Inspections for the day of: Monday, December 10, 2018.
Number of inspections: 11
Percentage of inspections complete: 91 %
Percentage of inspections not complete: 9 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01102 Conference11/30/201812/3/2018 A 
ESC17-01791 General Inspection12/10/201812/10/201812/12/2018 10:17:29 AM PASS
WIP on vertical and interior. Staging area is clean, no discharges or loose materials. Permit posted.
ESC18-00311 General Inspection12/10/201812/10/201812/11/2018 11:26:40 AM PASS
No trackout or discharges. House is framed, downslope vegetation below home preserved. BMPs installed, RP on duty. No corrections requested.,
ESC16-01457 General Inspection12/10/201812/10/201812/10/2018 4:44:14 PM PASS
ESC18-01333 Site Preparation12/10/201812/10/201812/10/2018 4:44:00 PMPPASS
Please call 30 min prior if possible. Thank you. Phone #: ###-#### Inspection requested via web by Ken Litzinger

Permit sign posted. Perimeter wattle is properly installed. Road mix base installed for initial access and staging. Excavation in progress. Equipment parked on lot, no trackout. Crews have kept sidewalk and road shoulder clean.
ESC17-01790 General Inspection12/10/201812/10/201812/10/2018 3:17:38 PM PASS
ESC16-01472 General Inspection12/10/201812/10/201812/10/2018 3:09:46 PM PEND
road mix layed placed on Logan Alley row. Sandy material covers mud, but causing some sandy trackout. Need to check if this is permitted surface and additional controls to retain runoff on site and check sediment controls.
ESC17-00508 Aging Inspection12/10/201812/10/201812/10/2018 10:49:57 AM PASS
ESC17-00774 General Inspection12/10/201812/10/201812/10/2018 8:29:41 AM CANC
ESC18-01333 Site Preparation12/6/201812/10/201812/10/2018 8:29:21 AMACANC
ESC16-01410 General Inspection12/10/201812/10/201812/10/2018 8:29:02 AM PASS
snow covered conditions. Construction complete. Project is in monitoring phase for slope revegetation