Inspections for the day of: Wednesday, February 24, 2016.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-01287 BMP Violation2/24/20162/24/20162/24/2016 4:40:06 PMPPASS
Site has completed corrective actions to come into a good level compliance.

- perimeter wattles now properly installed.
- unauthorized site entance from adjacent lot has been stopped and pit run driveway area installed.
- uncontained trash and materials were removed from site
- street, sidewalk, and gutter were swept. Street sweeper did work on the road.

Adjacent site by same builder also in compliance.

corrections remaining:
- empty out and reinstall DI bag
- pay fees assessed due to multiple failed inspections.

ESC15-00934 General Inspection2/24/20162/24/20162/24/2016 4:16:24 PM PASS
WIP on interior. Parking lot issues were resolved last week. Oil spill was absorbed with floor dry, leaky tractor was removed from site, and the parking lot was swept as requested. DI bags have been emptied and maintained. No new corrections, WIP.
ESC14-00928 Aging Inspection2/24/20162/24/20162/24/2016 4:13:59 PM PASS
Vertical construction in progress. No trackout, discharges, or uncontained material from site. DI bags installed on surrounding MS4. Approved.
ESC15-01224 General Inspection2/24/20162/24/20162/24/2016 2:40:13 PMPPASS
WIP on new Library! at Bown Crossing. Trackout controls and waste management are well maintained and in good condition. Filtering wattles installed in perimeter runoff points within the security fence.

No violations observed. RP Bruce keeping good SWPPP records and performing inspections. Boise PW inspectors/managers monitoring SWPPP activity.

Approved.
ESC15-00764 Aging Inspection2/24/20162/24/20162/24/2016 2:07:01 PM PASS
Home complete and BLD finaled. In process of being landscaped. No further ESC inspections, 2 active SFHs with permits & temp BMPs installed are in progress by Sunrise Development in Tianna Park
ESC15-00764 DOC - Permit Finaled2/24/20162/24/20162/24/2016 2:04:30 PMPPASS
ESC14-00206 General Inspection2/16/20162/24/20162/24/2016 1:16:38 PMPPASS
ESC16-00242 Site Preparation2/24/20162/24/20162/24/2016 1:09:05 PMPCANC
Jerry-call to meet Phone #: ###-####

rescheduled with Jerry for Monday 2/29 @ 10 AM
ESC15-00527 Aging Inspection2/24/20162/24/20162/24/2016 11:37:55 AM PASS
Home complete. Active construction ongoing in Harris Crossing so temp BMPs in sub to remain. ESC conditions satisfied.
ESC15-00527 DOC - Permit Finaled2/24/20162/24/20162/24/2016 11:37:01 AMPPASS
ESC15-00320 General Inspection2/24/20162/24/20162/24/2016 10:23:31 AM PASS
No activity, no violations. Project not complete but is currently inactive.
ESC15-00931 General Inspection2/24/20162/24/20162/24/2016 10:22:21 AM PASS
WIP. No corrections issued.
ESC15-01064 Aging Inspection2/24/20162/24/20162/24/2016 9:15:13 AM PASS
Runway and apron rehab complete. No ESC issues. Permit finaled.
ESC15-01064 DOC - Permit Finaled2/24/20162/24/20162/24/2016 9:14:41 AMPPASS