Inspections for the day of: Tuesday, February 5, 2019.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01244 Conference2/5/20192/5/20192/11/2019 9:38:44 AMPCANC
ESC18-01484 General Inspection2/4/20192/5/20192/11/2019 8:18:26 AMPCANC
ESC18-01375 Conference2/5/20192/5/20192/8/2019 1:47:40 PMPCANC
rescheduled
ESC18-01782 BMP Violation2/4/20192/5/20192/8/2019 9:55:16 AMPCANC
rescheduled.
ESC18-00020 General Inspection2/4/20192/5/20192/7/2019 12:03:06 PMPPART
No significant trackout, loose trash, new hillside erosion or other issues in subdivision. Construction entrances are installed on the upper staging area and at the new middle road access point.

Corrections needed:

- change out full sediment bags on Trapper, just up the block from Barber Drive

- fix sediment runoff from lot 2 block 1 at Barber
and Trapper

- check that when storm drain grates are reinstalled during BMP maintenance they are facing the correct way , with the angle of the grates opening up hill so that stormwater does not flow over grate.
ESC18-00922 General Inspection2/5/20192/5/20192/6/2019 11:30:53 AMPPASS
Permit posted. Site is clean and fenced in. Grassy buffer preserved to act as perimeter control along Boise Avenue. No trackout to High Street.

Correction request to install sediment protection on storm drain on Boise Avenue.
ESC17-00225 Site Final2/4/20192/5/20192/6/2019 11:19:39 AMPPASS
Home complete and landscaped. No ESC requests. Permit finaled.
ESC18-01188 General Inspection2/1/20192/5/20192/6/2019 11:14:44 AMPPART
Sediment protection installed on adajecent property's parking lot storm drain. May need to be cleaned out at end of project.

Most trash picked up, one container up front was removed. One still in back. More trash pick up requested on the north side of property.

Request to pick up trash. Install concrete washout containment for upcoming driveway work.



ESC18-00946 Stop Work Order2/5/20192/5/20192/6/2019 8:35:49 AMPCANC
duplicate entry
ESC18-00946 Stop Work Order2/5/20192/5/20192/6/2019 8:35:31 AMADONE
Per Andy L.

RP-GC notified of SWO issued for illicit discharges that occurred Feb 3 &4. Need to complete corrections listed in SWO notice:

- clean up all mud and dirt on pavement
- clean out mud captured behind wattles
- install BMPs per ESC site map and consult project's civil engineer/plan designer

SWO issued 2/5 PM. Compliance date is 2/12 PM
ESC18-00946 Conference2/5/20192/5/20192/5/2019 4:53:57 PMPCANC
ESC18-01395 Site Final2/1/20192/5/20192/4/2019 12:27:31 PMAPASS
See ESC18-01188. Demo complete. Duplex in progress.