ESC13-00503
| Aging Inspection | 12/12/2013 | 12/12/2013 | 12/12/2013 4:03:45 PM | | PASS |
|
|
Finaled.
|
ESC13-00503
| DOC - Permit Finaled | 12/12/2013 | 12/12/2013 | 12/12/2013 4:03:33 PM | P | PASS |
|
|
House complete. BLD permit finaled. No further ESC inspections required.
|
ESC13-00940
| General Inspection | 12/12/2013 | 12/12/2013 | 12/12/2013 1:20:09 PM | | PASS |
|
|
Curb work is installed and complete. No activity. Unclear is area is stabilized due to snow cover. If stabilized, can be finaled next inspection. Curbing on corner of Luke and Rickenbacker.
|
ESC13-00806
| General Inspection | 12/12/2013 | 12/12/2013 | 12/12/2013 11:44:06 AM | | PASS |
|
|
Silt fence perimeter installed and in proper condition. No trackout visible, WIP. No corrections at this time. You can inspect downslope from Angelview Street.
|
ESC13-00824
| General Inspection | 12/12/2013 | 12/12/2013 | 12/12/2013 11:37:11 AM | | PASS |
|
|
WIP. In compliance at time of inspection.
|
ESC12-01033
| General Inspection | 12/12/2013 | 12/12/2013 | 12/12/2013 11:33:57 AM | | PASS |
|
|
WIP. No track out or other violations observed.
|
ESC12-00577
| General Inspection | 12/12/2013 | 12/12/2013 | 12/12/2013 11:30:02 AM | | PASS |
|
|
No further construction activity. BLD is still open. Silt fence and wattles still installed while stabilization is in progress. Will need to be removed at Final. No corrections at this time.
|
ESC12-00508
| DOC - Permit Finaled | 12/12/2013 | 12/12/2013 | 12/12/2013 11:28:40 AM | P | PASS |
|
|
See activity notes.
|
ESC12-00508
| General Inspection | 12/12/2013 | 12/12/2013 | 12/12/2013 11:28:17 AM | | PASS |
|
|
House complete, landscaped, and stabilized. No further ESC inspections required.
|
ESC13-00508
| Aging Inspection | 12/12/2013 | 12/12/2013 | 12/12/2013 11:10:08 AM | | PASS |
|
|
Garage is complete. Laying patio/walkway around garage. No activity or violations at timeof inspection.
|
ESC13-00432
| Aging Inspection | 12/12/2013 | 12/12/2013 | 12/12/2013 11:01:37 AM | | PASS |
|
|
Finaled.
|
ESC13-00432
| DOC - Permit Finaled | 12/12/2013 | 12/12/2013 | 12/12/2013 11:00:47 AM | P | PASS |
|
|
House complete, landscaped, and occupied. ESC conditions satisfied.
|
ESC13-00450
| Aging Inspection | 12/12/2013 | 12/12/2013 | 12/12/2013 10:37:57 AM | | PASS |
|
|
Finaled.
|
ESC13-00450
| DOC - Permit Finaled | 12/12/2013 | 12/12/2013 | 12/12/2013 10:37:19 AM | P | PASS |
|
|
Project complete. Permits finaled. ESC conditions satisfied.
|
ESC13-01205
| Site Preparation | 12/11/2013 | 12/12/2013 | 12/12/2013 10:30:18 AM | A | PASS |
|
|
Lance-Please call prior to inspection Phone #: ###-####
Met Lance on site to discuss project. Low risk. BMPs include stockpile management in trailor and same day removal as necessary, construction phasing. Will provide washout for driveway. No adjacent MS4 structures. Permit posted. Approved for construction.
|
ESC13-00507
| Aging Inspection | 12/12/2013 | 12/12/2013 | 12/12/2013 9:59:35 AM | | PASS |
|
|
Minor exterior work remaining. Garage has been built. No stockpiles or disturbed areas on site.
|
ESC13-00778
| General Inspection | 12/12/2013 | 12/12/2013 | 12/12/2013 9:47:27 AM | | PASS |
|
|
No activity. Western portion of Greenbelt is not yet complete. No corrections at this time.
|
ESC09-00352
| General Inspection | 12/12/2013 | 12/12/2013 | 12/12/2013 8:38:00 AM | | CANC |
|
|
No changes in project status.
|
ESC13-00802
| General Inspection | 12/12/2013 | 12/12/2013 | 12/12/2013 8:35:45 AM | | PASS |
|
|
No corrections required at this time.
|