Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-01231 General Inspection12/1/201412/1/201412/1/2014 5:12:52 PM PASS
Boise Heights apartment complex is in progress. Frame of building is up and most earthwork and utility work offsite has been completed.

No trackout, permit is posted at entrance. Site has rock construction entrances with rumble bars.

No violations observed at time of inspection..
ESC14-00188 General Inspection12/1/201412/1/201412/1/2014 4:46:45 PM PASS
This phase of Old Boise Street scapes is complete. Vault work and retaining wall have been installed in July/August. Site stabilized with sidewalk and tree installation. No further ESC inspections. Permit finaled.
ESC14-00188 DOC - Permit Finaled12/1/201412/1/201412/1/2014 4:45:48 PMPPASS
ESC14-00929 DOC - Permit Finaled12/1/201412/1/201412/1/2014 4:11:49 PMPPASS
Pipeline project on eastern edge of airport area is complete and site returned to preexisting condtions. Temp BMPs have been removed and construction complete.
ESC14-00932 Random Inspection12/1/201412/1/201412/1/2014 4:04:04 PMPPASS
Western Trailer parking lot has had initial grading and site work completed. Talked to the project manager for Western Trailer and he informed me the project is currently shut down for winter and will resume once conditions improve for asphalt and cement work.

Permit posted, site surrounded by trenched in perimeter wattles. No trackout or other ESC issues/discharges. Approved.
ESC14-01083 Random Inspection12/1/201412/1/201412/1/2014 3:26:53 PMPPASS
Barber Valley townhome site is in progress including onsite utility/stormwater/sewer work and the off-site power line trench to the northwest of site.

No trackout from either locations, equipment is kept on site. No dewatering to offsite swale in park occuring until approval gained from Parks n Rec. Brighton RP notified to consider different options than discharging into swale. Currently the onsite dewatering mote and series of 4 settling/infiltration ponds have been constructed and are in use. The water in the 4 chamber is visibly clearer indicating treatment. No pipes or conveyance to swale has been installed and current capacity appears adequate.

No corrections at this time.
ESC13-00691 Aging Inspection12/1/201412/1/201412/1/2014 2:38:15 PM PASS
Project is not complete on the interior and the yard is not yet landscaped. No sediment leaving site due to trackout or stormwater. Home renovation appears to be currently on hold. BLD is open/permit posted.
ESC13-01054 Aging Inspection12/1/201412/1/201412/1/2014 2:20:27 PM PASS
Exterior construction complete and disturbed area has been landscaped/stabilized. BLD open, but no acitivity in 11 months. ESC permit conditions satisfied, no issues at site. Finaled.
ESC13-01054 DOC - Permit Finaled12/1/201412/1/201412/1/2014 2:18:39 PMPPASS
ESC13-00702 Aging Inspection12/1/201412/1/201412/1/2014 1:53:43 PM PASS
WIP. Homeowner RP project is near completion. Stockpile and yard on east side (near alley) are need removal and stabilization/landscaping. Permits are posted. No ESC corrections needed at this time.
ESC14-01033 Site Preparation12/1/201412/1/201412/1/2014 12:33:20 PMPPASS
Jim Phone #: ###-####

Site ready for excavation. New infill lots on flat terrain and no surface water on or adjacent to site. Once utility lines are installed, contractor will provide vehicle tracking pad for sub-contractors since there is no on-street parking on Fivemile.

Permit posted. BMPs will be sediment control for trackout and general housekeeping. Approved.
ESC14-00066 General Inspection12/1/201412/1/201412/1/2014 11:44:08 AM PASS
Cordillera sub development and individual units are in progress with mostly interior work on going.

Open areas are landscaped and parking lot & sidewalks paved. Trash and waste constuction materials are contained. No trackout or illicit discharges offsite to Florence. Approved.
ESC14-00068 General Inspection12/1/201412/1/201412/1/2014 11:43:49 AM PASS
Cordillera sub development and individual units are in progress with mostly interior work on going.

Open areas are landscaped and parking lot & sidewalks paved. Trash and waste constuction materials are contained. No trackout or illicit discharges offsite to Florence. Approved.
ESC14-01081 Site Preparation12/1/201412/1/201412/1/2014 11:14:28 AMPPASS
Scott Phone #: ###-####

Site is flat lot with no DI in vicinity. RP/GC familiar with ESC permit conditions & expectations. Excavation started prior to site prep due to some confusion between owner/builder but was requested make sure they are in compliance. Permit posted. No trackout or discharges. Approved.
ESC13-00323 General Inspection12/1/201412/1/201412/1/2014 10:35:42 AM PASS
Dropzone Subdivision development under this permit is complete. All roads, utilities, and stormwater drainage system is installed. Open lots are adequately vegetated with various grasses and weeds.

Associated CGP eNOIs have been terminated (IDR12CI63,IDR12CI88) with a new permit open for the multiple SFHs being built by CBH. These homes have seperate ESC permits that are issued.

ESC conditions satisfied for this permit.
ESC13-00323 DOC - Permit Finaled12/1/201412/1/201412/1/2014 10:32:28 AMPPASS
ESC13-01052 Aging Inspection12/1/201412/1/201412/1/2014 10:23:31 AM PASS
WIP. No ESC violations observed. Homeowner long term project appears.
ESC14-00279 DOC - Permit Finaled12/1/201412/1/201412/1/2014 10:16:21 AMAPASS
Row home complete, landscaped, and site has been cleaned and home is for sale. ESC permit conditions approved.
ESC13-00863 DOC - Permit Finaled12/1/201412/1/201412/1/2014 10:03:18 AMPPASS
ESC13-00863 Aging Inspection12/1/201412/1/201412/1/2014 10:02:56 AM PASS
Exterior construction and earthwork for garage addition is complete. No ESC issues at site and no further inspections necessary. Permit conditions finaled. BLD still open.
ESC14-00086 General Inspection12/1/201412/1/201412/1/2014 9:48:07 AMAPART
Village Chaton Sub parking lot and sidewalk/curbing is installed. Sheet flow for entire impervious surfaces on site is directed to a central drop inlet with interceptor & frech drain. The inlet has filter bag protection and remaining capacity.

No trackout or offsite discharges to Ustick occuring. Trash is mostly contained in large dumpster with minimal windblown litter. A lined concrete washout was used but is now full and dried so need to be cleaned/removed. All permits posted with SWPPP info.

1 correction:
Conduct a general cleanup at site:
-pick up waste insulation bundles/fragments
-sweep sidewalks and areas of parking lot with loose sediment/dirt
-remove concrete washout.

Sub-contractors onsite conducting interior work on 4-plexes currently.

Verbal correction request issued to Andersen Construction RP.
ESC14-00260 General Inspection12/1/201412/1/201412/1/2014 9:42:40 AM PASS
Village Chaton 4-plex in progrgress. Frame and sidewalks installed, working on interior. See ESC14-00086 for subdivision inspection notes. Individual units (4) are in compliance.
ESC14-00259 General Inspection12/1/201412/1/201412/1/2014 9:42:23 AM PASS
Village Chaton 4-plex in progrgress. Frame and sidewalks installed, working on interior. See ESC14-00086 for subdivision inspection notes. Individual units (4) are in compliance.
ESC14-00258 General Inspection12/1/201412/1/201412/1/2014 9:42:06 AM PASS
Village Chaton 4-plex in progrgress. Frame and sidewalks installed, working on interior. See ESC14-00086 for subdivision inspection notes. Individual units (4) are in compliance.
ESC14-00257 General Inspection12/1/201412/1/201412/1/2014 9:41:48 AM PASS
Village Chaton 4-plex in progrgress. Frame and sidewalks installed, working on interior. See ESC14-00086 for subdivision inspection notes. Individual units (4) are in compliance.