Inspections for the day of: Tuesday, March 1, 2016.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00206 General Inspection2/24/20163/1/20163/4/2016 2:51:51 PMPPASS
WIP on SFHs in Sunnyridge. No discharges, resident complaints, or other violations. Subdivision storm drains have sediment protection. Designated washout is being utilized.
ESC15-00509 General Inspection3/1/20163/1/20163/2/2016 2:01:36 PM PASS
No trackout, sediment control BMPs installed below home, no windblown trash or loose material leaving site. No corrections.
ESC14-01083 General Inspection3/1/20163/1/20163/1/2016 3:56:57 PM PASS
BMPs installed and in good condition. No trackout or discharges from site. No corrections at this time.
ESC15-00785 Aging Inspection3/1/20163/1/20163/1/2016 3:48:08 PM PASS
Home is complete and occupied. Yard is to be landscaped by homeowner. No trackout or sediment leaving site to stormwater system. No further ESC inspections required. Conditions satisfied.
ESC15-00785 DOC - Permit Finaled3/1/20163/1/20163/1/2016 3:46:21 PMPPASS
ESC15-01288 Site Preparation3/1/20163/1/20163/1/2016 3:39:47 PMPPASS
Excavation for River Heights is to begin later this week. Site walk through conducted.

Over the next couple days Brighton and Syman Company will install BMPs such as perimeter sediment control wattles along Warm Springs, silt fence along the existing neighborhood to the southwest, and a heavy duty angular rock construction entrance.

The small drainage area is to be filled in for the development and run-on to the subdivision controlled by retaining ponds and diversion channels/pipes.

Approved to mobilize. Will monitor over the following week as work begins to check that all BMPs are installed as discussed.
ESC15-00719 Aging Inspection3/1/20163/1/20163/1/2016 3:14:29 PM PART
Home complete. Landscaping along Tao for multipile projects is in progress.

Need to sweeep up trackout and improve fugitve dust control on the haul road...CR issued to Tahoe.
ESC16-00111 Site Preparation2/29/20163/1/20163/1/2016 3:10:42 PMAPART
Clint Phone #: ###-####

Permit sign posted and new lined concrete washout has been installed for new phase of EV as requested.

Landscaping operation for getting topsoil is causing trackout and dust issues. Correction request to sweep affected streets and designated a rout that will limit disturbance.
ESC15-01513 BMP Violation2/23/20163/1/20163/1/2016 2:24:12 PMACANC
follow up on dirty culdesac

compliance date extended to Thursday 3/3
ESC15-00699 General Inspection3/1/20163/1/20163/1/2016 1:45:54 PM CANC
ESC15-00581 General Inspection3/1/20163/1/20163/1/2016 1:30:46 PM PASS
WIP on hotel renovation. No trackout, discharges. MS4 on Sunrise Rim and private structures on site have sediment protection.
ESC13-00600 DOC - Permit Finaled3/1/20163/1/20163/1/2016 11:15:19 AMPPASS
ESC14-00983 General Inspection3/1/20163/1/20163/1/2016 10:46:09 AM PASS
WIP on finishing foundations for the two 28 plex buildings. No significant trackout, DI bag on MS4 on Opohonga is installed and has filtering capacity. Utility line not yet patched in street.

Provided both RPs Pat and Jeremy, who were on site a new yellow ESC sign to post.

Approved.
ESC14-00590 Aging Inspection3/1/20163/1/20163/1/2016 9:52:14 AM PASS
ESC14-00589 Aging Inspection3/1/20163/1/20163/1/2016 9:52:05 AM PASS
ESC13-00684 General Inspection3/1/20163/1/20163/1/2016 9:32:30 AM PASS
ESC15-00729 General Inspection2/24/20163/1/20162/29/2016 2:31:19 PMPPASS
Walk through inspection of Council Springs Creek area and inspection of slope stabilization with Syman Company foreman Andy.

Silt fence and vegetative buffer along Council Springs Creek has been maintained and no areas of disturbed area affecting the creek were observed.

It was noted that the culverts recently installed under the access road will need modification to allow water to flow through the culvert pipe instead of infiltraing and pool below the level of the flared entrance.

No active constuction around the creek crossing. Check dam and silt fence filter area appear to be working. Water entering and leaving the work area is visibly very clear with no change of turbidity detectable by the eye.

Slopes:
- WIP on spreading topsoil, wattling at 20 foot intervals and applying a native grass seed mix with bonded fiber matrix hydomulch. Slopes will not need further grading have had BMPs applied. Grass seed is germinating and sprouting in some areas. No significant rill erosion or wattle failures observed.

No trackout at entrances and no stormwater related discharges from site. Staging area has secondary containment for fuel and other material containers. No windblown trash or fugitive dust issues at time of inspection.

No corrections issued at this time, site is currently in compliance and appears to be on schedule to handle spring time precipitation.