ESC15-01287
| BMP Violation | 2/24/2016 | 2/24/2016 | 2/24/2016 4:40:06 PM | P | PASS |
|
|
Site has completed corrective actions to come into a good level compliance.
- perimeter wattles now properly installed. - unauthorized site entance from adjacent lot has been stopped and pit run driveway area installed. - uncontained trash and materials were removed from site - street, sidewalk, and gutter were swept. Street sweeper did work on the road.
Adjacent site by same builder also in compliance.
corrections remaining: - empty out and reinstall DI bag - pay fees assessed due to multiple failed inspections.
|
ESC15-00934
| General Inspection | 2/24/2016 | 2/24/2016 | 2/24/2016 4:16:24 PM | | PASS |
|
|
WIP on interior. Parking lot issues were resolved last week. Oil spill was absorbed with floor dry, leaky tractor was removed from site, and the parking lot was swept as requested. DI bags have been emptied and maintained. No new corrections, WIP.
|
ESC14-00928
| Aging Inspection | 2/24/2016 | 2/24/2016 | 2/24/2016 4:13:59 PM | | PASS |
|
|
Vertical construction in progress. No trackout, discharges, or uncontained material from site. DI bags installed on surrounding MS4. Approved.
|
ESC15-01224
| General Inspection | 2/24/2016 | 2/24/2016 | 2/24/2016 2:40:13 PM | P | PASS |
|
|
WIP on new Library! at Bown Crossing. Trackout controls and waste management are well maintained and in good condition. Filtering wattles installed in perimeter runoff points within the security fence.
No violations observed. RP Bruce keeping good SWPPP records and performing inspections. Boise PW inspectors/managers monitoring SWPPP activity.
Approved.
|
ESC15-00764
| Aging Inspection | 2/24/2016 | 2/24/2016 | 2/24/2016 2:07:01 PM | | PASS |
|
|
Home complete and BLD finaled. In process of being landscaped. No further ESC inspections, 2 active SFHs with permits & temp BMPs installed are in progress by Sunrise Development in Tianna Park
|
ESC15-00764
| DOC - Permit Finaled | 2/24/2016 | 2/24/2016 | 2/24/2016 2:04:30 PM | P | PASS |
|
|
|
ESC14-00206
| General Inspection | 2/16/2016 | 2/24/2016 | 2/24/2016 1:16:38 PM | P | PASS |
|
|
|
ESC16-00242
| Site Preparation | 2/24/2016 | 2/24/2016 | 2/24/2016 1:09:05 PM | P | CANC |
|
|
Jerry-call to meet Phone #: ###-####
rescheduled with Jerry for Monday 2/29 @ 10 AM
|
ESC15-00527
| Aging Inspection | 2/24/2016 | 2/24/2016 | 2/24/2016 11:37:55 AM | | PASS |
|
|
Home complete. Active construction ongoing in Harris Crossing so temp BMPs in sub to remain. ESC conditions satisfied.
|
ESC15-00527
| DOC - Permit Finaled | 2/24/2016 | 2/24/2016 | 2/24/2016 11:37:01 AM | P | PASS |
|
|
|
ESC15-00320
| General Inspection | 2/24/2016 | 2/24/2016 | 2/24/2016 10:23:31 AM | | PASS |
|
|
No activity, no violations. Project not complete but is currently inactive.
|
ESC15-00931
| General Inspection | 2/24/2016 | 2/24/2016 | 2/24/2016 10:22:21 AM | | PASS |
|
|
WIP. No corrections issued.
|
ESC15-01064
| Aging Inspection | 2/24/2016 | 2/24/2016 | 2/24/2016 9:15:13 AM | | PASS |
|
|
Runway and apron rehab complete. No ESC issues. Permit finaled.
|
ESC15-01064
| DOC - Permit Finaled | 2/24/2016 | 2/24/2016 | 2/24/2016 9:14:41 AM | P | PASS |
|
|
|