PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, November 5, 2019
.
Number of inspections:
12
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC18-01772
General Inspection
11/5/2019
11/5/2019
11/6/2019 3:49:02 PM
PASS
ESC18-01283
General Inspection
11/5/2019
11/5/2019
11/6/2019 3:48:50 PM
PASS
No trackout, discharges or other violations observed. WIP on vertical
ESC19-01269
General Inspection
10/16/2019
11/5/2019
11/6/2019 2:04:05 PM
P
PASS
ESC19-01158
General Inspection
11/5/2019
11/5/2019
11/6/2019 8:35:17 AM
P
FAIL
No concrete washout pan or lined pit set up for concrete work as requested and warned about. Fine and parcel hold issued on ESC19-01166. Follow up Friday
ESC19-00994
General Inspection
11/5/2019
11/5/2019
11/5/2019 4:01:49 PM
P
FAIL
Corrections needed:
- install additional riprap for the piped outlet west of Bogus Basin Road
- check for correct wattle installation
ESC17-00190
General Inspection
11/5/2019
11/5/2019
11/5/2019 4:00:14 PM
P
FAIL
Inspection 11/4
Need to install additional stormwater controls at top of culdesac to handle increased runoff from the grazed area above the culdesac. We had erosion here last year and there is risk of further erosion this year due to the near bare conditions.
Notified RP Scott, he will install additional wattles and assess the area.
ESC18-00863
DOC - Permit Finaled
11/5/2019
11/5/2019
11/5/2019 3:56:18 PM
P
PASS
ESC19-00995
Complaint Inspection
11/5/2019
11/5/2019
11/5/2019 3:37:06 PM
P
PART
notified of a turbid discharge spotted in this area during an aerial/LIDAR survey of the Boise River
Potential that crew cleared a debris dam in the drainage canal that runs through the south side of the site and caused some turbidity. Removal of this dam seem to have increased the flow of the water which may also be stirring up silt/mud on the canal bed.
There is also beaver activity and maintenance of the canal culvert (due to clogging from beaver cuttings/mud dams) that may cause brief turbidity and upstream in DD3 drainage through Ann Morrison that could have been a potential source.
Turbidity samples: outlet to Boise River in Garden City (Crab Shack)) = 14 NTU around 1:30. Plume was visible at 1 PM
- Site discharge monitoring location in canal 27 NTU
Upstream in canal between debris clearing (west of the rookery shelter) 28 NTU
- midway debris dam in drainage canal just past the cleared area 62 NTU
- downstream side of culvert for outlet of first drainage channel pond area 10.4 NTU (*this is where there is beaver activity)
- pond inlet culvert from Ann Morrison 9.55 NTU
No readings over 50 NTU incidental limit to the Boise River, but if there is any channel work or activity in water, turbidity monitoring and observation of plumes should occur.
Correction request: During work on piers for future viewing decks, suggested a coffer dam or diversion of flowing water in canal and have turbidimeter onsite at time of work in case of any visible plumes. This event should be noted in the SWPPP, potentially in the Corrective Actions to have a protocol for any in-channel work.
ESC18-01089
General Inspection
11/5/2019
11/5/2019
11/5/2019 11:06:04 AM
CANC
ESC18-01266
Aging Inspection
11/5/2019
11/5/2019
11/5/2019 11:01:35 AM
PASS
ESC18-01266
Site Final
11/5/2019
11/5/2019
11/5/2019 11:01:22 AM
P
PASS
Home landscaped, no disturbed area or loose materials. No temp. BMPs left on site or receiving storm drain.
ESC18-01022
Conference
10/30/2019
11/5/2019
11/5/2019 7:46:12 AM
P
CANC
1:30 PM lower entrance
winterization
rescheduled to 11/19 to check on site after road and sidewalks are installed.