ESC18-01244
| Conference | 2/5/2019 | 2/5/2019 | 2/11/2019 9:38:44 AM | P | CANC |
|
|
|
ESC18-01484
| General Inspection | 2/4/2019 | 2/5/2019 | 2/11/2019 8:18:26 AM | P | CANC |
|
|
|
ESC18-01375
| Conference | 2/5/2019 | 2/5/2019 | 2/8/2019 1:47:40 PM | P | CANC |
|
|
rescheduled
|
ESC18-01782
| BMP Violation | 2/4/2019 | 2/5/2019 | 2/8/2019 9:55:16 AM | P | CANC |
|
|
rescheduled.
|
ESC18-00020
| General Inspection | 2/4/2019 | 2/5/2019 | 2/7/2019 12:03:06 PM | P | PART |
|
|
No significant trackout, loose trash, new hillside erosion or other issues in subdivision. Construction entrances are installed on the upper staging area and at the new middle road access point.
Corrections needed:
- change out full sediment bags on Trapper, just up the block from Barber Drive
- fix sediment runoff from lot 2 block 1 at Barber and Trapper
- check that when storm drain grates are reinstalled during BMP maintenance they are facing the correct way , with the angle of the grates opening up hill so that stormwater does not flow over grate.
|
ESC18-00922
| General Inspection | 2/5/2019 | 2/5/2019 | 2/6/2019 11:30:53 AM | P | PASS |
|
|
Permit posted. Site is clean and fenced in. Grassy buffer preserved to act as perimeter control along Boise Avenue. No trackout to High Street.
Correction request to install sediment protection on storm drain on Boise Avenue.
|
ESC17-00225
| Site Final | 2/4/2019 | 2/5/2019 | 2/6/2019 11:19:39 AM | P | PASS |
|
|
Home complete and landscaped. No ESC requests. Permit finaled.
|
ESC18-01188
| General Inspection | 2/1/2019 | 2/5/2019 | 2/6/2019 11:14:44 AM | P | PART |
|
|
Sediment protection installed on adajecent property's parking lot storm drain. May need to be cleaned out at end of project.
Most trash picked up, one container up front was removed. One still in back. More trash pick up requested on the north side of property.
Request to pick up trash. Install concrete washout containment for upcoming driveway work.
|
ESC18-00946
| Stop Work Order | 2/5/2019 | 2/5/2019 | 2/6/2019 8:35:49 AM | P | CANC |
|
|
duplicate entry
|
ESC18-00946
| Stop Work Order | 2/5/2019 | 2/5/2019 | 2/6/2019 8:35:31 AM | A | DONE |
|
|
Per Andy L.
RP-GC notified of SWO issued for illicit discharges that occurred Feb 3 &4. Need to complete corrections listed in SWO notice:
- clean up all mud and dirt on pavement - clean out mud captured behind wattles - install BMPs per ESC site map and consult project's civil engineer/plan designer
SWO issued 2/5 PM. Compliance date is 2/12 PM
|
ESC18-00946
| Conference | 2/5/2019 | 2/5/2019 | 2/5/2019 4:53:57 PM | P | CANC |
|
|
|
ESC18-01395
| Site Final | 2/1/2019 | 2/5/2019 | 2/4/2019 12:27:31 PM | A | PASS |
|
|
See ESC18-01188. Demo complete. Duplex in progress.
|