PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Thursday, November 8, 2018
.
Number of inspections:
12
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC17-01011
Site Final
10/29/2018
11/8/2018
11/8/2018 1:38:37 PM
A
NR
ESC18-00895
General Inspection
11/8/2018
11/8/2018
11/8/2018 1:37:35 PM
P
FAIL
Pick up trash and clean up and maintain concrete washout pit. Reinstall or remove discarded wattles laying around the site.
ESC18-00920
General Inspection
11/8/2018
11/8/2018
11/8/2018 12:24:24 PM
P
FAIL
Multiple violations.
- no required site preparation inspection
- no permit sign posted.
- no concrete washout pit or container onsite
- no construction entrance
Corrections:
- post ESC permit sign
- review ESC site plan and install BMPs listed, in particular concrete washout, trash container, and perimter wattles on the down hill side of parcel.
Make corrections and schedule a site preparation inspection for next week.
ESC18-00440
General Inspection
11/8/2018
11/8/2018
11/8/2018 12:13:16 PM
P
PART
Work complete per H2O Pools per RP. BLD and ESC permit are not finaled. Disturbed area, trash, and other building materials are still present in lot below home.
Both permits need to be finaled or transfer is H2O is no longer on the job.
ESC18-01284
Site Preparation
11/7/2018
11/8/2018
11/8/2018 10:05:40 AM
A
PASS
930 am
Pre construciton review of ESC plan with RP-excavator Buzz and homeowner Fabian.
On downhill side of lot perimeter silt fence with J hook outlet will be install. WIll set back from street a bit to utilize the existing flat grassy area.
Review concrete washout containment options. Brooms for daily sweeping are on site. Homeowner has talked to neighbors. No sediment protection requested on downstream inlet due to disctance and large drainage area for system. Will keep dirt on site and monitor trackout.
Permit posted. Approved for construction.
ESC16-01410
General Inspection
11/8/2018
11/8/2018
11/8/2018 9:37:42 AM
PEND
ESC17-01659
DOC - Permit Finaled
11/8/2018
11/8/2018
11/8/2018 8:27:39 AM
P
PASS
ESC17-01659
Aging Inspection
11/8/2018
11/8/2018
11/8/2018 8:27:09 AM
PASS
Home complete. Subdivision BMPs to remain installed for ongoing construction. See ESC17-00018 for Barber Junction main permit.
ESC17-01663
Aging Inspection
11/8/2018
11/8/2018
11/8/2018 8:26:36 AM
PASS
Home complete. Subdivision BMPs to remain installed for ongoing construction. See ESC17-00018 for Barber Junction main permit.
ESC17-01663
DOC - Permit Finaled
11/8/2018
11/8/2018
11/8/2018 8:26:23 AM
P
PASS
ESC17-01657
Aging Inspection
11/8/2018
11/8/2018
11/8/2018 8:26:09 AM
PASS
Home complete. Subdivision BMPs to remain installed for ongoing construction. See ESC17-00018 for Barber Junction main permit.
ESC17-01657
DOC - Permit Finaled
11/8/2018
11/8/2018
11/8/2018 8:24:49 AM
P
PASS