ESC17-00470
| Conference | 11/21/2017 | 11/27/2017 | 11/29/2017 4:31:35 PM | A | PEND |
|
|
|
MIS17-00396
| ESC-Conference | 11/22/2017 | 11/27/2017 | 11/29/2017 3:45:16 PM | A | PEND |
|
|
call SC construction to figure out the deal with the dirt
|
ESC16-01354
| Tracking Control | 11/27/2017 | 11/27/2017 | 11/28/2017 2:44:40 PM | P | PASS |
|
|
Trackout has been cleaned up. New rock installed at entrance to Myrtle.
Crews installing grass and trees between sidewalk and curbing along Myrtle. Will need to have gutters swept upon completion.
Pioneer Path entrance work that was included on this permit is now stabilized. WIP on parking garage exterior and interior finishes..
|
ESC15-00729
| General Inspection | 11/27/2017 | 11/27/2017 | 11/28/2017 11:56:00 AM | P | PEND |
|
|
Trapper and upper section of HRN has significant sediment runoff from sites as noted in previous inspection 11/22.
Numerious SFHs do not have ESC permit signs.
Subdivision does not appear to have been swept.
|
ESC17-00995
| Conference | 11/27/2017 | 11/27/2017 | 11/28/2017 11:42:10 AM | A | PEND |
|
|
Neighbor says the contractor is digging right at the property line and her fence is now falling down
Notified homebuilder and neighbor they would need to discuss any fence repairs of damage caused by excavation.
Issued correction to clean and contain trash at site and clean up pile uncontained concrete washout.
|
ESC17-00023
| Site Final | 11/27/2017 | 11/27/2017 | 11/27/2017 4:25:36 PM | P | PASS |
|
|
|
ESC16-01453
| Site Final | 11/27/2017 | 11/27/2017 | 11/27/2017 4:25:26 PM | P | PASS |
|
|
HOme complete and landscaped. Brighton to remove remaining DI bags in RH#6
|
ESC14-00657
| Site Final | 11/27/2017 | 11/27/2017 | 11/27/2017 4:24:50 PM | P | NR |
|
|
Need to remove all temporary BMPs drop inlet protection sediment bags in River Heights #6.
All SFHs complete, all areas stabilized. Ready for ESC final once DI bags have been removed.
|
ESC15-00957
| General Inspection | 11/27/2017 | 11/27/2017 | 11/27/2017 4:23:38 PM | | CANC |
|
|
|
ESC16-01253
| General Inspection | 11/27/2017 | 11/27/2017 | 11/27/2017 4:22:52 PM | | PASS |
|
|
No trackout or sediment runoff to MIllet. No corrections requested. Site not yet landscaped.
|
ESC17-01215
| Site Preparation | 11/22/2017 | 11/27/2017 | 11/27/2017 3:02:54 PM | P | PASS |
|
|
Clint Phone #: ###-####
Permit sign posted. BMPs installed. RP for East Valley on site. Approved for construction.
|
ESC17-01305
| Site Preparation | 11/22/2017 | 11/27/2017 | 11/27/2017 3:02:41 PM | P | PASS |
|
|
Clint Phone #: ###-####
Permit sign posted. BMPs installed. RP for East Valley on site. Approved for construction.
|
ESC17-00104
| General Inspection | 11/24/2017 | 11/27/2017 | 11/27/2017 2:35:45 PM | P | PASS |
|
|
WIP on interior. No specific violations on this site in HRN. See main site permit for subdivision corrections, ESC15-00729
|
ESC15-00094
| General Inspection | 11/27/2017 | 11/27/2017 | 11/27/2017 1:55:33 PM | | PASS |
|
|
|
ESC17-00078
| General Inspection | 11/24/2017 | 11/27/2017 | 11/27/2017 12:43:29 PM | P | PASS |
|
|
No sediment runoff or trackout to Warm Springs from site. Construction entrance and equipment unloading area installed to prevent mud on road.
Site grading and drainage has onsite retention. Back hill has earth berms and rock check dams to slow runoff entering the rock lined drainage channel along hill. No wattles or stabilization of back hillside, will check with Syman Company to see if it is scheduled. No violations or corrections issued.
|
ESC17-00892
| General Inspection | 11/27/2017 | 11/27/2017 | 11/27/2017 12:38:31 PM | P | PASS |
|
|
No trackout or discharges. No hillside erosion or sediment runoff to Windsong or Echo. Trash and materials are contained. Approved.
|
ESC17-00793
| General Inspection | 11/27/2017 | 11/27/2017 | 11/27/2017 12:37:43 PM | P | PASS |
|
|
Perimeter sediment control wattles installed along Birdsong. Gravel bag check dams and sediment filter mat installed in downstream gutter and storm drain. No trackout, permit sign posted. WIP on foundation, site retaing walls installed.
|
ESC17-01114
| General Inspection | 11/24/2017 | 11/27/2017 | 11/27/2017 12:27:42 PM | A | PASS |
|
|
Permit sign provided to onsite supervisor Bill. Trackout to Walnut is cleaned daily per Bill. Once framing is complete, will stabilize area and restrict access.
|
ESC16-01278
| General Inspection | 11/27/2017 | 11/27/2017 | 11/27/2017 11:52:02 AM | A | PASS |
|
|
No activity. No SFHs yet. Grading and subdivision infrastructure installed. No permanent stabilization, however no sediment runoff or trackout from lots.
|
ESC17-00422
| Tracking Control | 11/27/2017 | 11/27/2017 | 11/27/2017 11:11:39 AM | P | PART |
|
|
New construction entrance is installed with lining underneath angular rock. Entrance is still compacted and will need regular maintenance during heavy traffic.
Still need to install inlet protection on SW corner of Vista and Canal as requested.
No work or construction occuring at time of inspection.
|
ESC16-01189
| General Inspection | 11/27/2017 | 11/27/2017 | 11/27/2017 10:55:43 AM | A | PASS |
|
|
Trash around site has been picked up, regular pick up and scrap collection is in progress. No trackout or discharges offsite. Interior is still not yet fully paved or landscaped.
Site is still on trash warning.
Need to pick up roof material wrappings along
|
ESC16-01606
| General Inspection | 11/27/2017 | 11/27/2017 | 11/27/2017 10:53:52 AM | | PASS |
|
|
Trash around site has been picked up, regular pick up and scrap collection is in progress. No trackout or discharges offsite. See also ESC16-01189 for inspections at Marina Apts. Site is still on trash warning.
Need to pick up roof material wrappings along
|
ESC16-01605
| General Inspection | 11/27/2017 | 11/27/2017 | 11/27/2017 10:53:37 AM | | PASS |
|
|
Trash around site has been picked up, regular pick up and scrap collection is in progress. No trackout or discharges offsite. See also ESC16-01189 for inspections at Marina Apts. Site is still on trash warning.
Need to pick up roof material wrappings along
|
ESC16-01601
| General Inspection | 11/27/2017 | 11/27/2017 | 11/27/2017 10:53:15 AM | | PASS |
|
|
Trash around site has been picked up, regular pick up and scrap collection is in progress. No trackout or discharges offsite. See also ESC16-01189 for inspections at Marina Apts. Site is still on trash warning.
Need to pick up roof material wrappings along Preece.
|
ESC17-00984
| General Inspection | 11/27/2017 | 11/27/2017 | 11/27/2017 10:18:01 AM | A | PASS |
|
|
|
ESC16-01006
| General Inspection | 11/27/2017 | 11/27/2017 | 11/27/2017 8:09:15 AM | | CANC |
|
|
|
ESC16-01354
| Tracking Control | 11/27/2017 | 11/27/2017 | 11/27/2017 8:08:49 AM | P | CANC |
|
|
|
MIS17-00397
| ESC-Conference | 11/22/2017 | 11/27/2017 | | P | |
|
|
|