Inspections for the day of: Wednesday, February 19, 2020.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-00181 General Inspection2/19/20202/19/20202/19/2020 4:41:43 PMPPASS
Minor trackout to Cloverdale, receiving storm drain has sediment bag installed. Regular sweeper scheduled for Tuesday and Thursday.

Requested that some muddy holes/spots in the parking area have pit run placed on top, which was completed during inspection.

Concrete washout pans onsite, trash contained. Site interior is extremely muddy, but the trackout offsite has been managed. Site has restrictions on access to muddy area and has desigated vehicles that do not exit the muddy areas.
ESC19-00160 General Inspection2/14/20202/19/20202/19/2020 4:39:24 PMAPASS
No new activity. No trackout or other issues currently. Will need to add BMPs for next phase.
ESC19-00839 General Inspection2/19/20202/19/20202/19/2020 3:40:43 PMPPASS
Minor trackout to Cloverdale, receiving storm drain has sediment bag installed. Regular sweeper scheduled for Tuesday and Thursday.

Requested that some muddy holes/spots in the parking area have pit run placed on top, which was completed during inspection.

Concrete washout pans onsite, trash contained. Site interior is extremely muddy, but the trackout offsite has been managed. Site has restrictions on access to muddy area and has desigated vehicles that do not exit the muddy areas.
ESC19-00188 General Inspection2/19/20202/19/20202/19/2020 3:40:33 PM PASS
Minor trackout to Cloverdale, receiving storm drain has sediment bag installed. Regular sweeper scheduled for Tuesday and Thursday.

Requested that some muddy holes/spots in the parking area have pit run placed on top, which was completed during inspection.

Concrete washout pans onsite, trash contained. Site interior is extremely muddy, but the trackout offsite has been managed. Site has restrictions on access to muddy area and has desigated vehicles that do not exit the muddy areas.
ESC19-00187 General Inspection2/19/20202/19/20202/19/2020 3:40:21 PM PASS
Minor trackout to Cloverdale, receiving storm drain has sediment bag installed. Regular sweeper scheduled for Tuesday and Thursday.

Requested that some muddy holes/spots in the parking area have pit run placed on top, which was completed during inspection.

Concrete washout pans onsite, trash contained. Site interior is extremely muddy, but the trackout offsite has been managed. Site has restrictions on access to muddy area and has desigated vehicles that do not exit the muddy areas.
ESC19-00186 General Inspection2/19/20202/19/20202/19/2020 3:40:10 PM PASS
Minor trackout to Cloverdale, receiving storm drain has sediment bag installed. Regular sweeper scheduled for Tuesday and Thursday.

Requested that some muddy holes/spots in the parking area have pit run placed on top, which was completed during inspection.

Concrete washout pans onsite, trash contained. Site interior is extremely muddy, but the trackout offsite has been managed. Site has restrictions on access to muddy area and has desigated vehicles that do not exit the muddy areas.
ESC19-00185 General Inspection2/19/20202/19/20202/19/2020 3:39:57 PM PASS
Minor trackout to Cloverdale, receiving storm drain has sediment bag installed. Regular sweeper scheduled for Tuesday and Thursday.

Requested that some muddy holes/spots in the parking area have pit run placed on top, which was completed during inspection.

Concrete washout pans onsite, trash contained. Site interior is extremely muddy, but the trackout offsite has been managed. Site has restrictions on access to muddy area and has desigated vehicles that do not exit the muddy areas.
ESC19-00184 General Inspection2/19/20202/19/20202/19/2020 3:39:46 PM PASS
Minor trackout to Cloverdale, receiving storm drain has sediment bag installed. Regular sweeper scheduled for Tuesday and Thursday.

Requested that some muddy holes/spots in the parking area have pit run placed on top, which was completed during inspection.

Concrete washout pans onsite, trash contained. Site interior is extremely muddy, but the trackout offsite has been managed. Site has restrictions on access to muddy area and has desigated vehicles that do not exit the muddy areas.
ESC19-00189 General Inspection2/19/20202/19/20202/19/2020 3:39:35 PM PASS
Minor trackout to Cloverdale, receiving storm drain has sediment bag installed. Regular sweeper scheduled for Tuesday and Thursday.

Requested that some muddy holes/spots in the parking area have pit run placed on top, which was completed during inspection.

Concrete washout pans onsite, trash contained. Site interior is extremely muddy, but the trackout offsite has been managed. Site has restrictions on access to muddy area and has desigated vehicles that do not exit the muddy areas.
ESC18-00818 General Inspection2/19/20202/19/20202/19/2020 3:08:15 PM CANC
ESC18-00920 General Inspection2/19/20202/19/20202/19/2020 3:07:27 PM CANC
site is inactive
ESC19-01654 Site Preparation2/19/20202/19/20202/19/2020 3:07:04 PMPPASS
Construciton entrance installed, storm drains on Cloverdale have sediment filter bags installed. Boise permits and CGP are issued.

Will install silt fence after the existing chain link fence is removed and relocated to the east side of this project.

Will start with grading/grubbing next week, and then bring in fill for the site to create the building pad.

Plan is to excavate and line an in-ground concrete washout pit.

Approved for construction.
ESC19-00332 Aging Inspection2/19/20202/19/20202/19/2020 8:16:44 AM CANC
ESC19-00332 DOC - Permit Finaled2/19/20202/19/20202/19/2020 8:16:05 AMPPASS
ESC19-00239 Aging Inspection2/19/20202/19/20202/19/2020 8:14:27 AM CANC
ESC19-00239 DOC - Permit Finaled2/19/20202/19/20202/19/2020 8:14:22 AMPPASS