PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Friday, February 14, 2020
.
Number of inspections:
12
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC19-00780
BMP Violation
2/11/2020
2/14/2020
2/20/2020 5:20:54 PM
A
PASS
check for gutter clean up requested on Sherman and 5th
Gutter cleaned. Still needs to improve access to site to prevent trackout. Sidewalk has been swept. RP on duty, said he will continue to work on cleaning. Waiting for backfill to be completed.
ESC19-00371
General Inspection
2/14/2020
2/14/2020
2/14/2020 5:19:59 PM
P
PASS
Additional BMPs added to site in response to preveious rain events and to prepare for forecasted rain and snow.
Added rock check berms/dams to Vortex and graded out the rills. Installed sheeting from Ridge Point pond down to the detention pond to prevent erosion and reduce turbidity of the water in the detention pond. Construciton entrance on Ridge Point has been improved.
No dewatering or pumping occuring. Water coming out the bypass discharge pipe is clear.
No trackout or discharges, no crews onsite at time of inspection.
If dewatering is needed, will need to relocate the dewatering bag. There is some erosion occuring on some steeper sections of the slope where the water flowed over.
Corrections needed:
Need to repair silt fence above the phase 6 stormwater pond, clean up trash and wrappings in the bushes at the bottom of the site.
ESC19-00324
General Inspection
2/14/2020
2/14/2020
2/14/2020 4:52:17 PM
P
PEND
Some additional top of slope diversion berms have been installed. Crew working on sidewalk installation, ecopan onsite.
Lots of loose dirt on subivision streets; silt fence repair/re-installation has not yet occurred. Correctios requested are not complete.
Follow up next week.
ESC19-00402
General Inspection
2/14/2020
2/14/2020
2/14/2020 1:24:30 PM
PASS
Site prepped for driveway. No trackout, perimeter gator guard installed. Workers parking on street.
ESC16-01457
General Inspection
2/14/2020
2/14/2020
2/14/2020 1:12:13 PM
PASS
No recent activity. No new issues. Storm drain sediment bag still installed. Will follow up with owner/RP
ESC19-00514
Aging Inspection
2/14/2020
2/14/2020
2/14/2020 1:03:40 PM
CANC
rescheduled for site final
ESC19-00662
General Inspection
2/14/2020
2/14/2020
2/14/2020 1:02:10 PM
PASS
No ESC requests. Project complete.
ESC19-00662
DOC - Permit Finaled
2/14/2020
2/14/2020
2/14/2020 1:01:45 PM
P
PASS
ESC19-00160
General Inspection
2/14/2020
2/14/2020
2/14/2020 12:52:45 PM
CANC
ESC19-00533
Aging Inspection
2/14/2020
2/14/2020
2/14/2020 12:48:32 PM
CANC
ESC19-00533
DOC - Permit Finaled
2/14/2020
2/14/2020
2/14/2020 12:48:27 PM
P
PASS
ESC19-00667
General Inspection
2/14/2020
2/14/2020
2/14/2020 12:47:58 PM
CANC