ESC19-00861
| Tracking Control | 12/16/2019 | 12/18/2019 | 12/20/2019 4:00:58 PM | P | PASS |
|
|
Construction entrance extended and more rock placed. Still some trackout. Need to clean up clods out of road.
|
ESC18-00844
| General Inspection | 12/18/2019 | 12/18/2019 | 12/19/2019 1:02:31 PM | | CANC |
|
|
|
ESC19-00356
| General Inspection | 12/18/2019 | 12/18/2019 | 12/19/2019 12:55:46 PM | | CANC |
|
|
|
ESC19-00203
| Conference | 12/17/2019 | 12/18/2019 | 12/18/2019 12:41:52 PM | P | DONE |
|
|
RP notified that crew will be cleaning the sidewalk and gutter on Denton in front of the site today. Silt fence was not trenched due to frozen ground. Fencing will more be used to control access along the perimeter. A runoff retention berm has been placed behind the silt fencing inside the site.
L2 who did the sewer work in the ROW needs to come back and sweep up and clean gutters. Notified ACHD.
Follow up inspection scheduled
|
ESC19-00372
| General Inspection | 12/18/2019 | 12/18/2019 | 12/18/2019 8:12:22 AM | | CANC |
|
|
rescheduled for site final
|
ESC19-00394
| General Inspection | 12/18/2019 | 12/18/2019 | 12/18/2019 8:11:23 AM | | CANC |
|
|
rescheduled for site final
|
ESC19-00494
| BMP Violation | 12/17/2019 | 12/18/2019 | 12/17/2019 4:43:44 PM | P | PEND |
|
|
notified Kenny with Sterling homes about corrections needed. Rescheduled for Friday
|
ESC19-00160
| BMP Violation | 12/17/2019 | 12/18/2019 | 12/17/2019 4:43:29 PM | A | PEND |
|
|
notified Kenny with Sterling homes about corrections needed. Rescheduled for Friday
|
ESC19-00303
| Conference | 12/17/2019 | 12/18/2019 | 12/17/2019 4:42:02 PM | A | DONE |
|
|
Knife River to clean up.
Working with Idaho Power to have joint trench subcontractors follow site ESC requirements. Crew onsite is track utilities and they are driving around the track pad and have not swept the road.
|