ESC15-00267
| Site Final | 12/2/2015 | 12/16/2015 | 12/17/2015 3:17:00 PM | P | PASS |
|
|
Permit signs removed from fence. Permanent stormwater infrastructure installed. Temporary DI bag removed. Common areas landscaped and parking lot paved and mostly swept. No trackout, no stockpiles or loose materials. No further ESC inspections necessary.
|
ESC15-01210
| General Inspection | 12/16/2015 | 12/16/2015 | 12/16/2015 4:39:20 PM | P | PEND |
|
|
Inspection conducted to check conditions for potential snow melt runoff. No discharges from site, snow on upper portions not yet melted. Retention pond at bottom of site was nearly empty showing a decent infiltration rate and adding capacity for snow melt.
Work on placing manholes has been occuring this week by Knife River. Some trackout to Sherman and the access to the private driveway has occured. Onsite KR supervisor Tim had a crew starting to clean it up as best as possible in the wet & snowy conditions. Also resquested that KR make a diversion channel from the finished section of road to make sure flows are directed to the retention pond and wattles instead of the street.
Approved for now. Will check back for progress and conditions. Very sensitive site.
|
ESC15-00676
| Aging Inspection | 12/16/2015 | 12/16/2015 | 12/16/2015 3:39:29 PM | | PASS |
|
|
Construction complete. No disturbed area at site. ESC permit conditions satisfied
|
ESC15-00676
| DOC - Permit Finaled | 12/16/2015 | 12/16/2015 | 12/16/2015 3:38:24 PM | P | PASS |
|
|
|
ESC15-01349
| BMP Violation | 12/11/2015 | 12/16/2015 | 12/16/2015 3:01:07 PM | P | CANC |
|
|
rescheduled
|
ESC15-00719
| Aging Inspection | 12/16/2015 | 12/16/2015 | 12/16/2015 2:38:25 PM | | PASS |
|
|
WIP. No violations. Just need to keep up on housekeeping for the many Tahoe SFHs at East Valley. BMPs installed.
|
ESC15-00718
| Aging Inspection | 12/16/2015 | 12/16/2015 | 12/16/2015 2:37:32 PM | | PASS |
|
|
Construction complete. Needs landscaping and final stabilization. No violations.
|
ESC15-00894
| General Inspection | 12/16/2015 | 12/16/2015 | 12/16/2015 10:39:52 AM | P | PART |
|
|
Unapproved dirt and gravel ramp over gutter has been removed as requested. Recieving DIs on Saxton and State have inlet protection. Yellow permit sign is posted.
Correction: - still need to improve entrance and reduce trackout onto Saxton.
|
ESC15-00893
| General Inspection | 12/16/2015 | 12/16/2015 | 12/16/2015 10:38:10 AM | P | PART |
|
|
Trackout onto Saxton occuring due alternate entrance being used while access road is being installed. Significant amount of mud on Saxton. Curb cut inlet drops into intercepter but cannot be fitted with filter fabric or other BMP without causing roadway hazard or flooding.
Will request rock entrance once snowy conditions allow. No major trackout, no discharges offsite.
|
ESC15-00031
| Random Inspection | 12/16/2015 | 12/16/2015 | 12/16/2015 10:33:33 AM | P | PASS |
|
|
WIP on SFHs in Magnolia Park (formerly Fairmont Square). No sediment runoff from open lots. Permanent stormwater facilities are working properly and no discharges offsite. Builders parking on street to prevent trackout.
No corrections at this time
|
ESC15-00504
| General Inspection | 12/16/2015 | 12/16/2015 | 12/16/2015 10:17:57 AM | P | PART |
|
|
Construction entrance on Gary is installed and working well to prevent muddy trackout. Roads have recently been sanded by ACHD.
Significant amount of mud on Saxton. Storm drain inlet is a curb cut and cannot be fitting with a sediment control BMP. Sand bags placed earlier were causing flooding and traffic hazard.
Need to control traffic better in and out of site and put rock to stabilized the employee parking lot on Saxton.
|
ESC15-00691
| General Inspection | 12/16/2015 | 12/16/2015 | 12/16/2015 9:51:10 AM | | PASS |
|
|
WIP on condos. Site utilities and parking lot/stormwater drainage were existing. Vertical construction in progress. No muddy runoff or issues at site. No corrections. 4 seperate permits for the 4 buildings.
|
ESC15-00690
| General Inspection | 12/16/2015 | 12/16/2015 | 12/16/2015 9:51:00 AM | | PASS |
|
|
WIP on condos. Site utilities and parking lot/stormwater drainage were existing. Vertical construction in progress. No muddy runoff or issues at site. No corrections. 4 seperate permits for the 4 buildings.
|
ESC15-00689
| General Inspection | 12/16/2015 | 12/16/2015 | 12/16/2015 9:50:48 AM | | PASS |
|
|
WIP on condos. Site utilities and parking lot/stormwater drainage were existing. Vertical construction in progress. No muddy runoff or issues at site. No corrections. 4 seperate permits for the 4 buildings.
|
ESC15-00688
| General Inspection | 12/16/2015 | 12/16/2015 | 12/16/2015 9:49:55 AM | | PASS |
|
|
WIP on condos. Site utilities and parking lot/stormwater drainage were existing. Vertical construction in progress. No muddy runoff or issues at site. No corrections. 4 seperate permits for the 4 buildings.
|
ESC15-00744
| Aging Inspection | 12/16/2015 | 12/16/2015 | 12/16/2015 8:57:44 AM | | PASS |
|
|
|
ESC15-00701
| General Inspection | 12/16/2015 | 12/16/2015 | 12/16/2015 8:37:23 AM | | PASS |
|
|
|