Inspections for the day of: Wednesday, February 28, 2018.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00526 General Inspection2/28/20182/28/20183/2/2018 10:36:01 AM PASS
WIP on new bathroom facility. No sediment runoff around perimeter, grassy strip preserved. no trackout . Trash is contained. Permits on site.
ESC17-00078 General Inspection2/28/20182/28/20183/1/2018 3:39:13 PM CANC
ESC17-01402 BMP Violation2/21/20182/28/20183/1/2018 11:46:57 AMPPASS
check for new DI bag on Canonero

DI bag installed as requested at end of shared driveway. No trackout or other violations observed. Site is in compliance.
ESC17-00027 Complaint Inspection2/28/20182/28/20183/1/2018 11:19:29 AMPFAIL
excessive trackout reported 2/28

Significant activity on site, lots of earthwork and hauling in and out occuring with dump trucks and concrete trucks.

Construction entrance for main site access covered in mud. No mainteance or rock added to prevent trackout. Extends out to Cole Road to Victory. Did not see a sweeper unit on site.

Perimeter silt fence installed, receiving storm drains have sediment protection.

Corrections:

Install construction entrance or track pad. Alternatively clean tires.
ESC18-00069 Site Preparation2/27/20182/28/20182/28/2018 3:00:08 PMPPASS
2:30 PM with Guho Construction; meet at Idaho & 8th in front of Fork

Onsite meeting with Anthony, Tom, and Dave (?) with Guho Construction.

Phase 1 of project is linear project to replace curbing and install side walk improvements along 8th street between Main and Idaho. Next phase will be re-surfacing Union block alley and Freak Alley. Silva cells and improvements along east side of Capitol south of Main Street will also occur.

Storm drains have sediment filter bags installed on all inlets with work area. Other BMPs will be sweeping after temporary stockpiling, controlling concrete and paver cutting dust, and regular trash pickup. Reminded crew that all temporary DI bags installed for project must be removed.

Approved for construction.
ESC17-00246 General Inspection2/28/20182/28/20182/28/2018 1:23:15 PM PASS
WIP on interior. Frame and home footprint complete. Workers parking on street. Back slope vegetation preserved. No trackout or discharges. Approved.
ESC17-01670 General Inspection2/21/20182/28/20182/28/2018 11:48:49 AMPPASS
Lined concrete washout now installed for CBH in South Fork sub. No new corrections.
ESC17-00301 Aging Inspection2/28/20182/28/20182/28/2018 8:33:41 AM PASS
Project complete. All permits finaled. No ESC issues
ESC17-00301 DOC - Permit Finaled2/28/20182/28/20182/28/2018 8:33:26 AMPPASS
ESC16-01505 Aging Inspection2/28/20182/28/20182/28/2018 8:14:36 AM CANC
ESC16-00329 General Inspection2/28/20182/28/20182/28/2018 8:06:20 AM CANC
ESC17-01088 General Inspection2/21/20182/28/20182/27/2018 3:28:58 PMPCANC