Inspections for the day of: Friday, December 21, 2018.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS18-00472 ESC-Conference12/20/201812/21/201812/24/2018 11:49:54 AMPCANC
inspection 12/24
ESC18-00087 Site Final12/21/201812/21/201812/24/2018 11:45:55 AMPPASS
ESC16-01472 General Inspection12/14/201812/21/201812/24/2018 11:45:39 AMACANC
ESC18-01235 Tracking Control12/21/201812/21/201812/21/2018 3:32:30 PMPPASS
Trackout has been cleaned up. Site entrance rock has been refreshed and is currently gated off.
ESC17-01595 General Inspection12/21/201812/21/201812/21/2018 3:03:57 PM PART
RP onsite. WIP on excavation and haul off of material. Lots of material has veen removed, sidewalk and dirt between curb and sidewalk is muddy and wet.

RP will repair section of silt fence and clean side walk and gutter at end of the day. Sediment check bags in gutter are capturin dirt and mud in gutter in front of project.
ESC18-01687 Site Preparation12/21/201812/21/201812/21/2018 2:12:33 PMAPASS
RP Morgan and Jerry

Permit sign posted with CGP NOI information included. Storm drain inlet on Mtn. Cove in front of staging area has sediment filter bag and wattle protection.

First phase with the north side (hillside) bowl excavation, site will be conducted in phases to limit disturbance. No export of material until second phase, at that time the rock construction entrance Shaw Mtn and Reserve will be installed.

Approved for construction.
ESC18-00180 General Inspection12/21/201812/21/201812/21/2018 1:54:16 PM PEND
corrections in progress, site has multiple permits. No trackout. Need new south entrance or close gate.
ESC18-00440 General Inspection12/21/201812/21/201812/21/2018 12:30:24 PM CANC
ESC17-01755 General Inspection12/21/201812/21/201812/21/2018 12:29:40 PM FAIL
Corrections needed before end of next week:

- install rock construciton entrance. Push old rock back, install new lining and fresh angular rock with as much length and width possible.
- finish process of rock placement along Hudson for worker parking.
- change out DI bags on Hudson.
- sweeper needs to include Federal Way southeast bound (toward broadway) to clean up shoulder and gutter.

Verbal corrections to RP JC. Some changes have been made and Hudson scraped back, but there is a lot of mud on Hudson and alomst to Targee.
ESC18-00184 General Inspection12/21/201812/21/201812/21/2018 12:29:11 PM CANC
ESC16-01253 General Inspection12/21/201812/21/201812/21/2018 12:29:00 PM CANC
ESC18-01266 Tracking Control12/21/201812/21/201812/21/2018 12:28:28 PMPFAIL
Trackout from muddy area behind home toward Emerald.

Correction request to block off alley to prevent parking in mud, notifiy subcontractrors to avoid mud as much as possible. Park on the street.

Follow up scheduled. Verbal correction to George with Westminster Homes..
ESC17-01754 Tracking Control12/21/201812/21/201812/21/2018 12:26:28 PMAFAIL
Corrections needed before end of next week:

- install rock construciton entrance. Push old rock back, install new lining and fresh angular rock with as much length and width possible.
- finish process of rock placement along Hudson for worker parking.
- change out DI bags on Hudson.
- sweeper needs to include Federal Way southeast bound (toward broadway) to clean up shoulder and gutter.

Verbal corrections to RP JC. Some changes have been made and Hudson scraped back, but there is a lot of mud on Hudson and alomst to Targee.
ESC18-00087 Aging Inspection12/21/201812/21/201812/21/2018 8:42:05 AM CANC