ESC16-01167 General Inspection2/2/20182/2/20182/5/2018 2:38:20 PM CANC
ESC04-00667 DOC - Permit Finaled2/2/20182/2/20182/2/2018 4:30:36 PMPPASS
ESC17-00053 Site Final2/2/20182/2/20182/2/2018 4:17:03 PMPPASS
Redco''s work is complete at this site as of 12/20/17 Phone #: ###-#### Inspection requested via web by Annie Coates

Homeowner to complete work/stabilization & clean up. No temporary BMPs left around site. ESC permit finaled.
ESC17-00053 DOC - Permit Finaled2/2/20182/2/20182/2/2018 4:15:41 PMPPASS
ESC17-01454 General Inspection2/2/20182/2/20182/2/2018 3:57:21 PMPFAIL
Corrections needed:

- clean up/pick loose trash
- build 4th wall for trash container
- install storm drain sediment protection
- sweep up aprons to lot on Highland and Division

Follow up scheduled 2/8
ESC17-00484 Aging Inspection2/2/20182/2/20182/2/2018 3:55:29 PM PASS
Demo complete. New SFH now in progress, see ESC17-01454
ESC17-00484 DOC - Permit Finaled2/2/20182/2/20182/2/2018 3:55:03 PMPPASS
ESC15-01579 General Inspection1/30/20182/2/20182/2/2018 3:38:33 PMAPASS
Week of trash control has continued to improve site. No loose trash or wrapping around perimter and along path.

Discussed how next week crews will either rake and sweep up white foam bits along the shoulder of Greenbelt. May try lawnmower with bag or leaf blower that can have suction.

NO trackout, spills, or other issues. Will check back next week.
ESC17-00503 General Inspection2/2/20182/2/20182/2/2018 2:54:52 PM PASS
Framing in progress. Trash container onsite, storm drains have sediment protection. Approved
ESC17-00504 General Inspection2/2/20182/2/20182/2/2018 2:54:37 PM PASS
Framing in progress. Trash container onsite, storm drains have sediment protection. Approved
ESC17-00505 General Inspection2/2/20182/2/20182/2/2018 2:54:36 PM PASS
Framing in progress. Trash container onsite, storm drains have sediment protection. Approved
ESC17-01437 Site Preparation2/2/20182/2/20182/2/2018 2:51:04 PMPPASS
Clint Phone #: ###-####

ESC permit sign posted. Receiving storm drain has inlet protection. Will use Blackrock washout located on south side of Warm Springs.
ESC17-01414 General Inspection2/2/20182/2/20182/2/2018 2:44:00 PMPPASS
Landscaping crews onsite doing irrigation lines. Silt fence perimeter installed. No SFHs started yet.
ESC16-00489 General Inspection2/2/20182/2/20182/2/2018 2:43:09 PM PASS
SFHs in progress in phase. Subdivsion BMPs installed. No corrections requested.
ESC17-00510 General Inspection2/2/20182/2/20182/2/2018 11:50:15 AM CANC
ESC17-00357 Aging Inspection2/2/20182/2/20182/2/2018 9:41:32 AM PASS
Home complete, BLD finaled, no ESC corrections.
ESC17-00357 DOC - Permit Finaled2/2/20182/2/20182/2/2018 9:41:10 AMPPASS
ESC16-00989 General Inspection2/2/20182/2/20182/2/2018 9:16:03 AM PASS