ESC16-00136
| General Inspection | 2/29/2016 | 2/29/2016 | 3/2/2016 1:49:46 PM | P | DONE |
|
|
change RP to Robert McCausslin...
|
ESC16-00242
| General Inspection | 2/24/2016 | 2/29/2016 | 3/2/2016 9:17:54 AM | A | PASS |
|
|
10 AM walk through inspection. Meet at Micron Gate C at the stop light on Federal Way.
Jerry ###-####
Meeting and inspection performed Monday 2/29/2016. The inspection started with a meeting with the project’s storm water pollution prevention team. The team consists of M+W Construction and Micron representatives. City of Boise ESC Permit conditions and prospective inspection frequency for the project was reviewed and discussed. The items mentioned included: • A City of Boise ESC Inspector will inspect the project at a minimum of once a month. Inspections may consist of a site walk through and observation of construction site pollution prevention BMPs and a meeting. Inspections of track-out to Federal Way, checking for significant fugitive dust plumes, and the discharge point into Fivemile Creek will also occur without a full walk through. • City of Boise ESC Division responds to all complaints received regarding an active construction sites, which results in an inspection. • The project storm water team shall be notified when inspections are conducted and the inspection results can be reviewed at http://pdsonline.cityofboise.org/pdsonline/details.aspx?id=ESC16-00242 • Micron may request an inspection by the ESC division by ###-#### or ###-#### • If an inspection results in the need for a corrective action, a Correction Request will be issued with set time of compliance depending on the urgency – for example, if a turbid/polluted storm water discharge is occurring, corrections would need to be made immediately. Street sweeping and BMP maintenance typically have 2-3 day compliance times. There were no points of contention with the above topics that were brought to attention. The stamped and approved SWPPP notebook prepared for the project was presented and reviewed. All required forms including a site map with BMPs indicated, NOI form for CGP permit, signed Certification Statements, narrative of BMPs installation and maintenance procedure, inspection form templates, and corrective action forms. The SWPPP is very comprehensive and easy to follow. • SWPPP inspection frequency is once per week by members of the storm water team using the inspection template that has all BMPs on site listed. • Corrections and maintenance procedures are noted on the form as well as a site map that is included as part of the template. Changes are then added to the master SWPPP site map. • BMPs include perimeter sediment control around the active building footprint, sediment control silt filter bags on all on-site storm drains, wattles used to intercept/trap larger sediment in gutters before entering bags, rock construction entrances for the haul roads, plan for fugitive dust control as needed, and designated material storage and spill prevention practices. • There were no corrections needed on the SWPPP and record keeping.
|
ESC15-00427
| General Inspection | 2/29/2016 | 2/29/2016 | 3/1/2016 1:44:33 PM | | CANC |
|
|
|
ESC15-00378
| General Inspection | 2/29/2016 | 2/29/2016 | 3/1/2016 11:58:33 AM | | PART |
|
|
Need to sweep up some trackout and loose dirt coming off driveway slope. Hillside BMPs are in good condtion.
Perform maintenance on the DI bag on HIll Road. Will check in with RP next inspection.
|
ESC15-00015
| Aging Inspection | 2/29/2016 | 2/29/2016 | 3/1/2016 11:41:16 AM | | PASS |
|
|
No activity. No trackout or discharges. Noticed that asphalt at end of culdesac has sunk and cracked around the sewer manhole.
|
ESC13-00600
| Aging Inspection | 2/29/2016 | 2/29/2016 | 3/1/2016 11:16:09 AM | | PASS |
|
|
BLD open for interior work only. Lot is now surrounded by vegetative perimeter and has an asphalt driveway. No further ESC inspecitons necessary. ESC permit finaled.
|
ESC14-00484
| Aging Inspection | 2/29/2016 | 2/29/2016 | 3/1/2016 11:00:09 AM | | PASS |
|
|
WIP. No violations
|
ESC14-00356
| Site Final | 2/29/2016 | 2/29/2016 | 3/1/2016 8:06:39 AM | P | NR |
|
|
Scott ###-####
Need to remove trash and building materials from adjacent lot. Stabilize disturbed area and remove DI bag
|
ESC15-00210
| General Inspection | 2/29/2016 | 2/29/2016 | 2/29/2016 7:44:32 PM | | CANC |
|
|
|
ESC15-00423
| General Inspection | 2/29/2016 | 2/29/2016 | 2/29/2016 7:43:28 PM | | CANC |
|
|
|
ESC15-00760
| Random Inspection | 2/29/2016 | 2/29/2016 | 2/29/2016 11:53:14 AM | P | PASS |
|
|
WIP on remodel. No earthwork occuring at time of construction. Some landscaping and exterior work remains. No violations observed, permit posted in front window.
|
ESC16-00014
| Random Inspection | 2/29/2016 | 2/29/2016 | 2/29/2016 11:52:11 AM | P | PASS |
|
|
WIP on framing for straw bale home. No trackout or dishcarges from site. Permit sign posted. No corrections needed at this time.
|
ESC15-00360
| General Inspection | 2/29/2016 | 2/29/2016 | 2/29/2016 11:39:27 AM | | PASS |
|
|
revegetation phase. No construction, no corrections at this time.
|
ESC13-00755
| General Inspection | 2/29/2016 | 2/29/2016 | 2/29/2016 11:32:19 AM | | PART |
|
|
Still cannot final out permit due to two temp DI bags still installed and full of muck on Council Springs. Called Preston with Ada Sand & Gravel to remove the bags.
He stated he will make sure it is done this week and will call to notify me. Construction is complete at Terraces and this is the only remaining item to satisfy permit conditions.
|
ESC16-00136
| Site Preparation | 2/26/2016 | 2/29/2016 | 2/29/2016 9:27:54 AM | A | PASS |
|
|
TJ Phone #: ###-####
Subdivision BMPs installed. Flat lot in new development with same builder. Excavation to start tomorrow. Approved.
|
ESC15-00221
| General Inspection | 2/29/2016 | 2/29/2016 | 2/29/2016 8:48:44 AM | | PASS |
|
|
|