Inspections for the day of: Thursday, February 14, 2019.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00363 General Inspection2/14/20192/14/20192/19/2019 10:27:37 AM CANC
ESC18-00417 Aging Inspection2/14/20192/14/20192/19/2019 10:27:31 AM CANC
ESC17-00954 Conference2/13/20192/14/20192/15/2019 3:56:11 PMAFAIL
Inspection and site conference with RP and the two SFH RPs that are in progress conducted at 10:30. Turbidity sampling conducted at site and at outfall to Crane Creek, tributary to the Boise River.


-Significant Violation: Illicit stormwater discharge due to runoff polluted with eroded sediment. On February 14th at 10:30 AM, turbidity samples taken in gutter directly below site on Winsome were above the measurement level of 1000 NTU. Crane Creek outfall discharge at 170 NTU. Visible plume in Crane Creek from outfall observed on February 13th at 4:00 PM.


-Significant Violation: Uncontained concrete washout dumped and never cleaned on lot 11, pH of runoff from was 10.8 on digital pH monitor.


-Routine Violation: Unmaintained/damaged BMPs on site. Notification given of retention berm damage on February 4th provided to Responsible Person, no effective corrective actions were implemented. No crew or RP onsite Wednesday PM during heavy rain to monitor and address issues.

-Routine Violation: ESC BMPs are not installed per the approved ESC plan

Notice of Violation issued to site. Over 2 hours and two ESC inspectors investigating the site for this inspection.
ESC17-00842 General Inspection2/14/20192/14/20192/15/2019 3:54:58 PMPCANC
ESC16-00406 General Inspection2/14/20192/14/20192/15/2019 3:52:47 PM CANC
ESC18-00311 General Inspection2/14/20192/14/20192/15/2019 3:52:37 PM CANC
ESC18-00946 General Inspection2/12/20192/14/20192/15/2019 3:49:55 PMPPEND
RP-GC was on site 2/14 working on BMPs to prevent discharge. There was some muddy runoff flowing under wattles in a few spots adding to the turbidity in the gutter (315 NTU)

RP has contracted with Gatorguard to install a full set of BMPs including a slope drain to convey water down from upper level to the road without causing additional erosion.


ESC18-01433 Conference2/14/20192/14/20192/15/2019 1:14:45 PMPFAIL
Inspection conducted 10:30 2/14

Muddy runoff coming down large rill parallel to the construction entrance and overtopping and under cutting gatorguard check dams.

Verbal correction request to install check dams to slow water velocity and trap sediment, install silt fence to contain the upper area.

Corrections were started while on site. Follow up inspection scheduled.
ESC18-01455 Conference2/14/20192/14/20192/15/2019 1:12:19 PMPFAIL
see ESC17-00954
ESC18-01244 Conference2/14/20192/14/20192/15/2019 1:11:37 PMPFAIL
Muddy runoff, runoff from uncontained concrete washout dump, and other issues at site.

Need to clean up, schedule removal of the concrete washout ASAP. Install fence on adjacent lot to prevent unauthorized access.

If not completed by end of Month, the site will be issued a SWO.

Verbal correction request to RP-homeowner Brad.
ESC19-00088 DOC - Permit Finaled2/14/20192/14/20192/14/2019 4:28:48 PMPPASS
see ESC18-01432 for ESC permit coverage and inspection activity.
ESC17-01360 General Inspection2/14/20192/14/20192/14/2019 1:36:03 PM CANC