Inspections for the day of: Tuesday, November 29, 2016.
Number of inspections: 39
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01416 Site Preparation11/29/201611/29/201611/30/2016 3:52:08 PMPPASS
Joey Phone #: ###-####


Permit sign posted, surrounding storm drains have sediment bags installed, new lined concrete washout pit has been excavated on the block. Current projects in compliance. Trash contained, no trackout or discharge issues
ESC16-01415 Site Preparation11/29/201611/29/201611/30/2016 3:51:56 PMPPASS
Joey Phone #: ###-####


Permit sign posted, surrounding storm drains have sediment bags installed, new lined concrete washout pit has been excavated on the block. Current projects in compliance. Trash contained, no trackout or discharge issues
ESC16-01412 Site Preparation11/29/201611/29/201611/30/2016 3:51:41 PMPPASS
Joey Phone #: ###-####


Permit sign posted, surrounding storm drains have sediment bags installed, new lined concrete washout pit has been excavated on the block. Current projects in compliance. Trash contained, no trackout or discharge issues
ESC16-01417 Site Preparation11/29/201611/29/201611/30/2016 3:51:27 PMPPASS
Joey Phone #: ###-####

Permit sign posted, surrounding storm drains have sediment bags installed, new lined concrete washout pit has been excavated on the block. Current projects in compliance. Trash contained, no trackout or discharge issues
ESC16-01441 General Inspection11/23/201611/29/201611/30/2016 1:52:32 PMAPASS
check on lot and drainage issue at North Hill sub.

###-####

No ESC issues related to the SFH construction. Working on drainage issue with developer, Riverside Homes, neighbor, and ACHD
ESC15-01420 General Inspection11/29/201611/29/201611/30/2016 1:08:03 PMPPEND
Subdivision work complete. Investigation of drainage issue on west end of project in progress. ACHD has storm drain ROW there.

Correction to development. Install sediment protection in front of inlet to surface drainage pipe. Install wattles at toe of slope on property line.
ESC15-00762 General Inspection11/29/201611/29/201611/29/2016 2:26:05 PM PASS
Vertical construction in progress. Site perimeter has been swept, some minor dirt and gravel accumulation remain. No discharges or spills, trash and materials are contained. No corrections requested.
ESC16-00397 Aging Inspection11/29/201611/29/201611/29/2016 2:16:45 PM CANC
ESC16-00178 General Inspection11/29/201611/29/201611/29/2016 2:16:04 PM CANC
ESC15-00817 General Inspection11/29/201611/29/201611/29/2016 2:12:54 PM CANC
ESC16-01400 Site Final11/29/201611/29/201611/29/2016 2:11:08 PMPPASS
Jason Phone #: ###-####

No ESC corrections needed at site. Garage structure is built and disturbed area stabilzed.. Ok to remove sign when BLD finaled.
ESC15-01184 General Inspection11/29/201611/29/201611/29/2016 1:37:23 PM PASS
WIP. Construction entrances are installed and in good condition. No trackout to streets, no discharges occuring. MS4 inlets have filter bag protection
ESC16-00315 Aging Inspection11/29/201611/29/201611/29/2016 12:32:35 PM PASS
Project near completion. Front yard and alley access stabilized. No temp BMPs remaining onsite. No further ESC corrections or inspections required. BLD is open.
ESC16-00315 DOC - Permit Finaled11/29/201611/29/201611/29/2016 12:31:49 PMPPASS
ESC16-00659 General Inspection11/29/201611/29/201611/29/2016 12:23:51 PM CANC
rescheduled
ESC16-00145 Aging Inspection11/29/201611/29/201611/29/2016 12:06:15 PM CANC
ESC16-00958 General Inspection11/29/201611/29/201611/29/2016 12:03:32 PMPPASS
WIP. Frame and driveway are complete. Trash and materials contained onsite. Site is in compliance.
ESC16-00841 General Inspection11/29/201611/29/201611/29/2016 12:02:40 PMPPASS
WIP. Permit sign posted. Driveway, no trackout from site perimeter on Woodcross. Wattle installed at bottom of site in good condition. No corrections requested.
ESC16-01253 Site Preparation11/28/201611/29/201611/29/2016 11:59:55 AMAPASS
James Phone #: ###-####

Onsite inspection conducted. BMPs installed include permit sign, ESC plan box, sediment control wattles staked and trenched at bottom of slope above existing vegetative swales. Will install construction entrance and/or use existing paved access to the east (per permission of lot owner). Preservation of existing vegetation at bottom of slope to act as buffer for swales.

Approved for construction.
ESC16-00430 General Inspection11/29/201611/29/201611/29/2016 11:56:13 AM PASS
ESC15-00547 General Inspection11/29/201611/29/201611/29/2016 11:55:56 AMPPASS
Gatehouse subdivision near completion. Site is now landscaped and parking lot has had initial cleaning. RP onsite stated another sweeping and final BMP (DI filter mats on Ustick) removal remain. All other Gatehouse ESC permits finaled.
ESC16-00310 DOC - Permit Finaled11/29/201611/29/201611/29/2016 11:31:53 AMPPASS
Gatehouse apartment building near completion. Site landscaped and cleaned. Some minor work on interiors. All vertical construction ESC permits closed, main subdivision site permit open, see ESC15-00547
ESC16-00311 DOC - Permit Finaled11/29/201611/29/201611/29/2016 11:26:18 AMPPASS
ESC16-00312 DOC - Permit Finaled11/29/201611/29/201611/29/2016 11:20:38 AMPPASS
ESC16-00522 General Inspection11/22/201611/29/201611/29/2016 11:13:16 AMPPASS
WIP. No trackout or discharges. Onsite stormwater management now installed. No corrections requested.
ESC16-01108 General Inspection11/29/201611/29/201611/29/2016 10:56:03 AMPPART
Subdivision roads and utilities now complete and parcels preped for SFHs by Hayden HOmes. Permit and SWPPP info posted. No significant trackout, uncontained trash or spills observed. No activity at time of inspection

Corrections:
- install DI bags on all new storm drains. Will notifiy Hayden Homes for SFH requirements
- needed new concrete washout.
ESC16-01088 Random Inspection11/29/201611/29/201611/29/2016 10:49:43 AMPPASS
WIP. Foundation complete,buildig frame ereccted. No trackout, discharges or dust issues.
ESC16-00722 Conference11/29/201611/29/201611/29/2016 10:48:24 AMPPASS
WIP on storage building foundations and site paving. Perimeter curbing complete. NO trackout or discharges observed. Onsite DI has sediment bag installed. Permit posted.
ESC16-00865 General Inspection11/9/201611/29/201611/29/2016 10:46:24 AMAPASS
WIP. Perimeter watttles installed around site properly. No trackout to Cloverdale or Executive. MS4 inlets protected. No corrections needed.
ESC15-01358 DOC - Permit Finaled11/29/201611/29/201611/29/2016 10:31:11 AMPPASS
Front yard earth disturbance stabilized/contained and exterior of new garage is complete. No further ESC inspections. BLD still open
ESC16-00653 General Inspection11/29/201611/29/201611/29/2016 10:28:17 AM PASS
ESC16-00568 General Inspection11/29/201611/29/201611/29/2016 10:10:54 AM PASS
Exterior work and earth disturbance phase of addition complete. Yard is stabilized, no trackout or sediment runoff, no excess stockpiles or materials observed. ESC condtions satisfied.
ESC16-00568 DOC - Permit Finaled11/29/201611/29/201611/29/2016 10:06:35 AMPPASS
ESC16-00401 Aging Inspection11/29/201611/29/201611/29/2016 10:03:11 AM DONE
No construction activity observed at site. No equipment or material staging. No activity on BLD permit since March 2016. Closed ESC permit due to 6 months + of no activity.
ESC16-00401 DOC - Permit Finaled11/29/201611/29/201611/29/2016 10:01:51 AMPPASS
ESC15-00509 General Inspection11/29/201611/29/201611/29/2016 9:46:48 AM CANC
ESC16-00494 Aging Inspection11/29/201611/29/201611/29/2016 9:18:50 AM PASS
Work complete, BLD finaled and yard landscaped/stabilized. ESC conditions satisfied.
ESC16-00494 DOC - Permit Finaled11/29/201611/29/201611/29/2016 9:18:24 AMPPASS
ESC16-01471 Site Preparation11/28/201611/29/201611/29/2016 8:45:57 AMAPASS
Yellow card is posted. Planning on digging Wednesday morning.
Thanks Phone #: ###-#### Inspection requested via web by Braxton Hansen