PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Wednesday, February 28, 2018
.
Number of inspections:
12
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC17-00526
General Inspection
2/28/2018
2/28/2018
3/2/2018 10:36:01 AM
PASS
WIP on new bathroom facility. No sediment runoff around perimeter, grassy strip preserved. no trackout . Trash is contained. Permits on site.
ESC17-00078
General Inspection
2/28/2018
2/28/2018
3/1/2018 3:39:13 PM
CANC
ESC17-01402
BMP Violation
2/21/2018
2/28/2018
3/1/2018 11:46:57 AM
P
PASS
check for new DI bag on Canonero
DI bag installed as requested at end of shared driveway. No trackout or other violations observed. Site is in compliance.
ESC17-00027
Complaint Inspection
2/28/2018
2/28/2018
3/1/2018 11:19:29 AM
P
FAIL
excessive trackout reported 2/28
Significant activity on site, lots of earthwork and hauling in and out occuring with dump trucks and concrete trucks.
Construction entrance for main site access covered in mud. No mainteance or rock added to prevent trackout. Extends out to Cole Road to Victory. Did not see a sweeper unit on site.
Perimeter silt fence installed, receiving storm drains have sediment protection.
Corrections:
Install construction entrance or track pad. Alternatively clean tires.
ESC18-00069
Site Preparation
2/27/2018
2/28/2018
2/28/2018 3:00:08 PM
P
PASS
2:30 PM with Guho Construction; meet at Idaho & 8th in front of Fork
Onsite meeting with Anthony, Tom, and Dave (?) with Guho Construction.
Phase 1 of project is linear project to replace curbing and install side walk improvements along 8th street between Main and Idaho. Next phase will be re-surfacing Union block alley and Freak Alley. Silva cells and improvements along east side of Capitol south of Main Street will also occur.
Storm drains have sediment filter bags installed on all inlets with work area. Other BMPs will be sweeping after temporary stockpiling, controlling concrete and paver cutting dust, and regular trash pickup. Reminded crew that all temporary DI bags installed for project must be removed.
Approved for construction.
ESC17-00246
General Inspection
2/28/2018
2/28/2018
2/28/2018 1:23:15 PM
PASS
WIP on interior. Frame and home footprint complete. Workers parking on street. Back slope vegetation preserved. No trackout or discharges. Approved.
ESC17-01670
General Inspection
2/21/2018
2/28/2018
2/28/2018 11:48:49 AM
P
PASS
Lined concrete washout now installed for CBH in South Fork sub. No new corrections.
ESC17-00301
Aging Inspection
2/28/2018
2/28/2018
2/28/2018 8:33:41 AM
PASS
Project complete. All permits finaled. No ESC issues
ESC17-00301
DOC - Permit Finaled
2/28/2018
2/28/2018
2/28/2018 8:33:26 AM
P
PASS
ESC16-01505
Aging Inspection
2/28/2018
2/28/2018
2/28/2018 8:14:36 AM
CANC
ESC16-00329
General Inspection
2/28/2018
2/28/2018
2/28/2018 8:06:20 AM
CANC
ESC17-01088
General Inspection
2/21/2018
2/28/2018
2/27/2018 3:28:58 PM
P
CANC