Inspections for the day of: Monday, February 26, 2018.
Number of inspections: 29
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00762 General Inspection2/26/20182/26/20182/27/2018 2:30:31 PM CANC
rescheduled for site final
ESC17-00141 Aging Inspection2/26/20182/26/20182/27/2018 2:04:47 PM PASS
Duplex in progress. ESC permit sign posted, trash contained. No discharges or trackout. Approved.
ESC15-01579 General Inspection2/26/20182/26/20182/27/2018 7:59:21 AM CANC
ESC15-00094 General Inspection2/26/20182/26/20182/27/2018 7:58:48 AM CANC
ESC17-00410 Random Inspection2/26/20182/26/20182/26/2018 4:58:18 PMPPASS
Project complete. No DI bag installed on receiving inlet, west of site. No loose construction materials. Yard landscaped, home occupied. ESC permit finaled.
ESC17-00111 General Inspection2/22/20182/26/20182/26/2018 4:57:35 PMPPASS
No trackout to Bogart, no discharges offsite observed. No corrections requested
ESC17-00410 DOC - Permit Finaled2/26/20182/26/20182/26/2018 4:56:02 PMPPASS
ESC16-00955 Random Inspection2/26/20182/26/20182/26/2018 4:03:50 PMPPASS
Home is near completion. Driveway now paved. No sediment runoff observed. Some perimeter controls are in place. Needs landscaping this spring for ESC final.
ESC17-00974 Random Inspection2/26/20182/26/20182/26/2018 3:57:11 PMPPASS
Wattles were installed as directed. No activity at time of inspection. site properly closed to prevent muddy runoff. No new corrections requested.
ESC17-00842 Random Inspection2/26/20182/26/20182/26/2018 3:53:23 PMPPEND
No new installations, no recent activity. No sediment runoff to sidewalks occuring, much of site still snow covered but is melting. Will continue to monitor
ESC18-00167 Site Preparation2/23/20182/26/20182/26/2018 3:41:10 PMAPASS
The project has started. Phone #: ###-#### Inspection requested via web by Eldon Oyadomari

Permit sign posted in alley. No trackout or muddy discharges from work area.
ESC17-00954 General Inspection2/26/20182/26/20182/26/2018 3:11:30 PMPPEND
Rock entrance has been widened and improved. Road was swept. Sediment filter bags installed at Bogus Basin Road are helping settle and trap sediment. Will need to be inspected for maintenance after draining.
No muddy runoff leaving site to Winsome gutters. Snow still melting on much of the area of disturbance..
ESC17-00398 DOC - Permit Finaled2/26/20182/26/20182/26/2018 2:51:06 PMPPASS
BLD permit for demolition finaled. No debris left onsite. No new activity, no runoff from site observed
ESC16-01293 DOC - Permit Finaled2/26/20182/26/20182/26/2018 2:45:21 PMPPASS
Basement phase of project complete. WIP on detached garage, see ESC17-00749. This permit finaled.
ESC17-00880 Random Inspection2/26/20182/26/20182/26/2018 2:42:08 PMPPASS
ESC17-00929 General Inspection2/26/20182/26/20182/26/2018 2:39:46 PMPPASS
WIP. Perimeter sidewalks preserved. Trash contained. No trackout or discharges observed
ESC17-00930 General Inspection2/26/20182/26/20182/26/2018 2:39:32 PMPPASS
WIP. Perimeter sidewalks preserved. Trash contained. No trackout or discharges observed
ESC17-01494 Random Inspection2/26/20182/26/20182/26/2018 2:37:44 PMPPASS
WIP. No trackout or discharges. Driveway to detached garage now paved.
ESC04-01088 DOC - Permit Finaled2/26/20182/26/20182/26/2018 2:35:15 PMPPASS
ESC17-01346 Site Preparation2/22/20182/26/20182/26/2018 2:32:53 PMPCANC
rescheduled
ESC18-00148 Site Preparation2/26/20182/26/20182/26/2018 2:16:28 PMPPASS
Tammy Phone #: ###-####

New detatched garage to be built on exisiting pad. Paved access to construction area. Vegetation to be preserved between project and back hillside. Stormwater stays on site, yard below grade of road, no MS4. ESC permit sign posted.

Approved.
ESC17-00027 Random Inspection2/26/20182/26/20182/26/2018 12:53:03 PMPPASS
No trackout from site. Access to Victory is blocked off. Perimeter controls and sediment protection on MS4 inlets is installed.
ESC16-01729 General Inspection2/26/20182/26/20182/26/2018 11:58:47 AM PASS
Silt fence perimeter installed along north side of site. No work occuring at time of inspeciton, there is one section not yet paved or built upon. No violations. BLD has temp. occupancy
ESC17-00011 General Inspection2/26/20182/26/20182/26/2018 11:37:09 AM PASS
Interior work only. No staging or equipment traffic from adjacent open space/former staging area. No corrections requested
ESC16-01292 Aging Inspection2/26/20182/26/20182/26/2018 11:35:16 AM PASS
Project complete, need to check stabilization and temporary BMP removal. Site currently snow covered. No trackout or muddy discharges from site.
ESC17-00203 General Inspection2/26/20182/26/20182/26/2018 11:06:05 AM PASS
WIP on interior. No earthwork occuring, much of site is snow covered. No trackout to Elite.
ESC17-00146 Aging Inspection2/26/20182/26/20182/26/2018 11:03:34 AM PASS
ESC17-01680 General Inspection2/23/20182/26/20182/26/2018 10:51:00 AMPPASS
WIP. Subdivsion BMPs installed. This is in DHE#16, google maps incorrect.
ESC17-00215 General Inspection2/26/20182/26/20182/26/2018 10:05:53 AM PASS
Minimal work occuring during wet winter weather this morning. Workers parking across the street to avoid trackout from site. No offsite discharges or trackout observed. No loose trash next to road.