Inspections for the day of: Friday, November 8, 2013.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00524 Tracking Control11/8/201311/8/201311/8/2013 2:44:53 PMPPASS
Construction entrance was replenished as requested. Finishing work on stormwater infrastructure connection to downstream pond with active construction in the right of way. No further corrections.
ESC13-00835 General Inspection11/8/201311/8/201311/8/2013 2:10:40 PM FAIL
Corrections:

1. Clean up cement washout and use washout as described in site ESCP

2. Sweep street and surrounding gutters

3. Empty/replace existing DI filter bag

4. Repair down hill silt fences

Written correction notice left on site.
ESC13-00806 General Inspection11/8/201311/8/201311/8/2013 1:34:29 PM PASS
Stockpiles and area of disturbance surrounded by silt fence. No track out; construction entrance. Permits are posted.
ESC13-00594 Random Inspection11/8/201311/8/201311/8/2013 1:25:15 PMPPASS
BMPs implemented. No track out to surrounding streets. Parking lot is about to be paved. Site looks good.
ESC13-00834 General Inspection11/8/201311/8/201311/8/2013 11:54:09 AM PASS
Zeppellin and Harvard streets have been completed. No activity at time of inspection. Site has not yet acheived stabilization along sides of roads. No corrections required
ESC13-00552 Complaint Inspection11/8/201311/8/201311/8/2013 11:21:31 AMPPART
Boise ESC Permit posted. Some of the new roads have been laid; subdivision plats are in process of being graded. Cound not find SWPPP on site; some minor areas of track out. No track out to Colombia street. Neighborhood stormwater DIs have filter bags installed.

Corrections:

Keep SWPPP on site
Sweep roads once grading is finished
ESC13-00336 Aging Inspection11/8/201311/8/201311/8/2013 10:27:26 AM PASS
Finaled.
ESC13-00336 DOC - Permit Finaled11/8/201311/8/201311/8/2013 10:27:00 AMPPASS
House is complete, stabilized and landscaped. No further ESC inspections required.
ESC13-00368 Aging Inspection11/8/201311/8/201311/8/2013 10:16:48 AM PASS
Finaled. See activitiy notes.
ESC13-00368 DOC - Permit Finaled11/8/201311/8/201311/8/2013 10:16:27 AMPPASS
House is complete, landscaped, and permits finaled. ESC conditions have been met.
ESC13-00475 General Inspection11/8/201311/8/201311/8/2013 9:58:11 AM PASS
Permit posted. No trackout or materials on street or sidewalks. Windsong DI's have filter bags. Rear of site has vegetative buffer and gator guard wattles.
ESC13-00981 Site Preparation11/7/201311/8/201311/8/2013 9:44:32 AMAPASS
Clint Phone #: ###-####

Site is ready for construction. Subdivision BMPs including silt fence, wattles, and concrete washout provided. Permit is posted. Approved.
ESC12-00845 General Inspection11/8/201311/8/201311/8/2013 9:16:07 AM PASS
Final landscaping in progress. No corrections at this time.
ESC13-00747 Tracking Control11/6/201311/8/201311/8/2013 8:57:51 AMAPASS
Constructrion entrance has been improved as requested and road was swept. Site is in compliance.
ESC13-00747 Complaint Inspection11/7/201311/8/201311/8/2013 8:16:04 AMACANC
duplicate entry