Inspections for the day of: Wednesday, November 29, 2017.
Number of inspections: 20
Percentage of inspections complete: 95 %
Percentage of inspections not complete: 5 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS17-00397 ESC-Conference11/22/201711/27/2017 P 
ESC17-00253 General Inspection11/29/201711/29/201711/29/2017 3:46:01 PM CANC
ESC17-00254 General Inspection11/29/201711/29/201711/29/2017 3:45:32 PM CANC
ESC17-00252 General Inspection11/29/201711/29/201711/29/2017 3:45:26 PM CANC
ESC17-00347 General Inspection11/29/201711/29/201711/29/2017 3:44:51 PMPDONE
Project now covered under ESC17-01545 with new operator ESI
ESC17-00347 DOC - Permit Finaled11/29/201711/29/201711/29/2017 3:43:57 PMPPASS
ESC17-00891 General Inspection11/29/201711/29/201711/29/2017 3:43:32 PMPPASS
WIP on connecting underground utilities to site. No trackout or discharges.
ESC17-00771 Partial Stop Work Order11/28/201711/29/201711/29/2017 12:45:42 PMADONE
Chris Laraway is NOT the Responsible Person for this Project. STOP any site activities under this ESC Project Number. This was called in to Boise City prior to cease and desist as my responsibility. Phone #: ###-#### Inspection requested via web by Chris Laraway
ESC04-01580 DOC - Permit Finaled11/29/201711/29/201711/29/2017 12:44:10 PMPPASS
ESC03-01148 DOC - Permit Finaled11/29/201711/29/201711/29/2017 12:44:04 PMPPASS
ESC03-01138 DOC - Permit Finaled11/29/201711/29/201711/29/2017 12:43:58 PMPPASS
ESC16-01568 Aging Inspection11/29/201711/29/201711/29/2017 11:43:30 AM PASS
ESC16-01568 DOC - Permit Finaled11/29/201711/29/201711/29/2017 11:43:25 AMPPASS
ESC16-01743 General Inspection11/29/201711/29/201711/29/2017 10:18:43 AM PASS
Preparing to pave driveway. No trackout observed. Should be done before end of year.
ESC17-01085 Site Final11/29/201711/29/201711/29/2017 9:25:07 AMAPASS
Demolition phase complete, vertical construction in progress. Project covered under ESC17-00891
ESC17-01085 General Inspection11/29/201711/29/201711/29/2017 9:23:53 AMPCANC
ESC17-00891 Site Final11/29/201711/29/201711/29/2017 9:23:25 AMPCANC
ESC17-00208 General Inspection11/29/201711/29/201711/29/2017 9:00:41 AM PASS
Home complete/BLD finaled. Temporary BMps for East Valley subdivision to remain onsite. No ESC corrections.
ESC17-00208 DOC - Permit Finaled11/29/201711/29/201711/29/2017 8:59:44 AMPPASS
ESC15-01288 General Inspection11/29/201711/29/201711/29/2017 8:59:33 AM PASS
WIP on SFHs by Brighton Homes and Alturas construction. Full washout contained observed 11/27 has been replaced. No trackout from sub to Warm Springs. Storm drains have sediment protection.