Inspections for the day of: Tuesday, November 8, 2016.
Number of inspections: 26
Percentage of inspections complete: 96 %
Percentage of inspections not complete: 4 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-01343 Site Final11/1/201611/4/2016 P 
ESC15-01138 General Inspection11/4/201611/8/201611/15/2016 7:46:22 AMPCANC
ESC16-00276 General Inspection11/8/201611/8/201611/10/2016 1:34:25 PM CANC
ESC16-00242 General Inspection11/8/201611/8/201611/10/2016 1:34:15 PM CANC
ESC14-01063 General Inspection11/8/201611/8/201611/9/2016 2:22:43 PM PASS
No new subdivision activity or SFHs in progress. DI sediment bags recently maintained and reinstalled. No sediment runoff issues or hillside erosion rills observed. Concrete washout for EC #7 homes is in compliance with lined pit.
ESC16-00343 General Inspection11/8/201611/8/201611/9/2016 2:00:30 PM PEND
Hillside revegetation, grass not yet fully established. Home id occupied. Some minor erosion on uphill sideyard due to runoff from the vacant lot above home is still occuring. Lot is not owned by builder (Canyon Crest)
ESC15-01526 Aging Inspection11/8/201611/8/201611/9/2016 9:02:50 AM PASS
Construction complete and home now occupied. No ESC corrections required. All permits finaled.
ESC15-01552 Site Final11/8/201611/8/201611/9/2016 7:50:48 AMPNR
BLD permit for shell finaled. Some interior work remaining
ESC15-01588 Aging Inspection11/8/201611/8/201611/8/2016 3:58:20 PM CANC
ESC15-01532 General Inspection11/8/201611/8/201611/8/2016 3:52:37 PM PEND
ESC15-01204 Aging Inspection11/8/201611/8/201611/8/2016 3:52:29 PM CANC
rescheduled for site final
ESC15-00306 General Inspection11/8/201611/8/201611/8/2016 3:51:57 PM CANC
ESC15-01537 Aging Inspection11/8/201611/8/201611/8/2016 3:51:48 PM PASS
ESC15-01537 DOC - Permit Finaled11/8/201611/8/201611/8/2016 3:51:41 PMPPASS
ESC15-00688 General Inspection11/8/201611/8/201611/8/2016 1:29:26 PM PASS
Onsite storm drains have now had the filled silt filter sacks removed to properly handle stormwater runoff. Construction materials have been cleaned, no loose dirt or materials onsite.

ESC final correction requests and conditions have been satisfied. ESC permit for Falling Brook is now closed.
ESC16-00329 General Inspection11/8/201611/8/201611/8/2016 1:18:36 PM PASS
homeowner lansdcaping project and site improvements in progress. Permit sign posted, no trackout or other issues. No corrections needed
ESC16-00237 Site Final11/2/201611/8/201611/8/2016 12:47:52 PMAPASS
Blvd. townhome complete and landscaped. DI bags in area to be removed as blocks completed. BLD finaled, no ESC corrections needed. Active projects in compliance.
ESC16-00238 Site Final11/2/201611/8/201611/8/2016 12:47:29 PMAPASS
Blvd. townhome complete and landscaped. DI bags in area to be removed as blocks completed. BLD finaled, no ESC corrections needed. Active projects in compliance.
ESC16-01197 Site Preparation11/7/201611/8/201611/8/2016 12:23:27 PMAPASS
Austin Phone #: ###-####


First 3 units in Harris North, all 3 parcels adjacent. Portable concrete washout facility with regular servicing to be staged on open lot on Hoot Owl street with stabilized access. Subdivision inlets have sediment filter bags, lots pregraded to drain away from hillside back towards street; earthen berm along hillside edge. Permit signs posted for the 3 projects. Approved.
ESC16-01196 Site Preparation11/7/201611/8/201611/8/2016 12:22:45 PMAPASS
Austin Phone #: ###-####


First 3 units in Harris North, all 3 parcels adjacent. Portable concrete washout facility with regular servicing to be staged on open lot on Hoot Owl street with stabilized access. Subdivision inlets have sediment filter bags, lots pregraded to drain away from hillside back towards street; earthen berm along hillside edge. Permit signs posted for the 3 projects. Approved.
ESC16-01199 Site Preparation11/7/201611/8/201611/8/2016 12:22:26 PMAPASS
Austin Phone #: ###-####


First 3 units in Harris North, all 3 parcels adjacent. Portable concrete washout facility with regular servicing to be staged on open lot on Hoot Owl street with stabilized access. Subdivision inlets have sediment filter bags, lots pregraded to drain away from hillside back towards street; earthen berm along hillside edge. Permit signs posted for the 3 projects. Approved.
ESC16-01373 Site Preparation11/7/201611/8/201611/8/2016 12:05:02 PMAPASS
Call ten minutes to meet // Tom Phone #: ###-####

Project with vegetated yard. Stabilized access provided via existing driveway. Excess dirt to be kept in backyard for landscaping and gardening. Work to begin next week.

Approved
ESC15-01552 Tracking Control11/8/201611/8/201611/8/2016 8:49:26 AMPCANC
ESC16-01080 Site Preparation10/19/201611/8/201611/8/2016 8:05:58 AMACANC
data entry error, rescheduled 11/9
ESC15-00033 General Inspection11/8/201611/8/201611/8/2016 8:02:54 AM CANC
ESC15-01627 Aging Inspection11/8/201611/8/201611/8/2016 8:02:38 AM CANC