Inspections for the day of: Thursday, February 9, 2017.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01476 Site Preparation2/9/20172/9/20172/10/2017 10:28:13 AMPPASS
Approved for construction. RP-GC to post permit sign on billboard. Crew finishing up sewer connections and keeping the street clean. Reviewed housekeeping BMPs and hauling away excess backfill from excavation to avoid sediment running off site.

Approved for construction.
ESC16-00489 General Inspection2/9/20172/9/20172/9/2017 3:56:59 PM CANC
ESC15-00853 General Inspection2/9/20172/9/20172/9/2017 3:56:36 PM PASS
No trackout or discharges to Hill Road observed. No corrections at this time.
ESC16-00429 Aging Inspection2/9/20172/9/20172/9/2017 3:55:56 PM CANC
ESC16-00703 Aging Inspection2/9/20172/9/20172/9/2017 3:55:45 PM CANC
ESC16-00705 Aging Inspection2/9/20172/9/20172/9/2017 3:55:37 PM CANC
ESC16-00694 Aging Inspection2/9/20172/9/20172/9/2017 3:55:23 PM CANC
ESC16-00683 General Inspection2/9/20172/9/20172/9/2017 3:54:44 PM CANC
rescheduled 2/15
ESC16-00701 Aging Inspection2/9/20172/9/20172/9/2017 3:52:17 PM CANC
ESC15-00857 General Inspection2/9/20172/9/20172/9/2017 3:51:10 PMPPEND
follow up inspection for corrective actions

Developer excavated drainage trench on lot to direct water away from saturated and eroded slope area. Sandbags placed along back patio of home receiving mud from slide. Additional response and corrections in progress.
ESC14-01083 General Inspection2/9/20172/9/20172/9/2017 2:07:35 PM CANC
ESC15-00871 General Inspection2/9/20172/9/20172/9/2017 2:07:25 PM CANC
ESC15-00857 Complaint Inspection2/9/20172/9/20172/9/2017 11:35:22 AMPFAIL
Significant mudslide due to infiltration of pooled snowmelt and rainwater on graded lot of EC#9 above homes on Arrow Villa. Slope became saturated.

Corrective:
- assist homeowner with clean up and mitigation
- work to drain the upper lots on top of this ridge, may direct to street or stormwater conveyance swale next to Arrow Villa

Investigation and corrections in progress. Follow up scheduled
ESC14-00989 General Inspection2/9/20172/9/20172/9/2017 11:32:10 AM CANC
ESC16-00557 General Inspection2/9/20172/9/20172/9/2017 11:31:57 AM CANC