ESC14-00546
| Tracking Control | 2/3/2015 | 2/3/2015 | 2/3/2015 4:37:10 PM | P | PASS |
|
|
Trackout on sidewalk where a material truck drove across adajaent property has been swept and cleaned. Soil still too wet/muddy to see what revegetation /stabilization will be necessary.
Trash container has been removed and wind blown litter picked up. Sidewalk/gutter in front of home has been cleaned to remove loose sediment and construction litter/debris.
Approved. Need to address stabilization of disturbed areas but too wet for landscaping work currently.
|
ESC14-00899
| BMP Violation | 2/3/2015 | 2/3/2015 | 2/3/2015 4:17:15 PM | P | PASS |
|
|
check DI bag installation
DI bag has been installed as requested on 2/2. Installed and secured properly. Gravel bag also put in gutter to create ponding/stop sediment.
Approved for now. Once conditions dry a full site sweep up and installation perimeter BMPs will need to occur.
|
ESC14-00684
| General Inspection | 2/3/2015 | 2/3/2015 | 2/3/2015 4:09:33 PM | | CANC |
|
|
rescheduled for 2/4
|
ESC11-00879
| General Inspection | 2/3/2015 | 2/3/2015 | 2/3/2015 4:08:37 PM | | PART |
|
|
Perimeter sediment controls and inlet protection are installed and working effectively.
1 corrections for Jayo Construction: Provide lined concrete washout for the Somerset Village SFHs.
|
ESC14-01192
| BMP Violation | 2/3/2015 | 2/3/2015 | 2/3/2015 4:00:06 PM | P | FAIL |
|
|
Concrete washout performed in area without a lined pit or leakproof container.
Alert RP to properly train and inform cement contractors to use a designated washout.
|
ESC13-00918
| General Inspection | 2/3/2015 | 2/3/2015 | 2/3/2015 3:49:10 PM | | PASS |
|
|
No stockpiling at this point on parcel. Will need to remove silt fence before closing permit.
|
ESC13-00806
| General Inspection | 2/3/2015 | 2/3/2015 | 2/3/2015 3:46:47 PM | | PASS |
|
|
Perimeter silt fence and rock contsruction entrance installed. Permit info is posted. Limited activity at site. No corrections at this time.
|
ESC14-00442
| Aging Inspection | 2/3/2015 | 2/3/2015 | 2/3/2015 3:35:15 PM | | PASS |
|
|
WIP on home addition. No sediment or mud leaving site. No corrections
|
ESC14-00899
| Site Preparation | 2/2/2015 | 2/3/2015 | 2/3/2015 12:42:02 PM | A | CANC |
|
|
data entry error
|
ESC13-00344
| Random Inspection | 2/3/2015 | 2/3/2015 | 2/3/2015 10:56:30 AM | A | PASS |
|
|
Stormwater infrastructure and erosion control BMPs are handling storm runoff in Boulder Heights. Slopes previously hydroseeded are preventing hillside erosion and sediment blow outs.
After rain stops and water has drained, need to do maintenance on DI protection and scoop accumulated sediment that has been trapped.
Will continue to monitor.
|
ESC13-00755
| Conference | 2/3/2015 | 2/3/2015 | 2/3/2015 10:47:37 AM | P | DONE |
|
|
Site SWPPP coordinator JC from Petra called regarding some ESC issues at the Terraces.
Problems include trackout and offsite muddy runoff to surrounding gutters and storm drains.
Corrective actions are to check that DI bags are working and have capacity, add gutter bags in gutters at west entrances to stop sediment before it leaves site.
Cleaning up mud in gutters with shovels and street sweeping is also scheduled to occur, but the rain has been impeding progress.
I requested that corrective actions be documented in SWPPP file.
|
ESC13-01247
| General Inspection | 2/3/2015 | 2/3/2015 | 2/3/2015 10:29:53 AM | | PASS |
|
|
Warm Springs Mesa new drop inlets and slope drain are activitely draining stormwater. Surrounding slopes are revegetating and still have wattles installed. Rip rap instanlled seems to be effectively dissipating the flow and prevent drainage churn out or widening.
|
ESC13-00213
| General Inspection | 2/3/2015 | 2/3/2015 | 2/3/2015 10:21:25 AM | | CANC |
|
|
|
ESC14-00777
| General Inspection | 2/3/2015 | 2/3/2015 | 2/3/2015 9:55:59 AM | | PASS |
|
|
WIP on building addition. The construction area is below the grade of Eagleson. No runoff from site observed; no trackout. Approved.
|
ESC14-00813
| Aging Inspection | 2/3/2015 | 2/3/2015 | 2/3/2015 9:38:32 AM | | PASS |
|
|
Cell tower upgrade to existing towers complete. No disturbed area or excated dirt. ESC permit finaled.
|
ESC14-00813
| DOC - Permit Finaled | 2/3/2015 | 2/3/2015 | 2/3/2015 9:15:16 AM | P | PASS |
|
|
|
ESC14-00781
| General Inspection | 2/3/2015 | 2/3/2015 | 2/3/2015 8:45:58 AM | | PASS |
|
|
Staging area still in use for Winco remodel, which is all interior work. No trackout, runoff, or improper material storage observed.
|