ESC13-00193
| General Inspection | 12/18/2014 | 12/18/2014 | 12/18/2014 3:45:40 PM | | PART |
|
|
Perimeter BMPs and overall conditions at upper section of Somerset 3 is in compliance. No discharges or sediment runoff offsite.
1 violation & issue observed: Concrete contractor washed out in old pit, slurry and water has trickled down hill beyond pit and underneath the retaining - exposing an issue about the drainage there that could undermine the retaining wall.
Correction:
-Clean up concrete washout waste. - Improve and line new washout pit or decommision. - Fix retaining wall issue
|
ESC11-00879
| General Inspection | 12/18/2014 | 12/18/2014 | 12/18/2014 3:21:22 PM | | PASS |
|
|
Perimeter BMPs and drop inlet protection are properly installed and effective. No trackout from open lots, no offsite discharges, and no hillside erosion observed. Approved. Open lots are not stabilized and are to be developed. Permit will remain open.
|
ESC13-00806
| General Inspection | 12/18/2014 | 12/18/2014 | 12/18/2014 3:10:57 PM | | PASS |
|
|
No activitiy. Silt fence perimeter installed and no breaches or hillside erosion observed. Construction entrance is still blocked; no activity on BLD since November. No corrections required.
|
ESC13-00918
| General Inspection | 12/18/2014 | 12/18/2014 | 12/18/2014 3:09:52 PM | | PASS |
|
|
No new stockpiling activitiies or issues. Some sections of silt fence have become untrenched, but since site no longer in use there are no issues. No hillside erosion observed.
|
ESC14-00008
| DOC - Permit Finaled | 12/18/2014 | 12/18/2014 | 12/18/2014 2:52:05 PM | P | PASS |
|
|
Construction complete. Yard landscaped/stabilized. No loose sediment or building materials on site. ESC permit conditions satisfied; finaled.
|
ESC14-00418
| General Inspection | 12/18/2014 | 12/18/2014 | 12/18/2014 2:22:47 PM | | PASS |
|
|
Home is now occupied by builder. Landscaping and revegetation is in progress. Perimeter sediment containment still installed. No corrections at this time.
|
ESC14-01028
| Site Preparation | 12/18/2014 | 12/18/2014 | 12/18/2014 12:39:29 PM | P | PASS |
|
|
Clint Phone #: ###-####
Permit posted, East Valley storm drains protected and lined washout is provided. Approved.
|
ESC14-01083
| Random Inspection | 12/18/2014 | 12/18/2014 | 12/18/2014 12:14:59 PM | P | PASS |
|
|
Dewatering operations are complete and settling ponds have been filled in and compacted. No major activity currently at site, no trackout or discharges observed.
The offsite utility project also appears to be near completion.
Approved.
|
ESC13-01247
| General Inspection | 12/18/2014 | 12/18/2014 | 12/18/2014 12:06:55 PM | | PASS |
|
|
Slope still stabilizing and BMPs still installed. No activity. Site is complete, but in sensitive hillside drainage area. Reduce inspection activity until spring and during high runoff to check performance of vegetation to prevent erosion.
|
ESC12-00403
| General Inspection | 12/17/2014 | 12/18/2014 | 12/18/2014 11:48:02 AM | A | PASS |
|
|
JUMP project ongoing. Cement trucks pouring foundation for Simplot HQ building currently. Designated washout area is being used. New construction entrance/exit ramp has been built on Mytrle. No trackout issues.
Perimeter streets and gutters are free of significant amounts of construction related sediment. Dewaterining is ongoing into the MS4 on 9th street, Strata is taking turbidity samples and submitting them to ACHD. No violations of limits reported.
Approved, no corrections at this time.
|
ESC14-00212
| Random Inspection | 12/18/2014 | 12/18/2014 | 12/18/2014 11:16:30 AM | P | PASS |
|
|
General site dewatering is still in progress as well drainage water in the DD3 ditch.
Discharge from end of pipe is very clear and is dissipated by straw bale chute thus prevent stirring up dirt. Downstream ditch water is clear as well.
No other violations observed, but will need to sweep Lusk once the street is patched over. Drop inlet has filter bag protection.
|
ESC14-00094
| General Inspection | 12/18/2014 | 12/18/2014 | 12/18/2014 11:04:11 AM | | PASS |
|
|
Project currently inactive but not complete. Disturbed bank where dock/viewing deck will be installed is blocked off from rest of pond with sand bag barrier. No corrections
|
ESC14-00363
| Aging Inspection | 12/18/2014 | 12/18/2014 | 12/18/2014 10:48:11 AM | | PASS |
|
|
Project complete. ESC conditions satisifed.
|
ESC14-00363
| DOC - Permit Finaled | 12/18/2014 | 12/18/2014 | 12/18/2014 10:47:29 AM | P | PASS |
|
|
|
ESC14-01140
| Site Preparation | 12/17/2014 | 12/18/2014 | 12/18/2014 10:34:57 AM | A | PASS |
|
|
Bobby Phone #: ###-####
Permit posted. Lot is ready for construction.
Need to designate a construction entrance area to prevent trackout.
No stormdrain in vicinity and flat terrain, will just need to keep up on housekeeping and sweeping sidewalks.
|
ESC14-01144
| Site Preparation | 12/17/2014 | 12/18/2014 | 12/18/2014 10:33:04 AM | A | PART |
|
|
Bobby Phone #: ###-####
Need to install perimeter wattle or fencing to prevent trackout by vehicles and foot traffic. Smooth edge curbing and no obstacles will encourage access lot every where.
Permit posted. Construction not yet started. Bobby will install an appropriate BMP.
|
ESC13-00930
| General Inspection | 12/18/2014 | 12/18/2014 | 12/18/2014 9:29:20 AM | | PASS |
|
|
|
ESC13-00213
| General Inspection | 12/18/2014 | 12/18/2014 | 12/18/2014 8:24:12 AM | | CANC |
|
|
site is still shut down
|