ESC13-00524
| Tracking Control | 11/8/2013 | 11/8/2013 | 11/8/2013 2:44:53 PM | P | PASS |
|
|
Construction entrance was replenished as requested. Finishing work on stormwater infrastructure connection to downstream pond with active construction in the right of way. No further corrections.
|
ESC13-00835
| General Inspection | 11/8/2013 | 11/8/2013 | 11/8/2013 2:10:40 PM | | FAIL |
|
|
Corrections:
1. Clean up cement washout and use washout as described in site ESCP
2. Sweep street and surrounding gutters
3. Empty/replace existing DI filter bag
4. Repair down hill silt fences
Written correction notice left on site.
|
ESC13-00806
| General Inspection | 11/8/2013 | 11/8/2013 | 11/8/2013 1:34:29 PM | | PASS |
|
|
Stockpiles and area of disturbance surrounded by silt fence. No track out; construction entrance. Permits are posted.
|
ESC13-00594
| Random Inspection | 11/8/2013 | 11/8/2013 | 11/8/2013 1:25:15 PM | P | PASS |
|
|
BMPs implemented. No track out to surrounding streets. Parking lot is about to be paved. Site looks good.
|
ESC13-00834
| General Inspection | 11/8/2013 | 11/8/2013 | 11/8/2013 11:54:09 AM | | PASS |
|
|
Zeppellin and Harvard streets have been completed. No activity at time of inspection. Site has not yet acheived stabilization along sides of roads. No corrections required
|
ESC13-00552
| Complaint Inspection | 11/8/2013 | 11/8/2013 | 11/8/2013 11:21:31 AM | P | PART |
|
|
Boise ESC Permit posted. Some of the new roads have been laid; subdivision plats are in process of being graded. Cound not find SWPPP on site; some minor areas of track out. No track out to Colombia street. Neighborhood stormwater DIs have filter bags installed.
Corrections:
Keep SWPPP on site Sweep roads once grading is finished
|
ESC13-00336
| Aging Inspection | 11/8/2013 | 11/8/2013 | 11/8/2013 10:27:26 AM | | PASS |
|
|
Finaled.
|
ESC13-00336
| DOC - Permit Finaled | 11/8/2013 | 11/8/2013 | 11/8/2013 10:27:00 AM | P | PASS |
|
|
House is complete, stabilized and landscaped. No further ESC inspections required.
|
ESC13-00368
| Aging Inspection | 11/8/2013 | 11/8/2013 | 11/8/2013 10:16:48 AM | | PASS |
|
|
Finaled. See activitiy notes.
|
ESC13-00368
| DOC - Permit Finaled | 11/8/2013 | 11/8/2013 | 11/8/2013 10:16:27 AM | P | PASS |
|
|
House is complete, landscaped, and permits finaled. ESC conditions have been met.
|
ESC13-00475
| General Inspection | 11/8/2013 | 11/8/2013 | 11/8/2013 9:58:11 AM | | PASS |
|
|
Permit posted. No trackout or materials on street or sidewalks. Windsong DI's have filter bags. Rear of site has vegetative buffer and gator guard wattles.
|
ESC13-00981
| Site Preparation | 11/7/2013 | 11/8/2013 | 11/8/2013 9:44:32 AM | A | PASS |
|
|
Clint Phone #: ###-####
Site is ready for construction. Subdivision BMPs including silt fence, wattles, and concrete washout provided. Permit is posted. Approved.
|
ESC12-00845
| General Inspection | 11/8/2013 | 11/8/2013 | 11/8/2013 9:16:07 AM | | PASS |
|
|
Final landscaping in progress. No corrections at this time.
|
ESC13-00747
| Tracking Control | 11/6/2013 | 11/8/2013 | 11/8/2013 8:57:51 AM | A | PASS |
|
|
Constructrion entrance has been improved as requested and road was swept. Site is in compliance.
|
ESC13-00747
| Complaint Inspection | 11/7/2013 | 11/8/2013 | 11/8/2013 8:16:04 AM | A | CANC |
|
|
duplicate entry
|