ESC14-00299
| BMP Violation | 2/19/2016 | 2/23/2016 | 2/24/2016 3:48:19 PM | A | CANC |
|
|
neighbors are receiving erosion from this site
rescheduled.
|
ESC15-00729
| General Inspection | 2/19/2016 | 2/23/2016 | 2/24/2016 3:03:13 PM | A | CANC |
|
|
rescheduled
|
ESC14-00588
| General Inspection | 2/23/2016 | 2/23/2016 | 2/24/2016 2:46:44 PM | | PASS |
|
|
Construction entrance and rumble bars are limiting trackout. No sediment or discharges leaving site. Housekeeping and waste management is in compliance. Approved.
|
ESC15-00403
| General Inspection | 2/23/2016 | 2/23/2016 | 2/24/2016 2:40:14 PM | | PART |
|
|
No activity at site. No discharges or trackout.
Corrections needed at site:
- remove damaged and inoperable silt fence - clean loose trash around site - sweeping parking lot/staging area
Correction issue to Travis with Pinnacle Builders.
|
ESC15-00147
| Site Final | 2/16/2016 | 2/23/2016 | 2/23/2016 3:55:10 PM | A | NR |
|
|
Still need to vegetate and clean up small amount of dirt in front of home.
|
ESC15-01628
| General Inspection | 2/23/2016 | 2/23/2016 | 2/23/2016 3:50:56 PM | P | PASS |
|
|
WIP on frame. No trackout or discharges. Permit sign posted.
|
ESC15-01318
| DOC - Permit Finaled | 2/23/2016 | 2/23/2016 | 2/23/2016 3:49:37 PM | P | PASS |
|
|
Demo complete. Now SFH in progress under ESC15-01628
|
ESC14-00886
| General Inspection | 2/23/2016 | 2/23/2016 | 2/23/2016 3:48:53 PM | | PASS |
|
|
|
ESC15-00591
| Aging Inspection | 2/23/2016 | 2/23/2016 | 2/23/2016 3:31:56 PM | | PASS |
|
|
WIP. Need to complete landscaping and do final clean up. No vehicle or foot trackout. No discharges.
|
ESC15-01635
| Tracking Control | 2/18/2016 | 2/23/2016 | 2/23/2016 1:43:01 PM | A | PASS |
|
|
reinspection
Trackout reported has since been cleaned. Significant activity with daily housekeeping required. Approved.
|
ESC15-01636
| Tracking Control | 2/18/2016 | 2/23/2016 | 2/23/2016 1:42:22 PM | A | PASS |
|
|
reinspection
Trackout reported has since been cleaned. Significant activity with daily housekeeping required. Approved.
|
ESC15-01560
| Site Final | 2/23/2016 | 2/23/2016 | 2/23/2016 1:34:27 PM | P | PASS |
|
|
Street and gutter cleaned thoroughly with broom, shovel, and power wash with water contaiment. No discharge beyond alley border observed. Temp sediment check dams removed.
ESC permit conditions satisfied.
Approved.
|
ESC15-00893
| General Inspection | 2/23/2016 | 2/23/2016 | 2/23/2016 10:55:55 AM | | PART |
|
|
Verbal correction request to Steve with Radix to sweep up Saxton. Will reinspect for compliance 3/3
No other violations
|
ESC15-00894
| General Inspection | 2/23/2016 | 2/23/2016 | 2/23/2016 10:55:25 AM | | PART |
|
|
Verbal CN to Mike with Knife River.
Sweep apron leading to State Street ASAP.
Next week when access road and parking lots behind the store fronts is completed, State Street shoulder shall be swept by street sweeper. Will need to move orange barrels.
RP agreed. Will resinspect 3/3
|
ESC15-01513
| General Inspection | 2/12/2016 | 2/23/2016 | 2/23/2016 10:31:39 AM | P | FAIL |
|
|
Loose dirt, debris, and sawdust leaving site into road and gutter. - porta pot not being serviced
CN posted on window. Clean up loose dirt and debris. Post yellow ESC permit. Do maintenance on DI bag at end of street.
Walker Construction. ###-####
|
ESC16-00039
| BMP Violation | 2/23/2016 | 2/23/2016 | 2/23/2016 10:18:50 AM | P | FAIL |
|
|
Cement washout for Tahoe on north side of Township is full with evidence of spillage.
Correction notice, second request to Paul with Tahoe to prohibit further use (another washout across the street) and clean up.
|
ESC15-00957
| Random Inspection | 2/23/2016 | 2/23/2016 | 2/23/2016 10:15:38 AM | P | PASS |
|
|
Subdivision work complete. SFHs have seperate ESC permits under ZEvan Const. and Tahoe Homes. DIs have inlet protection that has been maintained. No erosion or sediment coming off lots.
Corrections isssued to home builders for housekeeping (trash container/cement washout)
|
ESC16-00108
| BMP Violation | 2/23/2016 | 2/23/2016 | 2/23/2016 9:59:07 AM | P | PART |
|
|
Permit sign posted, no vehicle traciout. Subdivision DIs have inlet protection.
Verbal correction to Matt Sisco with Evans Construction:
1. Sweep sidewalk 2. Provide trash container 3. Pick up loose trash and put in container.
|