Inspections for the day of: Wednesday, November 9, 2016.
Number of inspections: 25
Percentage of inspections complete: 96 %
Percentage of inspections not complete: 4 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-01343 Site Final11/1/201611/4/2016 P 
ESC15-01204 Site Final11/8/201611/9/201611/16/2016 8:09:23 AMAPASS
Home complete, yard installed, alley way access stabilized and cleaned. All permits finaled. ESC conditions satisfied
ESC15-01004 General Inspection11/9/201611/9/201611/15/2016 9:59:44 AM CANC
ESC15-01287 General Inspection11/9/201611/9/201611/10/2016 3:39:40 PM PEND
ESC15-01188 General Inspection11/9/201611/9/201611/10/2016 1:34:36 PM CANC
ESC16-00202 Aging Inspection11/9/201611/9/201611/10/2016 8:25:30 AM PASS
Home complete, landscaped and occupied. ESC conditions satisfied.
ESC16-00345 Aging Inspection11/9/201611/9/201611/10/2016 7:44:41 AM CANC
ESC16-00310 General Inspection11/9/201611/9/201611/10/2016 7:43:15 AM CANC
ESC15-00853 General Inspection11/9/201611/9/201611/9/2016 2:37:01 PM PASS
Road was swept and DI bags installed. Awaiting new permits to be issued for further corrections to be acccomplished. No discharges or trackout.
ESC16-00339 Aging Inspection11/9/201611/9/201611/9/2016 2:34:43 PM PASS
Final landscaping in progess. No violations. BLD open
ESC16-00966 General Inspection11/9/201611/9/201611/9/2016 2:17:37 PMPPART
ESC BMPs installed (permit sign, perimeter silt fence, DI protection).

Violation:
trash containment is overwhelmed. Boxes, wrappers, and other materials exposed to wind and elements. Windblown litter on hillside below home.

Correction - empty trash ASAP , pick up all litter around site including on slopes below silt fence. Correction requested to Dave w/ Canyon Crest
ESC16-00325 Aging Inspection11/9/201611/9/201611/9/2016 12:48:27 PM DEFR
to be finaled with BLD
ESC16-01407 General Inspection11/9/201611/9/201611/9/2016 12:47:05 PMPPASS
WIP. Permit sign posted. Street,sidewalk and gutter cleaned. Foundation recently poured, concrete washout containment utilized. RP-GC onsite. No violations.
ESC16-00557 General Inspection11/3/201611/9/201611/9/2016 12:45:52 PMPPASS
ESC16-00489 General Inspection11/9/201611/9/201611/9/2016 12:01:44 PM PASS
Subdivison construction is now complete in DHE#15. Shoulder landscaping and utilities are installed. All new storm drains have sediment protection. No disturbed area or loose material adjacent to Warm Springs Creek. 1 active project in progress by Seidl Homes
ESC14-01083 Conference11/9/201611/9/201611/9/2016 11:53:15 AMPDONE
ESC walk-through inspection and compliance conference for construction activities related to Park Place and future construction and site improvement along both sides of Barber Valley Drive.

New permit application to cover construction activities in area that are currently not part of active permits. This new permit will inlcude the employee parking area for the Arboretum project, staging area for Brighton Homes excavated dirt and rock stockpiles, and the concrete washout and landscaping material stockpile area for Park Place

Corrections to be completed:
- install sediment control wattle along the Walling Creek walking path and sloped area disturbed by irrigation line project
- clean up uncontained washout next to the washout pan facility . Increase frequency of service calls to prevent overflowing and dumping. Post signs for no dumping etc.

New permit application to be submitted next week for review.
ESC16-01080 General Inspection11/8/201611/9/201611/9/2016 10:51:48 AMPPASS
WIP on new gas station. No loose sediment or other material leaving site. Perimeter and inlet sediment controls installed. No trackout, rumblebars installed. Permit signa and SWPPP info posted. Approved.
ESC16-00865 General Inspection11/3/201611/9/201611/9/2016 10:24:34 AMPPASS
Perimter wattles properly installed around active construction site. Onsite storm water drainage has sediment protecton BMPs installed. Stabilized entrances to area have been preserved. No significant trackout to Executive. No fugitive dust at time of inspection.

Approved. No corrections requested.
ESC16-01283 Site Preparation11/8/201611/9/201611/9/2016 10:05:24 AMAPASS
Brett Phone #: ###-####


Permit sign posted. Subdivsion BMPs installed. New concrete washout pit has been provided for new foundation work. Active projects in compliance. Approved.
ESC16-01402 Site Preparation11/8/201611/9/201611/9/2016 10:05:04 AMPPASS
Brett Phone #: ###-####

Permit sign posted. Subdivsion BMPs installed. New concrete washout pit has been provided for new foundation work. Active projects in compliance. Approved.
ESC16-00156 General Inspection11/9/201611/9/201611/9/2016 10:02:58 AMAPASS
Subdivsion BMPs installed. No significant trackout or loose dirt on impermeable suraces Permit signs posted at individual sites. RP on site daily

Corrections to remove silt fence and pick up trash along the creek/ditch have been completed.
Discussion to consider providing trash box for foundation waste.
ESC16-00427 General Inspection11/9/201611/9/201611/9/2016 9:59:36 AM PASS
Construction of path and bridge complete. Shoulders have been hydroseeded. No materials, debris, or equipment left onsite.

Corrections issued in prior inspection have been completed:
- trash has been picked up along creek banks and walking path
- orange silt fence temporary BMP removed

No new corrections. Will keep open to monitor vegetation growth and Peppermill #2 activity.

ESC15-01526 DOC - Permit Finaled11/9/201611/9/201611/9/2016 9:03:06 AMPPASS
ESC15-01625 Aging Inspection11/9/201611/9/201611/9/2016 7:46:16 AM PASS
Townhome complete and landscaped. BLVD townhome projects still in progress, temp BmPs to remain installed
ESC15-01625 DOC - Permit Finaled11/9/201611/9/201611/9/2016 7:45:33 AMPPASS