Inspections for the day of: Friday, December 18, 2015.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00771 Aging Inspection12/18/201512/18/201512/22/2015 10:10:58 AM CANC
ESC15-01482 Site Preparation12/18/201512/18/201512/18/2015 4:51:15 PMPPASS
ESC15-00729 General Inspection12/18/201512/18/201512/18/2015 4:41:43 PMPFAIL
Inspected area of work on Council Springs Creek where culvert for fire access road creek crossing is being installed. No construction activity occuring at time of inspection, site shut down due to wet conditions.

-Observed turbid water flowing in the creek channel approximately 1/4 mile below construction. Water seems to filter out in the biofiltration drainage area and culvert before flowing though Harris Ranch sub. Flow above construction is area is not clear but significantly less turbid than passing through construction area, indicating lack of BMPs or failure.

- The silt fence installed across the stream channel meant to retain and filter water is uprooted and turbid water is flowing downstream. Improper use of silt fence BMP. Checkdam with filter fabric should be utilized in combination with the existing SF - removing now will cause trapped silt to pass downstream.

-Another source of sediment is from the runoff coming down graded hillside and access road is flowing into creek water holding area (damned by silt fence mentioned above) and mixing with the stream flow. There are no BMPs to capture or slow this runoff into the creek holding pond.
Positives:
Above stream the coffer dam and stream diversion are working well and water coming out the pipe into the muddy holding pond is relatively clear. Along the creek banks where the road is being widened sediment control BMPs and stream bank buffer are effective and not damaged.

Correction:
- Install wattles, silt fence, and rock check dams around area of work to complete. Consider diversion of runoff from the road and graded area with a berm and directiong it down the road instead of into creek.

RP Chad and Syman supervisor Andy were notified. Crews were sent to site to begin work. Rock will be ordered and checkdams installed ASAP but probably not today.

Snowmelt runoff and forecasted wet conditions make this an immediate priority.

ESC15-00721 General Inspection12/18/201512/18/201512/18/2015 3:52:15 PM PASS
ESC15-01283 Tracking Control12/18/201512/18/201512/18/2015 3:44:21 PMPFAIL
significant trackout, no site prep inspection, minimal BMPs
ESC15-00260 General Inspection12/18/201512/18/201512/18/2015 3:04:07 PM CANC
rescheduled for site final
ESC15-00852 Aging Inspection12/18/201512/18/201512/18/2015 2:35:57 PM PASS
Demo complete. ESC permit conditions satisfied. All permits finaled.
ESC15-00852 DOC - Permit Finaled12/18/201512/18/201512/18/2015 2:35:30 PMPPASS
ESC15-00733 General Inspection12/18/201512/18/201512/18/2015 2:26:55 PM PASS
WIP. Minimal exterior disturbance. No prohibited discharges observed.
ESC15-00732 General Inspection12/18/201512/18/201512/18/2015 2:24:33 PM PASS
WIP. Minimal exterior disturbance. No prohibited discharges observed.
ESC15-00477 General Inspection12/18/201512/18/201512/18/2015 2:09:24 PM PASS
Home construction complete. Site is landscaped and stabilized currently and a hillside bond has been issued to guarantee hillside stabilzation. Street and sidewalk have been cleaned, no loose dirt or materials on site.

Temp BMP DI bag shall stay installed during construction of adjacent home. Approved.
ESC15-00477 DOC - Permit Finaled12/18/201512/18/201512/18/2015 2:07:59 PMPPASS
ESC15-01061 Tracking Control12/16/201512/18/201512/18/2015 2:05:33 PMPPASS
Street and sidewalk were swept as requested. DI bag is installed and capturing sediment and filtering runoff.

No activity in mud. Silt fence installed is trenched properly and damaged sections removed. Approved.
ESC14-00886 General Inspection12/17/201512/18/201512/18/2015 1:59:28 PMAPASS
No trackout from site due to rock entrance, permit sign posted, and clearing limits are well observed. Additional wattles were installed to treat/slow runoff from within site to the left of the access drive as requested during site prep. No corrections at this time. WIP.
ESC15-00852 DOC - Permit Finaled12/18/201512/18/201512/18/2015 12:57:21 PMPPASS
ESC15-00985 General Inspection12/18/201512/18/201512/18/2015 11:00:29 AMAPASS
WIP. No prohibited discharges or trackout observed. See also ESC15-00934 for coverage on Payette Brewing Co. project.
ESC15-00934 General Inspection12/18/201512/18/201512/18/2015 11:00:02 AMPPASS
WIP. No prohibited discharges or trackout observed. See also ESC15-00985 for coverage on Payette Brewing Co. project.
ESC15-01068 Complaint Inspection12/18/201512/18/201512/18/2015 10:58:01 AMAFAIL
Complaint of muddy site received by Code Enforcement hotline...


Inspection observations:
- Flat infill lot, 4 SFHs same builder
- Concrete just poured probably yesterday. Excavated dirt for backfill is next to sidewalk. Very wet mud, some runoff and clods on sidewalk going to gutter.
- Looks like concrete truck or pump crane leaked some fuel and there is a sheen on roadway and runoff..
- Receiving DI is 1 block to the west on Palouse and Hervey. No DI bag installed.
- Permit signs are posted.

Corrections:
- sweep sidewalk, provide stockpile buffer strip so no soil is on sidewalk. Install wattle as necessary
- put spill absorbant on spill in road in front of project

Verbal CN issued to RP-GC Aaron Mcgee

RP stated he will be onsite with spill absorbant and broom ASAP this afternoon and will check in
ESC15-01285 General Inspection12/18/201512/18/201512/18/2015 10:42:18 AMAPASS
WIP on bricklaying for path. No uncontained stockpiles or materials. No muddy runoff. Section between Greenbelt and parking lot is complete. Parking lot storm drain receiving runoff from surrounding paved areas has inlet protection. No corrections issued at this time.
ESC15-00942 General Inspection12/18/201512/18/201512/18/2015 9:56:53 AMPPASS
WIP on vertical construction at River Street Storage. Site perimeter is surrounded by structural sediment barriers in the form of curbing and sidewalk(some new some existing). Disturbed area surrounded by security fence to control access. Staging area is being shared in parking lot of Pioneer where Payette Brewing project is underway.

No trackout. No muddy discharges. MS4 on River and 13th has sediment filter bag. Yellow permit sign posted. Site is well kept. No corrections at this time.
ESC15-00731 General Inspection12/18/201512/18/201512/18/2015 8:51:50 AM PASS
ESC14-00886 Site Preparation12/17/201512/18/201512/17/2015 3:52:42 PMPCANC