ESC17-00954
| Tracking Control | 11/8/2017 | 11/8/2017 | 11/9/2017 10:09:40 AM | A | PASS |
|
|
check for entrance and clean up
Road sweeping and new rock construction entrance. Rock is angular and a geotextile lining is provided. Permit sign posted.
Conference scheduled for Monday 2 PM to discuss temporary winter stablization and installation of onsite sediment basins.
|
ESC16-01188
| Site Final | 11/8/2017 | 11/8/2017 | 11/9/2017 9:48:33 AM | P | PASS |
|
|
HOme complete, landscaped and occupied. No temporary BMPs or loose materials remaining.
|
ESC17-01329
| Site Preparation | 11/8/2017 | 11/8/2017 | 11/9/2017 9:35:14 AM | P | CANC |
|
|
Dave ###-####
|
ESC03-01445
| DOC - Permit Finaled | 11/8/2017 | 11/8/2017 | 11/8/2017 4:20:34 PM | P | PASS |
|
|
old expired permit
|
ESC17-00347
| General Inspection | 11/8/2017 | 11/8/2017 | 11/8/2017 2:51:37 PM | P | FAIL |
|
|
New contractor does not have an ESC permit with City, site did not notify permit transfer fee. This permit to be closed and new ESC permit ESC17-01545 needs to be issued with BLD17-01763
|
ESC16-01332
| DOC - Permit Finaled | 11/8/2017 | 11/8/2017 | 11/8/2017 2:44:46 PM | P | PASS |
|
|
|
ESC17-01491
| Site Preparation | 11/8/2017 | 11/8/2017 | 11/8/2017 11:55:55 AM | P | PEND |
|
|
check on dewatering plan setup dewatering not yet commenced. Materials for settling chamber are now on site. Syman Co. installing perimeter controls.
Note:
Need to have BPR and Brighton remove old silt fence along Walling Creek downstream from bridge site.
Will check back later today or tomorrow AM to confirm water treatment. There is some backed up water in Creek about 100 M downstream
|
ESC16-01233
| General Inspection | 11/8/2017 | 11/8/2017 | 11/8/2017 8:06:18 AM | | CANC |
|
|
|