Inspections for the day of: Tuesday, November 27, 2018.
Number of inspections: 12
Percentage of inspections complete: 67 %
Percentage of inspections not complete: 33 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00791 General Inspection11/20/201811/20/2018   
ESC17-01289 General Inspection11/20/201811/20/2018   
ESC17-01749 General Inspection11/20/201811/20/2018   
ESC18-01252 Site Final11/16/201811/20/2018 P 
ESC17-01772 General Inspection11/27/201811/27/201811/30/2018 2:58:03 PM CANC
ESC15-01210 General Inspection11/27/201811/27/201811/29/2018 2:18:42 PM PASS
ESC17-01157 General Inspection11/23/201811/27/201811/27/2018 1:17:06 PMPCANC
ESC17-01783 General Inspection11/27/201811/27/201811/27/2018 1:02:49 PM FAIL
Corrections issued to BlackRock for their DHETH phases along Parkcenter Blvd.

- pick up trash in pasture and storm drain swales south of all townhome phases recently completed or in progress.
- install DI bag in alley in DHETH #7 east of Shadywood on north side of the blvd.
- concrete washout is failed and needs removal.
- new washout pit or above ground containment must be installed ASAP.

Corrections issued to Joey w/ Blackrock
ESC18-01418 General Inspection11/27/201811/27/201811/27/2018 1:01:40 PMPFAIL
Corrections issued to BlackRock for their DHETH phases along Parkcenter Blvd.

- pick up trash in pasture and storm drain swales south of all townhome phases recently completed or in progress.
- install DI bag in alley in DHETH #7 east of Shadywood on north side of the blvd.
- concrete washout is failed and needs removal.
- new washout pit or above ground containment must be installed ASAP.

Corrections issued to Joey w/ Blackrock
ESC18-01089 Site Preparation11/26/201811/27/201811/27/2018 12:55:43 PMAPASS
9:15 AM pre-construction conference

Approved for construction. Utility and sewer trenching has now started by Schmidt Construction. Construction entrance to be installed at upper end of Foxgrove Street to prevent trackout. Material staged within work area so should not be too much in and out traffic. Trench will capture runoff during rain events, but will need to install check dams and other BMPs as they work their way through sub. Will follow next week to check on progress and temp. stabilization steps. Road and gutters will not be installed until Spring 2019
ESC18-00027 General Inspection11/27/201811/27/201811/27/2018 12:38:34 PM PASS
Work complete. Monitoring creek and runoff areas into Warm Springs. No violations observed.
ESC18-00498 Conference11/21/201811/27/201811/27/2018 12:37:16 PMPPEND
No corrections requested. Will monitor hillside BMPs and runoff flow patterns when rain or snow melt occurs.