Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-00300 General Inspection11/1/201911/4/201911/6/2019 3:50:13 PMAPASS
check on spill clean up

Spill has been cleaned up, no dried residue in gutter on Pond. No new spills or uncontained washing/rinsing observed.
ESC18-01017 Aging Inspection11/4/201911/4/201911/4/2019 4:42:31 PM PASS
Landscaping installed, driveway installed. BLD open. No temp. BMPs. ESC permit finaled.
ESC18-01017 DOC - Permit Finaled11/4/201911/4/201911/4/2019 4:42:21 PMPPASS
ESC18-00134 Site Final11/4/201911/4/201911/4/2019 4:04:57 PMPPASS
Construction complete. Yard being landscaped by homeowner. No material leaving site. NO further ESC inspections required, ESC permit finaled.
ESC18-00513 Aging Inspection11/4/201911/4/201911/4/2019 3:32:37 PM PASS
ESC19-01232 General Inspection11/4/201911/4/201911/4/2019 3:20:01 PMPPART
No issues on site. Observed Sunroc using full washouts without reporting it to the onsite RP, who had told them to alert him when additional washout are needed.

RP set up new washout. Will have spilled washout cleaned up
ESC16-00406 Conference10/31/201911/4/201911/4/2019 2:57:12 PMADONE
4:30 PM with Gerald ###-####]

Meet with future builder Clarity Dwellings to review ESC regualtions and BMPs that will be needed on his two lots in Highlands Cove phase 1
ESC18-01620 General Inspection11/4/201911/4/201911/4/2019 2:56:12 PM PASS
Near completion. Need to make sure adjacent lot where staging was conducted is clean and free of debris or tire ruts which could cause erosion issues.
ESC18-00134 Aging Inspection11/4/201911/4/201911/4/2019 11:14:38 AM CANC
ESC19-01191 Conference11/4/201911/4/201911/4/2019 10:55:55 AMPPASS
RP Brandon called to notify that site is starting to mobilize. The first operation is to compete a
parking area for Delta Dental employees.

ESC site preparation inspection will occur Thursday once initial BMPs are installed.
ESC18-00749 Aging Inspection11/4/201911/4/201911/4/2019 8:14:32 AM CANC
rescheduled for site final
ESC18-01767 General Inspection11/4/201911/4/201911/4/2019 8:13:30 AM CANC