PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Thursday, November 9, 2017
.
Number of inspections:
12
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC17-00589
DOC - Permit Finaled
11/9/2017
11/9/2017
11/9/2017 2:18:09 PM
P
PASS
ESC16-00849
General Inspection
11/9/2017
11/9/2017
11/9/2017 2:11:40 PM
CANC
rescheduled for site final
ESC17-00205
General Inspection
11/9/2017
11/9/2017
11/9/2017 10:42:47 AM
PASS
WIP. BMPs installed. Trash contained, no trackout from Horse Trail to Bogus Basin Rd.
ESC17-00190
Random Inspection
11/9/2017
11/9/2017
11/9/2017 10:28:08 AM
A
PASS
Landscaping/tree planting along BB Road frontage is complete. Slopes have now been hydroseeded and appears to have tacifier mixed in. No perimeter sediment controls or slope interupting wattles installed, but grading and drainage features installed should protect many slopes. Terraced lots are sloped towards road and have berms to divert water away from slopes.
Some hydroseeding on slopes remains. No acitivity at time of inspection.
ESC15-00853
General Inspection
11/9/2017
11/9/2017
11/9/2017 10:01:42 AM
FAIL
WIP on two units. DI bags in good condition. No trackout or discharges from site.
Corrections:
- pick up loose trash
- block off access to bare lots not in use.
- clean up dried uncontained concrete washout
Corrections should be completed by end of next week. Verbal correction to GC Ron.
ESC16-01335
DOC - Permit Finaled
11/9/2017
11/9/2017
11/9/2017 9:58:48 AM
P
PASS
ESC16-01335
General Inspection
11/9/2017
11/9/2017
11/9/2017 9:58:30 AM
PASS
North Hill townhome unit complete. Construction in progress on east end of site. Temp. BMPs to remain installed.
ESC16-01333
DOC - Permit Finaled
11/9/2017
11/9/2017
11/9/2017 9:56:31 AM
P
PASS
ESC17-01329
Site Preparation
11/9/2017
11/9/2017
11/9/2017 9:34:53 AM
A
PASS
Perimeter sediment controls and construction entrances installed at both access points. Stormwater drains towards center of site. New stormwater vaults being installed.
Approved.
ESC16-01391
DOC - Permit Finaled
11/9/2017
11/9/2017
11/9/2017 8:49:55 AM
P
PASS
ESC16-01464
Aging Inspection
11/9/2017
11/9/2017
11/9/2017 8:02:47 AM
CANC
rescheduled for site final
ESC16-01108
General Inspection
11/9/2017
11/9/2017
11/9/2017 7:58:31 AM
CANC