Inspections for the day of: Thursday, December 18, 2014.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00193 General Inspection12/18/201412/18/201412/18/2014 3:45:40 PM PART
Perimeter BMPs and overall conditions at upper section of Somerset 3 is in compliance. No discharges or sediment runoff offsite.

1 violation & issue observed:
Concrete contractor washed out in old pit, slurry and water has trickled down hill beyond pit and underneath the retaining - exposing an issue about the drainage there that could undermine the retaining wall.

Correction:

-Clean up concrete washout waste.
- Improve and line new washout pit or decommision.
- Fix retaining wall issue
ESC11-00879 General Inspection12/18/201412/18/201412/18/2014 3:21:22 PM PASS
Perimeter BMPs and drop inlet protection are properly installed and effective. No trackout from open lots, no offsite discharges, and no hillside erosion observed. Approved. Open lots are not stabilized and are to be developed. Permit will remain open.
ESC13-00806 General Inspection12/18/201412/18/201412/18/2014 3:10:57 PM PASS
No activitiy. Silt fence perimeter installed and no breaches or hillside erosion observed. Construction entrance is still blocked; no activity on BLD since November. No corrections required.
ESC13-00918 General Inspection12/18/201412/18/201412/18/2014 3:09:52 PM PASS
No new stockpiling activitiies or issues. Some sections of silt fence have become untrenched, but since site no longer in use there are no issues. No hillside erosion observed.
ESC14-00008 DOC - Permit Finaled12/18/201412/18/201412/18/2014 2:52:05 PMPPASS
Construction complete. Yard landscaped/stabilized. No loose sediment or building materials on site. ESC permit conditions satisfied; finaled.
ESC14-00418 General Inspection12/18/201412/18/201412/18/2014 2:22:47 PM PASS
Home is now occupied by builder. Landscaping and revegetation is in progress. Perimeter sediment containment still installed. No corrections at this time.
ESC14-01028 Site Preparation12/18/201412/18/201412/18/2014 12:39:29 PMPPASS
Clint Phone #: ###-####

Permit posted, East Valley storm drains protected and lined washout is provided. Approved.
ESC14-01083 Random Inspection12/18/201412/18/201412/18/2014 12:14:59 PMPPASS
Dewatering operations are complete and settling ponds have been filled in and compacted. No major activity currently at site, no trackout or discharges observed.

The offsite utility project also appears to be near completion.

Approved.
ESC13-01247 General Inspection12/18/201412/18/201412/18/2014 12:06:55 PM PASS
Slope still stabilizing and BMPs still installed. No activity. Site is complete, but in sensitive hillside drainage area. Reduce inspection activity until spring and during high runoff to check performance of vegetation to prevent erosion.
ESC12-00403 General Inspection12/17/201412/18/201412/18/2014 11:48:02 AMAPASS
JUMP project ongoing. Cement trucks pouring foundation for Simplot HQ building currently. Designated washout area is being used. New construction entrance/exit ramp has been built on Mytrle. No trackout issues.

Perimeter streets and gutters are free of significant amounts of construction related sediment. Dewaterining is ongoing into the MS4 on 9th street, Strata is taking turbidity samples and submitting them to ACHD. No violations of limits reported.

Approved, no corrections at this time.
ESC14-00212 Random Inspection12/18/201412/18/201412/18/2014 11:16:30 AMPPASS
General site dewatering is still in progress as well drainage water in the DD3 ditch.

Discharge from end of pipe is very clear and is dissipated by straw bale chute thus prevent stirring up dirt. Downstream ditch water is clear as well.

No other violations observed, but will need to sweep Lusk once the street is patched over. Drop inlet has filter bag protection.
ESC14-00094 General Inspection12/18/201412/18/201412/18/2014 11:04:11 AM PASS
Project currently inactive but not complete. Disturbed bank where dock/viewing deck will be installed is blocked off from rest of pond with sand bag barrier. No corrections
ESC14-00363 Aging Inspection12/18/201412/18/201412/18/2014 10:48:11 AM PASS
Project complete. ESC conditions satisifed.
ESC14-00363 DOC - Permit Finaled12/18/201412/18/201412/18/2014 10:47:29 AMPPASS
ESC14-01140 Site Preparation12/17/201412/18/201412/18/2014 10:34:57 AMAPASS
Bobby Phone #: ###-####

Permit posted. Lot is ready for construction.

Need to designate a construction entrance area to prevent trackout.

No stormdrain in vicinity and flat terrain, will just need to keep up on housekeeping and sweeping sidewalks.
ESC14-01144 Site Preparation12/17/201412/18/201412/18/2014 10:33:04 AMAPART
Bobby Phone #: ###-####

Need to install perimeter wattle or fencing to prevent trackout by vehicles and foot traffic. Smooth edge curbing and no obstacles will encourage access lot every where.

Permit posted. Construction not yet started. Bobby will install an appropriate BMP.
ESC13-00930 General Inspection12/18/201412/18/201412/18/2014 9:29:20 AM PASS
ESC13-00213 General Inspection12/18/201412/18/201412/18/2014 8:24:12 AM CANC
site is still shut down