Inspections for the day of: Friday, February 28, 2020.
Number of inspections: 12
Percentage of inspections complete: 92 %
Percentage of inspections not complete: 8 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01472 General Inspection2/21/20202/21/2020   
ESC19-00398 Site Final2/26/20202/28/20203/5/2020 2:27:18 PMPPEND
will monitor hydroseeding growth
MIS20-00070 ESC-Conference2/27/20202/28/20203/4/2020 4:31:40 PMAPEND
Met with building owner Jon ###-####. Disturbance occurred digging out side of the shelter to install new fire & sprinkler lines.

Review stormwater and erosion controls that should be implemented.

1. Berm road to prevent flow of water down the roof access to the slope
2. Rake in seeding into the bare/disturbed areas
3. Install perimeter control wattles around disturbed slope
4. Install slope interupting/water check wattles on the roof access road.

Will follow up in 2 weeks.

ESC19-00241 General Inspection2/28/20202/28/20203/4/2020 4:18:15 PM PASS
BMPs installed include perimeter sediment controls, concrete washout pits, controlled access.

WIP prepping front parking lot off curling.

Minor trackout. occuring. Agreed to allow frequent sidewalk and street sweeping in lieu of construction entrance. Site has pit run and drainage established with minimal muddy spots

Trash contained, spill kit onsite. RP on full time duty at site.

Approved.
ESC19-00114 General Inspection2/28/20202/28/20203/2/2020 3:32:15 PM PASS
No sediment runoff or erosion observed. No vegetation establishment yet
ESC19-00283 General Inspection2/28/20202/28/20203/2/2020 3:09:15 PM CANC
ESC19-00522 General Inspection2/28/20202/28/20203/2/2020 12:50:17 PM PASS
BMPs installed. 4th street staging area with no spills or significant sediment accumulation. No trackout. Receiving storm drains have sediment protection installed. Using concrete washout pans, located in non-muddy area. Permit sign posted. ESC trained people onsite.

Corrrection request to maintain/switch out storm drain bag on the SW corner of project on Myrtle. Filled with sand and some cigarette butts.
ESC19-01256 General Inspection2/26/20202/28/20202/28/2020 4:49:18 PMAPASS
follow up inspection

Street in front of project was swept. Still should put some gravel down in front of the site for employee parking/material unloading
ESC19-01053 Tracking Control2/28/20202/28/20202/28/2020 10:48:21 AMPFAIL
Need to sweep gutter and sidewalk on Cole going southbound.

Request sent to RP.
ESC19-00617 Aging Inspection2/28/20202/28/20202/28/2020 8:23:26 AM DEFR
inspected by BLD inspector
ESC19-00438 General Inspection2/28/20202/28/20202/28/2020 8:21:31 AM CANC
rescheduled for site final
ESC19-00564 Aging Inspection2/28/20202/28/20202/28/2020 8:19:42 AM CANC