Inspections for the day of: Wednesday, February 6, 2019.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01472 General Inspection2/6/20192/6/20192/12/2019 2:29:01 PM CANC
rescheduled
ESC18-01444 General Inspection2/5/20192/6/20192/8/2019 1:53:41 PMACANC
rescheduled for site preparation inspection.
ESC17-01559 Aging Inspection2/6/20192/6/20192/8/2019 11:30:21 AM PASS
No new construction activity. No sediment runoff or other issues observed. Large vegetated stockpiles on site. BLD permit has not been issued but was recently extended 180 days on 12/11/2018
ESC18-01710 BMP Violation2/1/20192/6/20192/7/2019 4:25:31 PMAPART
Ecopan washouts provided as requested. Dumped washout appears to have been covered with backfill.

One washout already full and concrete delivery person had poor aim. Clean up required. Should surround with a berm or dig a hole to set the washout container in.

Corrections requested to Garry
ESC17-01342 Aging Inspection2/6/20192/6/20192/7/2019 4:02:56 PM CANC
ESC18-01497 BMP Violation2/4/20192/6/20192/7/2019 4:00:21 PMAFAIL
No new violations. Concrete washout dumped on ground in Hilton still not cleaned up
ESC18-01432 Site Preparation2/6/20192/6/20192/7/2019 3:49:08 PMPPASS
Site walk through conducted with RP & site superintendent Cory w/ ESI.

Site entrance is at SE corner of project via Broadway (road to St. Luke's parking). Existing asphalt to remain. Rock construction exit with rumble bars is installed at SW end. Trucks will exit here and proceed to EB Warm Springs.

- surrounding MS4 storm drains have sediment protection. Private drain on St. Lukes road is also protected.
- ecopans will be used for washout
- secondary containment to be installed for onsite fueling

Approved for construction. Permit sign posted at entrance and on job trailer.
ESC16-01650 General Inspection2/6/20192/6/20192/7/2019 2:15:02 PM FAIL
Concrete washout operated by Blackrock is not compliant. Spills and not fully lined. Too deep and potentially dangerous.
ESC18-00946 Conference2/5/20192/6/20192/6/2019 5:07:06 PMPDONE
1:00 PM

Reviewed corrective actions to be completed and new ESC site map sent to RP. Silt fence to be installed on main terrace to keep water away from slope and direct flow to the driveway, which will have check dams to slow velocity and an additional silt fence retention area at bottom of driveway.

Mud behind wattles has been scooped out as request. Need to finish sweep up when the mud thaws and gather BMPs to be ready for installation when there is a good weather window.


Corrective actions in progress.
ESC16-00936 General Inspection2/6/20192/6/20192/6/2019 4:19:01 PM CANC