Inspections for the day of: Thursday, December 3, 2015.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00477 General Inspection12/3/201512/3/201512/4/2015 3:52:19 PM CANC
ESC13-00213 General Inspection12/3/201512/3/201512/4/2015 3:21:51 PM PASS
No further earthwork or construction. Slopes and retaining wall area are stabilized and vegetated. Onsite stormwater management is complete, no sediment runoff to culdesac. Hillside vegetation bond issued; no further ESC inpsections required.
ESC15-00468 General Inspection12/3/201512/3/201512/4/2015 12:39:07 PM CANC
rescheduled
ESC15-01001 Site Final12/3/201512/3/201512/4/2015 10:51:25 AMPPASS
Ceclie Phone #: ###-####

Parking lot is complete and surface has been swept and is free of loose sediment. New stormwater drainage system is installed and inlet sediment bag has been removed. Some minor landscaping is finishing up in northwest corner.

Note - unfinished parking area to east of project is not is scope of work. There is some muddy runoff to St. Als private system. Cecil will notify them to install sediment controls.
ESC15-01532 Complaint Inspection12/3/201512/3/201512/3/2015 4:57:47 PMPPASS
Flume of turbid discharge into Boise River reported from area of construction at Main Street tunnel.

At time of response, there was no visible plume in the river, though dewatering was still in progress. RP Brent reported that there was a plume but work was stopped until the situation could be rectified. Work is to install a collection well that will remove stormwater and river water from the tunnel in storms or high river levels.

A weir tank has been called into site and will be installed tomorrow AM to add additional treatment. Site stormwater team in process of filing a corrective action report for SWPPP and Notice of Prohibited Discharge for ITD records and CGP reporting.
ESC14-00982 Tracking Control12/2/201512/3/201512/3/2015 4:25:28 PMAPEND
No activity, trenching and paving still on hold due to weather. Road is still dirty but stormwater infrastructure is not complete.

Verbal CN to Biltmore Co. to sweep up street and gutter to east of site, install DI bag on new inlet, and post ESC permit sign.
ESC15-00403 General Inspection12/3/201512/3/201512/3/2015 11:36:16 AM CANC
rescheduled for 12/4
ESC15-01307 Site Preparation12/2/201512/3/201512/3/2015 11:35:22 AMAPASS
Shane Phone #: ###-####

Approved for construction. Site map calls for entire perimeter wattles, wattles only need at edge of pavement along Painted Rock. Somerset Village currently in compliance.
ESC14-01083 General Inspection12/3/201512/3/201512/3/2015 11:25:03 AM CANC
rescheduled for 12/4
ESC15-01377 Site Preparation12/2/201512/3/201512/3/2015 11:17:09 AMAPASS
Jeff Phone #: ###-####

Approved for construction. Low risk site and project. Main BMP will be housekeeping.
ESC15-01246 Tracking Control12/2/201512/3/201512/3/2015 11:09:10 AMPFAIL
check on track out cleanup.

No cleanup of mud clods from trackout. Need to shovel crusty clods prior to scheduled street sweeping.

Final warning issued to CBH before re-inspection fee or escalation.
ESC13-01323 General Inspection12/3/201512/3/201512/3/2015 11:02:39 AM PART
No discharges or trackout from Cantabria.

Discussed corrections to get the ESC permit finaled:
- remove all temporary BMPs:
DI bags on Overland & Cloverdale.
Silt fence in between site and irrigation canal

Reminder to file NOT for CGP as well.

RP Ken stated he will have it done, will check back 12/17
ESC14-00432 Random Inspection12/3/201512/3/201512/3/2015 10:27:14 AMAFAIL
Corrections needed:

1. Check all inlet filter bags. Empty out captured dirt and ice chunks to prevent ripping fabric. DI on Baserri in between Diomi and Blanca is damaged and needs replacement.

2. Have gutters swept. RP needs to be onsite to move employee cars to allow thorough sweeping.

3. Need to provide new designated concrete washout. Current washout on Florida is full.

4. Bank on south side of creek is stabilized. Damaged sections of silt fence no longer in use should be removed.

5. Crew needs to collect litter collected in between subdivision fence and silt fence on north side of creek. Significant amount of litter blown from SFH sites.

There is no trackout or discharges off site from Aralar Park. Most BMPs installed, but need maintenance. Silt fence and vegetated buffers on each side of creek have kept sediment out and preserved bank vegetation.

Hayden Homes RP Tom Lane. CGP (#IDR12EG62) SWPPP needs to be available upon request.


Corrections need to be addressed before Friday 12/4 and completed by end of Monday 12/7. RP stated street sweeping will occur Friday evening after workers are gone. Will check Monday or Tuesday for progress.
ESC15-00654 DOC - Permit Finaled12/3/201512/3/201512/3/2015 10:23:23 AMPPASS
ESC15-00763 Aging Inspection12/3/201512/3/201512/3/2015 8:56:44 AM PASS
Construction complete. No disturbed area or loose sediment on site. Permit conditions satisfied.
ESC15-00763 DOC - Permit Finaled12/3/201512/3/201512/3/2015 8:56:16 AMPPASS
ESC15-00065 General Inspection12/3/201512/3/201512/3/2015 7:51:24 AM CANC
rescheduled for 12/4
ESC12-00403 General Inspection11/27/201512/3/201512/3/2015 7:50:42 AMPCANC
rescheduled for 12/4