ESC15-00857
| General Inspection | 12/6/2016 | 12/6/2016 | | | |
|
|
|
ESC15-01579
| General Inspection | 12/7/2016 | 12/12/2016 | 12/19/2016 3:20:35 PM | P | CANC |
|
|
check for trash clean up and installation of wattles or new silt fence....
|
ESC16-01241
| General Inspection | 12/9/2016 | 12/12/2016 | 12/19/2016 3:20:04 PM | P | CANC |
|
|
|
ESC16-00429
| Site Final | 12/9/2016 | 12/12/2016 | 12/16/2016 9:20:07 AM | A | CANC |
|
|
|
ESC15-00434
| General Inspection | 12/12/2016 | 12/12/2016 | 12/15/2016 12:54:34 PM | | PASS |
|
|
No trackout to Gary or Saxton. Stormwater retained on site. No corrections requested.
|
ESC16-00955
| General Inspection | 12/5/2016 | 12/12/2016 | 12/15/2016 12:29:23 PM | P | PART |
|
|
No sediment runoff from perimeter.
Correction -
sweep up trackout to Collister from access drive
|
ESC15-01175
| General Inspection | 12/12/2016 | 12/12/2016 | 12/14/2016 11:34:00 AM | | PART |
|
|
WIP on interior and concrete work on entry way plaza. Storm drains have sediment protection. No discharges or spills observed.
correction: - sweep closed lane and staging area on Capitol once concrete work is complete.
|
ESC11-00879
| General Inspection | 12/12/2016 | 12/12/2016 | 12/14/2016 8:27:55 AM | | CANC |
|
|
|
ESC12-00403
| General Inspection | 12/12/2016 | 12/12/2016 | 12/13/2016 3:46:03 PM | | CANC |
|
|
|
ESC13-00806
| General Inspection | 12/12/2016 | 12/12/2016 | 12/13/2016 3:45:51 PM | | CANC |
|
|
|
ESC14-00296
| General Inspection | 12/12/2016 | 12/12/2016 | 12/13/2016 9:22:54 AM | | PASS |
|
|
All temporary BMPs (drop inlet filter bags) installed for project have now been removed, including on 8th and Main Street. No other corrections requested.
ESC permit conditions satisfied.
|
ESC16-00488
| General Inspection | 12/12/2016 | 12/12/2016 | 12/13/2016 8:05:58 AM | | CANC |
|
|
|
ESC15-00403
| General Inspection | 12/12/2016 | 12/12/2016 | 12/13/2016 8:05:36 AM | | CANC |
|
|
|
ESC16-01335
| Site Preparation | 12/12/2016 | 12/12/2016 | 12/12/2016 3:04:11 PM | P | PASS |
|
|
Approved for construction. Subdivision storm drains have inlet protection, frontage landscaping is now completed.
See also main North Hill subdivision permit ESC15-00853 for corrections currently in progress.
|
ESC16-01334
| Site Preparation | 12/12/2016 | 12/12/2016 | 12/12/2016 3:03:53 PM | P | PASS |
|
|
Approved for construction. Subdivision storm drains have inlet protection, frontage landscaping is now completed.
See also main North Hill subdivision permit ESC15-00853 for corrections currently in progress.
|
ESC16-01333
| Site Preparation | 12/12/2016 | 12/12/2016 | 12/12/2016 2:47:14 PM | P | PASS |
|
|
Approved for construction. Subdivision storm drains have inlet protection, frontage landscaping is now completed.
See also main North Hill subdivision permit ESC15-00853 for corrections currently in progress.
|
ESC16-01332
| Site Preparation | 12/12/2016 | 12/12/2016 | 12/12/2016 2:42:07 PM | P | PASS |
|
|
Approved for construction. Subdivision storm drains have inlet protection, frontage landscaping is now completed.
See also main North Hill subdivision permit ESC15-00853 for corrections currently in progress.
|
ESC16-01316
| Site Preparation | 12/12/2016 | 12/12/2016 | 12/12/2016 2:41:49 PM | P | PASS |
|
|
Approved for construction. Subdivision storm drains have inlet protection, frontage landscaping is now completed.
See also main North Hill subdivision permit ESC15-00853 for corrections currently in progress.
|
ESC16-01314
| Site Preparation | 12/12/2016 | 12/12/2016 | 12/12/2016 2:41:31 PM | P | PASS |
|
|
Approved for construction. Subdivision storm drains have inlet protection, frontage landscaping is now completed.
See also main North Hill subdivision permit ESC15-00853 for corrections currently in progress.
|
ESC16-01338
| Site Preparation | 12/12/2016 | 12/12/2016 | 12/12/2016 2:41:14 PM | P | PASS |
|
|
Approved for construction. Subdivision storm drains have inlet protection, frontage landscaping is now completed.
See also main North Hill subdivision permit ESC15-00853 for corrections currently in progress.
|
ESC16-01337
| Site Preparation | 12/12/2016 | 12/12/2016 | 12/12/2016 2:40:56 PM | P | PASS |
|
|
Approved for construction. Subdivision storm drains have inlet protection, frontage landscaping is now completed.
See also main North Hill subdivision permit ESC15-00853 for corrections currently in progress.
|
ESC15-00860
| Aging Inspection | 12/12/2016 | 12/12/2016 | 12/12/2016 12:17:22 PM | | PASS |
|
|
WIP on interior. No exterior activity. No corrections at this time. BLD is open with limited activity.
|
ESC15-01067
| Aging Inspection | 12/12/2016 | 12/12/2016 | 12/12/2016 11:09:05 AM | | CANC |
|
|
|
ESC16-00346
| Site Final | 12/12/2016 | 12/12/2016 | 12/12/2016 10:26:17 AM | A | PASS |
|
|
Monument signs for storage facility are installed and landscaping/stabilization completed. WIP on interior. Main site ESC permit is still open, see ESC16-00384
|
ESC16-01278
| Site Preparation | 12/9/2016 | 12/12/2016 | 12/12/2016 10:14:52 AM | A | PASS |
|
|
ESC permit sign and SWPPP info posted. Perimeter control wattles and silt fence are properly installed. No trackout to Virginia, storm drain on east side of street has sediment filter bag installed.
Snow melt and rain runoff has been retained on site due to grading road footprint and creating a retention space. Water runs to center of site.
No corrections requested. Approved.
|
ESC15-00746
| Aging Inspection | 12/12/2016 | 12/12/2016 | 12/12/2016 10:06:53 AM | | PASS |
|
|
|
ESC16-00448
| General Inspection | 12/12/2016 | 12/12/2016 | 12/12/2016 10:00:26 AM | | PART |
|
|
WIP. No trackout or discharges, sidewalks still partially covered with snow and ice. Permit sign posted.
Correction request to conduct maintenance on DI filter mat on Overland and Atantic. Verbal request to RP Kevin.
|
ESC13-00690
| Aging Inspection | 12/12/2016 | 12/12/2016 | 12/12/2016 9:18:04 AM | | CANC |
|
|
|
ESC15-00951
| Aging Inspection | 12/12/2016 | 12/12/2016 | 12/12/2016 8:59:11 AM | | PASS |
|
|
|