Inspections for the day of: Monday, November 6, 2017.
Number of inspections: 27
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-01414 Tracking Control11/6/201711/6/201711/6/2017 8:38:06 PMPCANC
ESC17-00203 Complaint Inspection11/6/201711/6/201711/6/2017 3:48:08 PMPFAIL
report of muddy trackout and lack of ESC controls around

Signicant tractkout due to muddy shoulder area. Parking area and south access drive are getting prepped for asphalt.

Correction request to sweep street before end of day 11/7.

Superintendent with Reudebuesch stated that roads will be swept today and tomorrow. GC said a loading truck drove through mud this morning.

Will follow up to address stabilization of muddy areas or controls to prevent.
ESC15-01258 Aging Inspection11/6/201711/6/201711/6/2017 3:23:03 PM CANC
rescheduled for site final
ESC17-00587 Site Final11/6/201711/6/201711/6/2017 2:29:03 PMPPASS
Demo/duplex move is complete. No sediment leaving site. No ESC requests. Parcel being used to stage lighposts for the St. Luke's road work.
ESC17-00922 Site Final11/6/201711/6/201711/6/2017 2:23:26 PMPPASS
Pool complete. Addition at home covered seperately, see ESC17-01496. ESC permit finaled.
ESC15-01569 Site Final11/6/201711/6/201711/6/2017 2:21:49 PMPNR
No exterior disturbance or work occuring(This activity was added in error so we have changed the case status back to Issued.)

Backyard not stabilized/landscaped. BLD still open.
ESC16-00751 Site Final11/6/201711/6/201711/6/2017 2:16:00 PMPPASS
Project complete, stabilized and construction materials cleaned.
ESC17-00101 Site Final11/6/201711/6/201711/6/2017 2:10:54 PMPPASS
Home complete, landscaped, and occupied. No ESC issues.
ESC17-00083 Site Final11/6/201711/6/201711/6/2017 2:10:31 PMPPASS
Demo complete and new home now on parcel also complete. NO corrections.
ESC17-00538 Site Final11/6/201711/6/201711/6/2017 2:09:52 PMPPASS
No disturbed area or loose materials at site. Project appears to be complete. BLD is open with no recent activity.
ESC17-00246 Random Inspection11/6/201711/6/201711/6/2017 1:53:37 PMPPASS
WIP on frame and interior. Street and sidewalk are clean, trash container in good condition. Approved.
ESC17-01335 Random Inspection11/6/201711/6/201711/6/2017 1:53:02 PMPPASS
Project not yet started. No issues at site.
ESC16-00256 Aging Inspection11/6/201711/6/201711/6/2017 12:18:20 PM CANC
permit expired; no ESC issues. BLD open.
ESC16-00256 DOC - Permit Finaled11/6/201711/6/201711/6/2017 12:17:41 PMPPASS
ESC16-00257 Aging Inspection11/6/201711/6/201711/6/2017 12:01:07 PM PASS
All permits finaled. No ESC corrections needed.
ESC16-00257 DOC - Permit Finaled11/6/201711/6/201711/6/2017 12:00:21 PMPPASS
ESC17-00302 General Inspection11/6/201711/6/201711/6/2017 11:56:53 AMAPART
post rainfall inspection

BMPs installed on perimeter and slope contained sediment onsite, however there is some mud in gutter from parking and trackout that needs clean up this week.

New wattle installation on west side of foundation on slope is properly installed. No significant trackout or loose trash.

Need to provide trash box and clean gutters.
ESC16-00724 Aging Inspection11/6/201711/6/201711/6/2017 11:39:45 AM CANC
rescheduled for site final
ESC17-01366 Site Preparation11/2/201711/6/201711/6/2017 11:38:41 AMAPASS
Grant Phone #: ###-####

Approved for construction. Legacy to provide own washout containment per ESC permit conditions. Subdivision storm drains already fitted with DI bags.
ESC16-01581 General Inspection11/6/201711/6/201711/6/2017 11:12:09 AM PASS
Detached garage & loft building complete. Some remaining work in alley and around exterior. Permit posted. BLD open.
ESC16-01354 Tracking Control11/6/201711/6/201711/6/2017 10:56:33 AMAFAIL
Trackout to Myrtle, construction entrance/exit muddy with in site.

Verbal correction requests to Okland RP:
- sweep north lane of Myrtle to 11th street
- repair construction entrance and clean up mud on apron.

Concrete washout has been removed, shell of parking structure is complete. WIP to prep site for further development @ Pioneer Crossing.

RP stated sweeper has been scheduled. Crew working on new construction entrance.
ESC17-01235 General Inspection11/6/201711/6/201711/6/2017 10:44:51 AMAPART
WIP on demolition. Building has been removed, preparing for repaving of parking area at Uhaul. Site perimeter curbing retains stormwater onsite. Some minor trackout to Orchard. Sweeper onsite at time of inspection.
ESC16-01580 General Inspection11/6/201711/6/201711/6/2017 10:37:22 AMAPASS
Buidling complete, parking lot and landscaping installed. Staging area still in use and may require additional stabilization. No violations observed. DI protection installed for both active project in Emerald Station medical complex.
ESC16-01744 General Inspection11/6/201711/6/201711/6/2017 10:31:05 AM PASS
Ramp and site improvements complete. Site clean and stabilized.
ESC16-01744 DOC - Permit Finaled11/6/201711/6/201711/6/2017 10:30:34 AMPPASS
ESC17-01134 General Inspection11/3/201711/6/201711/6/2017 10:30:22 AMAPEND
post SWO sticker

Mike with Syringa called to respond to corrections and SWO.

Will pay fine and work on clean up today. Will reinspect to verify compliance. RP stated they had paid the concrete company extra fee to washout offsite.
ESC15-01521 Aging Inspection11/6/201711/6/201711/6/2017 9:36:55 AM PASS