ESC16-01472
| General Inspection | 2/21/2020 | 2/21/2020 | | | |
|
|
|
ESC19-00398
| Site Final | 2/26/2020 | 2/28/2020 | 3/5/2020 2:27:18 PM | P | PEND |
|
|
will monitor hydroseeding growth
|
MIS20-00070
| ESC-Conference | 2/27/2020 | 2/28/2020 | 3/4/2020 4:31:40 PM | A | PEND |
|
|
Met with building owner Jon ###-####. Disturbance occurred digging out side of the shelter to install new fire & sprinkler lines.
Review stormwater and erosion controls that should be implemented.
1. Berm road to prevent flow of water down the roof access to the slope 2. Rake in seeding into the bare/disturbed areas 3. Install perimeter control wattles around disturbed slope 4. Install slope interupting/water check wattles on the roof access road.
Will follow up in 2 weeks.
|
ESC19-00241
| General Inspection | 2/28/2020 | 2/28/2020 | 3/4/2020 4:18:15 PM | | PASS |
|
|
BMPs installed include perimeter sediment controls, concrete washout pits, controlled access.
WIP prepping front parking lot off curling.
Minor trackout. occuring. Agreed to allow frequent sidewalk and street sweeping in lieu of construction entrance. Site has pit run and drainage established with minimal muddy spots
Trash contained, spill kit onsite. RP on full time duty at site.
Approved.
|
ESC19-00114
| General Inspection | 2/28/2020 | 2/28/2020 | 3/2/2020 3:32:15 PM | | PASS |
|
|
No sediment runoff or erosion observed. No vegetation establishment yet
|
ESC19-00283
| General Inspection | 2/28/2020 | 2/28/2020 | 3/2/2020 3:09:15 PM | | CANC |
|
|
|
ESC19-00522
| General Inspection | 2/28/2020 | 2/28/2020 | 3/2/2020 12:50:17 PM | | PASS |
|
|
BMPs installed. 4th street staging area with no spills or significant sediment accumulation. No trackout. Receiving storm drains have sediment protection installed. Using concrete washout pans, located in non-muddy area. Permit sign posted. ESC trained people onsite.
Corrrection request to maintain/switch out storm drain bag on the SW corner of project on Myrtle. Filled with sand and some cigarette butts.
|
ESC19-01256
| General Inspection | 2/26/2020 | 2/28/2020 | 2/28/2020 4:49:18 PM | A | PASS |
|
|
follow up inspection
Street in front of project was swept. Still should put some gravel down in front of the site for employee parking/material unloading
|
ESC19-01053
| Tracking Control | 2/28/2020 | 2/28/2020 | 2/28/2020 10:48:21 AM | P | FAIL |
|
|
Need to sweep gutter and sidewalk on Cole going southbound.
Request sent to RP.
|
ESC19-00617
| Aging Inspection | 2/28/2020 | 2/28/2020 | 2/28/2020 8:23:26 AM | | DEFR |
|
|
inspected by BLD inspector
|
ESC19-00438
| General Inspection | 2/28/2020 | 2/28/2020 | 2/28/2020 8:21:31 AM | | CANC |
|
|
rescheduled for site final
|
ESC19-00564
| Aging Inspection | 2/28/2020 | 2/28/2020 | 2/28/2020 8:19:42 AM | | CANC |
|
|
|