Inspections for the day of: Tuesday, December 10, 2019.
Number of inspections: 3
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01687 General Inspection12/10/201912/10/201912/10/2019 3:18:39 PMPPASS
Meeting with Toby, Boise Parks and Rec project manager. This permit covers the bike park and dog park vegetation establishment phase. After establishment, temporary storm drains and wattles will be removed and permit closed.

Boise Parks and Rec will complete SWPPP inspections at a reduced frequency this winter.

Going to add a slope runon diversion berm along the parallel parking area for dog park to divert sheet flow away from the slope that is not yet vegetated/stabilized
ESC18-00446 Aging Inspection12/10/201912/10/201912/10/2019 8:14:51 AM CANC
no current exterior activity
ESC18-00668 Aging Inspection12/10/201912/10/201912/10/2019 8:14:28 AM DEFR
to be finaled by BLD inspector