Inspections for the day of: Wednesday, February 21, 2018.
Number of inspections: 25
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-01680 General Inspection2/21/20182/21/20182/23/2018 2:06:27 PMPCANC
ESC17-00410 Site Final2/9/20182/21/20182/23/2018 8:27:40 AMACANC
check for any remaining DI bags in area and have CBH remove them

reschedule
ESC16-00905 General Inspection2/9/20182/21/20182/22/2018 10:31:36 AMACANC
ESC16-01743 General Inspection2/21/20182/21/20182/22/2018 10:31:10 AM CANC
rescheduled
ESC16-00973 Site Final2/20/20182/21/20182/22/2018 10:31:00 AMPCANC
ESC17-00520 General Inspection2/21/20182/21/20182/22/2018 10:00:12 AM CANC
ESC17-00111 General Inspection2/21/20182/21/20182/22/2018 10:00:05 AM CANC
rescheduled
ESC16-01650 General Inspection2/21/20182/21/20182/21/2018 4:15:43 PM CANC
ESC17-00505 General Inspection2/21/20182/21/20182/21/2018 4:07:32 PM CANC
ESC16-01720 General Inspection2/21/20182/21/20182/21/2018 3:59:29 PMPPEND
Work complete.


RP to remove temporary sediment filter bags from storm drains on Capitol, Main, and Idaho Street. Sweep up any dirt collected around inlets. RP currently on leave but will address upon return first week of March.

Site final scheduled March 5th.
ESC17-01670 BMP Violation2/21/20182/21/20182/21/2018 3:49:52 PMPFAIL
Correction request issued to Colby with CBH:

- provide designated washout for new homes in Fork South. Currently washing out on the ground on open lot
- each home needs trash containment box or dumpster to limit wind blown trash

- notified that CBH will be charge of DI bag maintenance going forward (developer installed upon completion of subdivsion)

Colby noted that Brett Hart will also be RP on this subdivision, he is currently building in Kuna.

Brett- ###-####
ESC17-01088 General Inspection2/21/20182/21/20182/21/2018 2:38:04 PMPPASS
Road prepped for paving and curb and gutter. No trackout. WIP on sidewalk along Cloverdale. Trech dug between area and road shoulder, no sediment leaving site. Will check back in two weeks for stockpile stabilization. No requests issued.
ESC17-00775 General Inspection2/21/20182/21/20182/21/2018 2:14:14 PMPPASS
Home complete, yard not yet stabilized. Area to be sodded early spring, will need to sweep gutter in front of home on Hiawatha.
ESC17-01402 General Inspection2/21/20182/21/20182/21/2018 2:04:21 PMPFAIL
Verbal correction request issued to RP Chris:

- sweep up trackout on common driveway
- install new sediment filter bag on storm drain end of driveway on Canonero, the current bag is has large punctures and will not trap sediment.

RP agreed to make corrections, reminded that the DI bag will need to be pulled upon stabilization/completion.

Follow up scheduled 2/28
ESC17-01568 General Inspection2/21/20182/21/20182/21/2018 2:01:15 PMPPASS
WIP, permit posted, trash contained. No trackout to Tioga.
ESC17-01792 Site Preparation2/21/20182/21/20182/21/2018 1:23:53 PMPPASS
Site walk through with RP Eldon.

Heavy duty rock construction entrance installed, DI protection on south side of Franklin (may be for ITD/ACHD road project per Eldon). No concrete or cement work for project, will be Idaho Power training yard and linemen practice area. Project is to be from February - May/June. Fugitive dust control may be required during import of material and grading.

Approved for construction.

Perimter silt fence properly installed.
ESC04-00611 DOC - Permit Finaled2/21/20182/21/20182/21/2018 12:32:01 PMPPASS
ESC03-01066 DOC - Permit Finaled2/21/20182/21/20182/21/2018 12:31:57 PMPPASS
ESC17-00923 DOC - Permit Finaled2/21/20182/21/20182/21/2018 12:31:51 PMPPASS
ESC17-00047 DOC - Permit Finaled2/21/20182/21/20182/21/2018 10:15:13 AMPPASS
ESC17-00213 Aging Inspection2/21/20182/21/20182/21/2018 9:48:59 AM PASS
No activity on BLD, no ESC issues. Permit finaled.
ESC17-00213 DOC - Permit Finaled2/21/20182/21/20182/21/2018 9:47:55 AMPPASS
ESC17-00632 Aging Inspection2/21/20182/21/20182/21/2018 9:42:21 AM CANC
ESC17-00510 Random Inspection2/21/20182/21/20182/21/2018 9:41:59 AMPPASS
Grading and excavation in progress. Large stockpiles onsite from digging future pond areas. Currently active, will need to be stabilized or flattened if inactive more than 2 weeks.

No trackout, existing vegetation around perimeter has been preserved and is acting as buffer. Permit sign posted. Approved.
ESC15-01354 DOC - Permit Finaled2/21/20182/21/20182/21/2018 8:08:14 AMPPASS