ESC15-00835
| Aging Inspection | 12/11/2015 | 12/11/2015 | 12/14/2015 4:39:57 PM | | PART |
|
|
Need to sweep street in front of project and install perimeter wattles that are not staked in.
Will check back this week as the lot dries out.
|
ESC14-00809
| General Inspection | 12/11/2015 | 12/11/2015 | 12/14/2015 1:12:31 PM | | PASS |
|
|
|
ESC15-01362
| BMP Violation | 12/11/2015 | 12/11/2015 | 12/14/2015 11:43:37 AM | P | PASS |
|
|
Follow up to ensure project is back in compliance and corrections have been made
Rebar and materials moved out of ROW as requested. Some rebar in gutter will be removed ASAP but is no longer obstructing vehicle or pedestrian traffic.
RP onsite, discuss further clean up of sidewalk as conditions allow, still needs some work. Roadway was swept and mud clods removed Friday PM.
Will continue to montior. Rear silt fence BMP and preserved vegetation in good condition.
|
ESC15-00082
| General Inspection | 12/11/2015 | 12/11/2015 | 12/11/2015 3:27:59 PM | | CANC |
|
|
|
ESC14-00338
| General Inspection | 12/11/2015 | 12/11/2015 | 12/11/2015 3:26:56 PM | | CANC |
|
|
rescheduled
|
ESC15-01349
| Conference | 12/11/2015 | 12/11/2015 | 12/11/2015 3:15:20 PM | P | DONE |
|
|
|
ESC15-01349
| BMP Violation | 12/11/2015 | 12/11/2015 | 12/11/2015 3:09:40 PM | P | PART |
|
|
>No filter bag as of this morning still.
DI bag installed now installed on Wildwood
- corrections needed - pick up litter and waste on open lot on Wildwood and Race - have Race street and alley swept with street sweeping next - check all DI bags for maintenance.
|
ESC15-00740
| Aging Inspection | 12/11/2015 | 12/11/2015 | 12/11/2015 3:09:39 PM | | PASS |
|
|
|
ESC15-01061
| General Inspection | 12/10/2015 | 12/11/2015 | 12/11/2015 1:46:24 PM | A | FAIL |
|
|
Muddy trackout and runoff from disturbed unstabilzed entrance:
Corrections and maintenance needed: - repair silt fence
- install construciton entrance or block driveway access with sediment control BMP - Remove mud clods and sweep gutter and change out DI bag
Verbal CN issued to RP and GC. Will check Monday PM
|
ESC14-00299
| General Inspection | 12/11/2015 | 12/11/2015 | 12/11/2015 11:57:58 AM | P | PART |
|
|
Silt fence BMP at bottom of lot is keeping sediment on site.
Need to sweep sidewalk and clean out gutter. Check DI bag. Need to place rip rap for rooftop gutter outlet.
|
ESC15-00659
| General Inspection | 12/11/2015 | 12/11/2015 | 12/11/2015 11:37:14 AM | | PASS |
|
|
SFH near completion but not yet landscaped or stabilized. Perimeter BMPs containing and treating runoff from Somerset Village. No violations observed. Clean site.
|
ESC11-00192
| General Inspection | 12/11/2015 | 12/11/2015 | 12/11/2015 11:17:24 AM | | PASS |
|
|
No activity. Runoff is clear. Some minor trackout on Heavens Way due to joy riders on mud. Jayo will clean up.
Approved.
|
ESC13-00193
| General Inspection | 12/11/2015 | 12/11/2015 | 12/11/2015 11:14:13 AM | | PASS |
|
|
No sediment runoff or issues. Slopes are stabile and vegetated. Ken with Jayo was on site cleaning collected sediment around the inlet.
Approved.
|
ESC14-00664
| General Inspection | 12/11/2015 | 12/11/2015 | 12/11/2015 11:00:00 AM | | PASS |
|
|
Work has resumed. No track out, site perimeter in good conditions and retaining walls preventing erosion. No corrections.
|
ESC15-00709
| General Inspection | 12/11/2015 | 12/11/2015 | 12/11/2015 10:51:26 AM | P | PEND |
|
|
WIP on corrections. BMP failure and muddy runoff occured yesterday and RP/GC was given final warning.
Silt fence is now installed, runoff diversion channels are now dug, and gator guard wattle installed along side of neighbors driveway.
Corrections still in progress - road to be swept this afternoon. WIP but site is near compliance.
|
ESC15-01210
| General Inspection | 12/11/2015 | 12/11/2015 | 12/11/2015 10:31:44 AM | P | PASS |
|
|
No discharge from discharge point. New BMPs effective but pond is still not sustainable in the event of more prolonged rain storms.
ESC crew onsite doing maintenance on wattles failures, removing vehicle ruts on road that are channelling and concentrating water, and digging diversion trench to get water into the upper pond.
Approved for now, will continue to monitor.
|
ESC15-00177
| BMP Violation | 12/10/2015 | 12/11/2015 | 12/10/2015 4:55:50 PM | A | CANC |
|
|
data entry error
|