ESC17-01680
| General Inspection | 2/21/2018 | 2/21/2018 | 2/23/2018 2:06:27 PM | P | CANC |
|
|
|
ESC17-00410
| Site Final | 2/9/2018 | 2/21/2018 | 2/23/2018 8:27:40 AM | A | CANC |
|
|
check for any remaining DI bags in area and have CBH remove them
reschedule
|
ESC16-00905
| General Inspection | 2/9/2018 | 2/21/2018 | 2/22/2018 10:31:36 AM | A | CANC |
|
|
|
ESC16-01743
| General Inspection | 2/21/2018 | 2/21/2018 | 2/22/2018 10:31:10 AM | | CANC |
|
|
rescheduled
|
ESC16-00973
| Site Final | 2/20/2018 | 2/21/2018 | 2/22/2018 10:31:00 AM | P | CANC |
|
|
|
ESC17-00520
| General Inspection | 2/21/2018 | 2/21/2018 | 2/22/2018 10:00:12 AM | | CANC |
|
|
|
ESC17-00111
| General Inspection | 2/21/2018 | 2/21/2018 | 2/22/2018 10:00:05 AM | | CANC |
|
|
rescheduled
|
ESC16-01650
| General Inspection | 2/21/2018 | 2/21/2018 | 2/21/2018 4:15:43 PM | | CANC |
|
|
|
ESC17-00505
| General Inspection | 2/21/2018 | 2/21/2018 | 2/21/2018 4:07:32 PM | | CANC |
|
|
|
ESC16-01720
| General Inspection | 2/21/2018 | 2/21/2018 | 2/21/2018 3:59:29 PM | P | PEND |
|
|
Work complete.
RP to remove temporary sediment filter bags from storm drains on Capitol, Main, and Idaho Street. Sweep up any dirt collected around inlets. RP currently on leave but will address upon return first week of March.
Site final scheduled March 5th.
|
ESC17-01670
| BMP Violation | 2/21/2018 | 2/21/2018 | 2/21/2018 3:49:52 PM | P | FAIL |
|
|
Correction request issued to Colby with CBH:
- provide designated washout for new homes in Fork South. Currently washing out on the ground on open lot - each home needs trash containment box or dumpster to limit wind blown trash
- notified that CBH will be charge of DI bag maintenance going forward (developer installed upon completion of subdivsion)
Colby noted that Brett Hart will also be RP on this subdivision, he is currently building in Kuna.
Brett- ###-####
|
ESC17-01088
| General Inspection | 2/21/2018 | 2/21/2018 | 2/21/2018 2:38:04 PM | P | PASS |
|
|
Road prepped for paving and curb and gutter. No trackout. WIP on sidewalk along Cloverdale. Trech dug between area and road shoulder, no sediment leaving site. Will check back in two weeks for stockpile stabilization. No requests issued.
|
ESC17-00775
| General Inspection | 2/21/2018 | 2/21/2018 | 2/21/2018 2:14:14 PM | P | PASS |
|
|
Home complete, yard not yet stabilized. Area to be sodded early spring, will need to sweep gutter in front of home on Hiawatha.
|
ESC17-01402
| General Inspection | 2/21/2018 | 2/21/2018 | 2/21/2018 2:04:21 PM | P | FAIL |
|
|
Verbal correction request issued to RP Chris:
- sweep up trackout on common driveway - install new sediment filter bag on storm drain end of driveway on Canonero, the current bag is has large punctures and will not trap sediment.
RP agreed to make corrections, reminded that the DI bag will need to be pulled upon stabilization/completion.
Follow up scheduled 2/28
|
ESC17-01568
| General Inspection | 2/21/2018 | 2/21/2018 | 2/21/2018 2:01:15 PM | P | PASS |
|
|
WIP, permit posted, trash contained. No trackout to Tioga.
|
ESC17-01792
| Site Preparation | 2/21/2018 | 2/21/2018 | 2/21/2018 1:23:53 PM | P | PASS |
|
|
Site walk through with RP Eldon.
Heavy duty rock construction entrance installed, DI protection on south side of Franklin (may be for ITD/ACHD road project per Eldon). No concrete or cement work for project, will be Idaho Power training yard and linemen practice area. Project is to be from February - May/June. Fugitive dust control may be required during import of material and grading.
Approved for construction.
Perimter silt fence properly installed.
|
ESC04-00611
| DOC - Permit Finaled | 2/21/2018 | 2/21/2018 | 2/21/2018 12:32:01 PM | P | PASS |
|
|
|
ESC03-01066
| DOC - Permit Finaled | 2/21/2018 | 2/21/2018 | 2/21/2018 12:31:57 PM | P | PASS |
|
|
|
ESC17-00923
| DOC - Permit Finaled | 2/21/2018 | 2/21/2018 | 2/21/2018 12:31:51 PM | P | PASS |
|
|
|
ESC17-00047
| DOC - Permit Finaled | 2/21/2018 | 2/21/2018 | 2/21/2018 10:15:13 AM | P | PASS |
|
|
|
ESC17-00213
| Aging Inspection | 2/21/2018 | 2/21/2018 | 2/21/2018 9:48:59 AM | | PASS |
|
|
No activity on BLD, no ESC issues. Permit finaled.
|
ESC17-00213
| DOC - Permit Finaled | 2/21/2018 | 2/21/2018 | 2/21/2018 9:47:55 AM | P | PASS |
|
|
|
ESC17-00632
| Aging Inspection | 2/21/2018 | 2/21/2018 | 2/21/2018 9:42:21 AM | | CANC |
|
|
|
ESC17-00510
| Random Inspection | 2/21/2018 | 2/21/2018 | 2/21/2018 9:41:59 AM | P | PASS |
|
|
Grading and excavation in progress. Large stockpiles onsite from digging future pond areas. Currently active, will need to be stabilized or flattened if inactive more than 2 weeks.
No trackout, existing vegetation around perimeter has been preserved and is acting as buffer. Permit sign posted. Approved.
|
ESC15-01354
| DOC - Permit Finaled | 2/21/2018 | 2/21/2018 | 2/21/2018 8:08:14 AM | P | PASS |
|
|
|