . Bethel road surface is above grade of parcel. No stormwater infrastructure on street.
ESC17-01293 General Inspection11/26/201811/26/201811/26/2018 11:06:08 AM PASS
Parking lot paved. Perimeter landscaping in progress been hydromulched. No trackout or discharges.
ESC16-00812 Aging Inspection11/26/201811/26/201811/26/2018 10:15:56 AM PASS
See ESC18-01017. New SFH now in progress under different permit.
ESC18-01017 General Inspection11/26/201811/26/201811/26/2018 10:15:20 AMPPART
WIP on frame. Old ESC permit for demo finaled.

No trackout of significant amount of sediment leaving site. Driveway is poured, limiting risk of trackout. Permit sign is posted. Trash picked up, but will need a container.

Corrrection:
- provide trash container.
- sweep gutter
- discuss storm drain sediment protection requirement.
ESC16-00812 DOC - Permit Finaled11/26/201811/26/201811/26/2018 10:12:45 AMPPASS
ESC17-00838 General Inspection11/26/201811/26/201811/26/2018 8:28:55 AM CANC
rescheduled for site final
ESC16-00290 Aging Inspection11/26/201811/26/201811/26/2018 8:15:46 AM CANC