PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Friday, December 2, 2016
.
Number of inspections:
29
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC16-00692
General Inspection
12/2/2016
12/2/2016
12/2/2016 4:46:09 PM
CANC
ESC16-00675
Aging Inspection
12/2/2016
12/2/2016
12/2/2016 4:34:19 PM
PASS
Demolition complete, new SFH in progress. Covered under ESC16-00862
ESC16-00675
DOC - Permit Finaled
12/2/2016
12/2/2016
12/2/2016 4:33:09 PM
P
PASS
ESC16-00736
Site Final
12/2/2016
12/2/2016
12/2/2016 4:29:05 PM
P
PASS
Paving and stormwater management project complete. No disturbed area or loose construciton materials on site. No temporary BMPs remain installed. ESC permit conditions satisfied.
ESC16-01435
Site Preparation
12/2/2016
12/2/2016
12/2/2016 4:24:22 PM
P
PASS
Shawn Phone #: ###-####
Permit sign posted in front yard. Project occuring within flat vegetated backyard. No nearyby MS4. Reviewed house keeping BMPs with RP-GC. Approved for construction.
ESC16-01470
Site Final
12/1/2016
12/2/2016
12/2/2016 3:21:38 PM
A
PASS
Gerrie Phone #: ###-####
No ESC corrections or permit condtions unsatisfied. No further ESC inspecitons required, BLD open, ESC finaled.
ESC15-01060
General Inspection
12/2/2016
12/2/2016
12/2/2016 3:21:14 PM
CANC
rescheduled for site final
ESC16-00681
DOC - Permit Finaled
12/2/2016
12/2/2016
12/2/2016 2:48:50 PM
P
PASS
ESC16-00625
General Inspection
12/2/2016
12/2/2016
12/2/2016 1:43:56 PM
PEND
No activity at site since prior inspection. No sediment runoff or erosion observed. Refering site to PW Hillside due to large exposed cut in hill below existing house.
ESC16-00088
General Inspection
12/2/2016
12/2/2016
12/2/2016 1:32:57 PM
PASS
Pool installed. No disturbed area in site. Work area surrounding by vegetated backyard. No ESC corrections needed. ESC condtions satisfied.
ESC16-00088
DOC - Permit Finaled
12/2/2016
12/2/2016
12/2/2016 1:32:14 PM
P
PASS
ESC14-00588
General Inspection
12/2/2016
12/2/2016
12/2/2016 1:22:56 PM
PASS
ESC16-00680
General Inspection
12/2/2016
12/2/2016
12/2/2016 1:18:42 PM
PASS
Construction complete, no disturbed area or loose material on or around site. No temporary BMPs still installed. ESC permit finaled. BLD passed final inspection, but still in "issued" status
ESC16-00680
DOC - Permit Finaled
12/2/2016
12/2/2016
12/2/2016 1:17:25 PM
P
PASS
ESC16-01436
Site Preparation
12/2/2016
12/2/2016
12/2/2016 12:47:16 PM
P
PASS
John Phone #: ###-####
ESC permit sign posted. Construction access will be from the north at end of Barnside @ Shadywood per agreement with developer/parcel owners.
Active project in compliance. Approved for construction. Yellow permit sign posted.
ESC16-01401
General Inspection
12/2/2016
12/2/2016
12/2/2016 12:24:26 PM
P
PART
WIP on foundation. No concrete washout pit used
Correction:
- clean around storm drain inlet and install new sediment protection filter mat or bag
ESC16-00713
General Inspection
12/2/2016
12/2/2016
12/2/2016 12:14:58 PM
P
PASS
WIP on frame and interior. Yellow permit sign posted. NO trackout or discharges from site. No erosion rills or sediment runoff points observed. Rock retaining wall now installed. No corrections requested.
ESC16-00683
General Inspection
12/2/2016
12/2/2016
12/2/2016 12:03:45 PM
PASS
Home construction complete and yard is landscaped. Section of wattle along Windsong okay to remain installed. Common area and path to be hydroseeded/inspected under BH#6 permit ESC15-00094
Need to clean dirt/mud around storm drains on culdesac. Ok to leave filter mats installed due to active construction.
ESC16-01259
Site Preparation
12/1/2016
12/2/2016
12/2/2016 11:36:36 AM
A
PASS
Anel ###-####
Foothills SFH exterior TI. Deck addition within vegetated and fencred backyard. BMP will be to maintain existing vegetation around work area. Access to work site via sideyard. RP stated concrete will have to be wheel barrowed in. No heavy equipment access needed per GC. Homeowner RP.
Reviewed ESC permit requirements. Approved.
ESC16-00873
Site Final
12/1/2016
12/2/2016
12/2/2016 10:44:06 AM
A
PASS
Home complete and landscaped. No corrections needed. RP/GC in process of getting permits for demolition behind home and new subdivison development. Will install DI protection across the street on MS4
ESC16-00874
Site Final
12/1/2016
12/2/2016
12/2/2016 10:43:46 AM
A
PASS
10 AM
Home complete and landscaped. No corrections needed. RP/GC in process of getting permits for demolition behind home and new subdivison development. Will install DI protection across the street on MS4
ESC15-00306
General Inspection
12/2/2016
12/2/2016
12/2/2016 9:24:25 AM
PASS
ESC16-00604
Aging Inspection
12/2/2016
12/2/2016
12/2/2016 9:03:46 AM
PASS
Project complete. All permits finaled. No ESC corrections.
ESC16-00604
DOC - Permit Finaled
12/2/2016
12/2/2016
12/2/2016 9:03:18 AM
P
PASS
ESC16-00686
Aging Inspection
12/2/2016
12/2/2016
12/2/2016 8:08:22 AM
PASS
Project complete. All permits finaled. No ESC corrections
ESC16-00644
Aging Inspection
12/2/2016
12/2/2016
12/2/2016 8:07:35 AM
CANC
ESC15-00871
General Inspection
12/2/2016
12/2/2016
12/2/2016 8:06:58 AM
CANC
rescheduled for site final
ESC16-00686
DOC - Permit Finaled
12/2/2016
12/2/2016
12/2/2016 8:02:52 AM
P
PASS
ESC16-00687
Aging Inspection
12/2/2016
12/2/2016
12/2/2016 8:01:33 AM
CANC