Inspections for the day of: Wednesday, February 13, 2019.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01472 General Inspection2/12/20192/13/20192/19/2019 10:19:25 AMPCANC
ESC18-01497 General Inspection2/7/20192/13/20192/19/2019 10:16:25 AMPCANC
ESC17-01088 BMP Violation2/8/20192/13/20192/15/2019 3:52:28 PMAPEND
check on washout and DI bag maintenance request

Developer Chad has arranged to have DI bags maintained. Stated he has notified all builders about the washout violations
ESC18-00184 General Inspection2/13/20192/13/20192/15/2019 3:46:37 PM CANC
ESC18-01782 BMP Violation2/8/20192/13/20192/15/2019 3:46:23 PMAPEND
washout clean up; new washout.

RP Steve stated that his projects in Graywoods will use the washout containment provided by concrete service and/or plastic tub.

Will check on clean up next inspection.
ESC17-01157 General Inspection2/13/20192/13/20192/14/2019 12:53:52 PM CANC
ESC17-01690 Aging Inspection2/13/20192/13/20192/14/2019 8:01:28 AM CANC
ESC18-00115 Aging Inspection2/13/20192/13/20192/14/2019 8:00:47 AM CANC
ESC18-01244 General Inspection2/11/20192/13/20192/13/2019 4:50:16 PMPPEND
No signficant runoff from site, perimeter sediment controls seem to be work and driveway is poured.

Still need to clean up concrete dumped on adjacent site.
ESC18-01433 General Inspection2/13/20192/13/20192/13/2019 4:35:24 PMPFAIL
Muddy runoff channelling and under cutting gatorguard wattles, adding to the overall turbid runoff from Win Hollow.
ESC17-00954 General Inspection2/13/20192/13/20192/13/2019 4:34:26 PMPFAIL
Muddy runoff flowing offsite to sidewalks and gutters. Main source is the access road at end of culdesac that is getting eroded soil from adjacent bank that has a retention berm that has failed.

Water also running down from SFH (ESC18-01433) along construcion entrance and undercutting gator guard wattles.

Water is also channeling parrallel to sidewalk cause erosion and sediment runoff.

Conference needed to discuss BMPs.

Muddy discharge to Crane Creek tracked.
ESC17-00895 Conference2/13/20192/13/20192/13/2019 2:04:27 PMPDONE
new Neighborworks contact info for project:

- Joe 208.941.3904

- Shelly 208.258.6220
ESC19-00086 Site Final2/13/20192/13/20192/13/2019 11:44:00 AMANR
9:45 AM

Need to confirm proper installation of jute matting on between rip rap and greenbelt.