ESC14-00662
| General Inspection | 12/16/2014 | 12/16/2014 | 12/16/2014 4:26:52 PM | | PASS |
|
|
New Dallas Harris phase in progress. Warm Springs and Old Hickory are relatively clean. New stormwater pond and drainage is under construction. No corrections.
|
ESC14-00657
| General Inspection | 12/16/2014 | 12/16/2014 | 12/16/2014 4:19:03 PM | | PASS |
|
|
No activity at site currently. No trackout or discharges occuring. No chemical or material storage at site. Permit posted and perimeter BMPs installed.
|
ESC14-00682
| General Inspection | 12/16/2014 | 12/16/2014 | 12/16/2014 4:09:54 PM | | CANC |
|
|
rescheduled
|
ESC14-01030
| Tracking Control | 12/16/2014 | 12/16/2014 | 12/16/2014 3:45:43 PM | P | PASS |
|
|
Permit posted. Trackout noted earlier has been cleaned. WIP. No corrections at this time.
|
ESC14-00514
| Complaint Inspection | 12/16/2014 | 12/16/2014 | 12/16/2014 3:44:35 PM | P | PART |
|
|
excecessive trackout reported by Public Works environmental technician
Inspection found that trackout is located within interior parking access drive (private). No trackout to McGregor or accumulations in MS4 gutters.
Parking lot still should be swept this week to prevent further trackout offsite. Project manager Josh stated that curbing crews would sweep this week after finishing work. Onsite storm drain has sediment bag installed.
No other violations observed.
|
ESC14-00191
| Aging Inspection | 12/16/2014 | 12/16/2014 | 12/16/2014 2:50:29 PM | | PASS |
|
|
Home demo complete. ESC permit finaled. New SFH is covered under ESC14-00550. No issues at time of inspection.
|
ESC14-00191
| DOC - Permit Finaled | 12/16/2014 | 12/16/2014 | 12/16/2014 2:49:43 PM | P | PASS |
|
|
|
ESC14-00529
| General Inspection | 12/16/2014 | 12/16/2014 | 12/16/2014 10:00:35 AM | | PASS |
|
|
|
ESC14-00574
| General Inspection | 12/16/2014 | 12/16/2014 | 12/16/2014 9:44:03 AM | | PASS |
|
|
Project complete, construction materials and loose sediment have been cleaned/removed. All other permits finaled. ESC conditions satisfied.
|
ESC14-00574
| DOC - Permit Finaled | 12/16/2014 | 12/16/2014 | 12/16/2014 9:43:27 AM | P | PASS |
|
|
|
ESC13-00655
| Random Inspection | 12/16/2014 | 12/16/2014 | 12/16/2014 9:34:45 AM | P | PART |
|
|
Corrections for Aberdeen Square subdivsion development:
1. Install drop inlet protection on the new stormdrain on Raymond at Colehaven. 2. This week the sidewalks and gutters should be swept. No major trackout or issues on roadway, but there is a significant amount of sediment and small debris in gutters and at drop inlets 3. Check capacity on inlet bags and do maintenance as necessary.
RP Jeremy notified of corretions by telephone
Overall site is in pretty good condition with BMPs installed.
|
ESC14-00501
| General Inspection | 12/16/2014 | 12/16/2014 | 12/16/2014 9:29:09 AM | | PASS |
|
|
Carport not yet complete. Posts and pavement are installed, but no canopy. Trash and building materials are consolidated and no trackout or discharges.
|
ESC14-00500
| General Inspection | 12/16/2014 | 12/16/2014 | 12/16/2014 9:04:39 AM | | PASS |
|
|
WIP on 4-plex. Aberdeen in good condition
|