Inspections for the day of: Monday, December 18, 2017.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00842 General Inspection12/18/201712/18/201712/21/2017 11:52:21 AMPPART
Corrections neeeded:

-sweep street
- remove sandbag check dam and accumulated material out of gutter just downhill from site
- make plan for temporary and/or permanent stabilization and perimeter control wattles.

- access driveway on top of culdesac has potential for erosion and sediment runoff unless additional controls are installed.

No spills, discharges, or loose trash laying around site.
ESC17-00954 Tracking Control12/18/201712/18/201712/18/2017 12:25:19 PMPPEND
WIP on earth work/mass grading of parcels in Win Hollow. Should be complete this week. Rock entrance has been pushed into mud or removed, only short strip of heavy duty rock remains. Some trackout and mud in street on exit lane from subdivions

Street sweeper should be scheduled. Will check on conditions at end of day tomorrow.
ESC17-00693 Random Inspection12/18/201712/18/201712/18/2017 12:02:04 PMPPASS
Permit sign posted. No significant trackout. Perimeter sediment control wattles installed.
ESC15-00541 General Inspection12/18/201712/18/201712/18/2017 11:50:17 AM PASS
No new SFHs under construction. Most DI bags have been pull, common areas vegetated. 3 open lots remain. DI bags still installed on section of Paso Fino
ESC16-01582 General Inspection12/18/201712/18/201712/18/2017 11:48:48 AM PASS
ESC17-00526 General Inspection12/18/201712/18/201712/18/2017 11:27:47 AMPPASS
WIP on new restrooms. Site is fenced in and has wattles installed on south limit of disturbance. Staging area is clean and free of spills. No violations observed.
ESC17-01132 Random Inspection12/18/201712/18/201712/18/2017 11:16:58 AMAPASS
WIP on site work. Construction entrance installed and in good condition, no trackout. Perimter BMPs installed, no issues observed, no corrections requested.
ESC15-00976 General Inspection12/18/201712/18/201712/18/2017 11:08:58 AM PASS
WIP on east sction of Idaho Street townhomes. No trackout or discharges. Trash contained, concrete washout pit on site. Approved.
ESC17-00012 Site Final12/18/201712/18/201712/18/2017 11:00:27 AMANR
Construction complete. Parking lot area landscaped, stabilized and cleaned.

Correction needed for site final:
- remove temporary sediment bag from storm drain on 16th & Jefferson.
ESC17-00126 Site Final12/18/201712/18/201712/18/2017 10:59:24 AMAPASS
Work complete, site landscped stabilized. ESC permit conditions satisfied.