Inspections for the day of: Monday, February 4, 2019.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00836 Site Final2/4/20192/4/20192/5/2019 8:07:53 AMPNR
This permit is open for adjacent lot 420 Sherman that was accessed during project and had erosion issues. This lot had plan under review but is now again expired. Will continue to monitor.
ESC18-01484 Complaint Inspection2/4/20192/4/20192/4/2019 5:01:27 PMPFAIL
Need to sweep sidewalk and gutter in front of home

NO trackout in alley or loose trash.
ESC18-01782 BMP Violation2/4/20192/4/20192/4/2019 4:51:16 PMPFAIL
Uncontained concrete washout conducted on adjacent lot. Follow up inspection scheduled.
ESC18-00946 BMP Violation2/4/20192/4/20192/4/2019 4:50:18 PMPFAIL
Muddy runoff from site. No RP or crew onsite to monitor runoff or attempt corrective actions.

Special investigation fee charged for have tracking mud in Crane Creek to source.

Immediate BMP maintenance is needed.
ESC17-00954 General Inspection2/4/20192/4/20192/4/2019 4:48:47 PM FAIL
Evidence of muddy runoff and erosion occuring on upper area that discharges to the access road to the common area.

Corrections neeeded:

- Fix berm at end of culdesac and install addition perimeter controls as well as slope interupting wattles
- clean up and/or replace all gravel check bags
- check on sediment filter bags to do maintenance once water drains through.
ESC17-01538 General Inspection2/4/20192/4/20192/4/2019 1:47:54 PM PEND
parcel currently being utilized for river bank repair staging area as well as the stockpiles that were in the area. See also ESC18-01442
ESC18-01268 Site Final2/4/20192/4/20192/4/2019 12:51:34 PMPPASS
Home complete. Subdivision BMPs to remain installed for active construction.
ESC18-01177 Site Final2/4/20192/4/20192/4/2019 12:51:15 PMPPASS
Home complete. Subdivision BMPs to remain installed for active construction.
ESC18-01175 Site Final2/4/20192/4/20192/4/2019 12:50:28 PMPPASS
Home complete. Subdivision BMPs to remain installed for active construction.
ESC17-00225 Aging Inspection2/4/20192/4/20192/4/2019 12:42:00 PM CANC
ESC18-01268 BMP Violation2/4/20192/4/20192/4/2019 11:08:45 AMPPASS
Corrective actions completed:

- new lined washout with sign has been installed
- old washouts cleaned up
- trash picked up
- street swept
- workers are not parking on open muddy lots.
- RP onsite for subdivision walkthrough

Correction request:
- allow DI sediment bags to drain and do maintenance on all inlets. Remove dirt and mud collected at surface prior to changing DI bags
ESC17-00836 General Inspection2/4/20192/4/20192/4/2019 8:15:09 AM CANC