MIS17-00397
| ESC-Conference | 11/22/2017 | 11/27/2017 | | P | |
|
|
|
ESC16-01706
| General Inspection | 11/28/2017 | 11/28/2017 | 11/28/2017 9:51:17 AM | | PASS |
|
|
WIP on tiling the canal. No water flowing currently. No trackout or discharges from site. Permit sign posted.
|
ESC15-01579
| General Inspection | 11/28/2017 | 11/28/2017 | 11/28/2017 8:10:36 AM | | PASS |
|
|
Building 3 is now complete with ESC permit finaled. Parking lot for Arboretum now paved and stormwater facilities connected. Concrete washout onsite for remaining work occuring on building 1 and 2. No trackout or discharges. Inspected 11/27 PM. 3 open ESC permits at Arboretum (site, bldg 1, bldg 2)
|
ESC16-00436
| Site Final | 11/28/2017 | 11/28/2017 | 11/28/2017 8:09:35 AM | A | PASS |
|
|
Building complete. Parking lot for Arboretum now paved and stormwater facilities connected. Concrete washout onsite for remaining work occuring on building 1 and 2. No trackout or discharges. Inspected 11/27 PM
|
ESC16-01607
| General Inspection | 11/28/2017 | 11/28/2017 | 11/28/2017 7:59:56 AM | | CANC |
|
|
see ESC16-01189 for inspection record
|
ESC16-00329
| General Inspection | 11/28/2017 | 11/28/2017 | 11/28/2017 7:58:33 AM | | CANC |
|
|
|